The European Organisation for the Safety of Air Navigation Civil-Military Workshop Integration of ASM, ATFCM and ATC Giuseppe Acampora EUROCONTROL DNM/COO/NOM/OPL/PRO.

Slides:



Advertisements
Similar presentations
Advanced Piloting Cruise Plot.
Advertisements

Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Presentation to the ICAO IVATF Montréal, 27 th – 30 th July 2010 EUROCONTROL/CFMU VOLCANIC ASH CRISIS REPORT European Organisation for the Safety of Air.
Overview of the interoperability Regulation
Overview of Continental En-route Navigation Specifications
Objective AOM 19 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR
The European Organisation for the Safety of Air Navigation dynamic Demand Capacity Balancing WP Marcel RICHARD Expert ATFCM Operational Specifications.
ICAO FPL 2012 Implementation Workshop Lisbon 16 th February 2012 Kim Breivik Chairman EUR 2012 Task Force Operational Requirements, Network Management.
CIVIL/MILITARY WORKSHOP FABCE ASM/ATFCM process Validation Plan Stjepan Varga Brussels,
Moving Towards an Integrated ASM/ATFCM/ATS Approach
ACG Workshop, 17 Feb 2004 – OATA project Concept of Operations (ConOps) ACG Workshop, 17 February 2004 Jose Varela and Ian Ramsay, SD/ESC.
1 Performance indicators, targets, steering Technical Interchange meeting Toulouse, May 2002 Xavier FRON Head Performance Review Unit.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
ZMQS ZMQS
Civil-Military coordination in France
31/03/2017 Moving towards an Integrated ASM/ATFCM/ATS Approach Brussels – September 2012 Cooperation in crisis and contingency situations Asli.
Break Time Remaining 10:00.
Moving towards an Integrated ASM/ATFCM/ATS Approach Brussels – September 2012 Network Management Operational Performance Enhancements Razvan BUCUROIU.
ABC Technology Project
The European Organisation for the Safety of Air Navigation Network Management functions Evolutions in SESAR WP7 and WP13 Moving Towards an Integrated ASM/ATFCM/ATS.
The European Organisation for the Safety of Air Navigation ASM Solutions at Network Level ASM / ATTFCM / ATS Workshop EUROCONTROL HQ September 2012.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Mission Trajectory Step 1 From planning to deployment.
Airspace Configurations Yevgen Pechenik EUROCONTROL DNMM/COO/NOM/OPL/PRO Civil-Military Workshop September 2012.
NM USER FORUM 2014 Razvan BUCUROIU Head of Operations Planning 30/01/2014 Free Route and Airspace Improvements.
Ensuring a 'Flexible Use of Airspace'….
The European Organisation for the Safety of Air Navigation The need for Data sharing Generic Civil-Military Cooperation.
The European Organisation for the Safety of Air Navigation Civil-Military Workshop Operational requirements for ASM systems Giuseppe Acampora EUROCONTROL.
The European Organisation for the Safety of Air Navigation MILO Military Liaison Officer in NMOC Civil-Military Cooperation 20 September 2012 Support function.
The European Organisation for the Safety of Air Navigation Civil-Military Workshop Harmonised Data Sharing Giuseppe Acampora EUROCONTROL DNM/COO/NOM/OPL/PRO.
NM USER FORUM 2014 Etienne De Muelenaere Network Strategy & Development 30 January 2014 NM 2014/2015 functional improvements.
ASM Dimension in Free Route Airspace Catalin Lepadatu EUROCONTROL DNM/COO/NOM/OPL Civil-Military Workshop September 2012.
Free Route Airspace in DK/SE FAB
We are learning how to read the 24 hour clock
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
Addition 1’s to 20.
25 seconds left…...
Januar MDMDFSSMDMDFSSS
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Clock will move after 1 minute
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
1 Ensuring a 'Flexible Use of Airspace'…. ICAO EANPG FUA Task Force Paris, May 2008 EUROCONTROL Airspace, Network Planning & Navigation Division.
Traffic Management and FUA integration
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Peter Matern Head of ADM Unit 30/01/2014
Ensuring a 'Flexible Use of Airspace'….
Presentation transcript:

The European Organisation for the Safety of Air Navigation Civil-Military Workshop Integration of ASM, ATFCM and ATC Giuseppe Acampora EUROCONTROL DNM/COO/NOM/OPL/PRO

ASM-ATFCM Work Plan Work Areas 7: Support to other ASM related activities Direction for Work Work Plan Work area 4 ASM in Free route environment Work area 2 Airspace Configuration and CDM Work area 1 ASM Solutions Work Areas 5 : ASM system support and Data Management Work Areas 6: ASM POST OPS & Performance Monitoring Work Area 0 Work plan Management Work area 3 Dynamic ASM/ATFCM process and ATC response

Work Plan – main drivers schedule ASM Solutions Time WA Network assessment process 2015 Network Ops Performance Indicators in the NM Ops Room Real time ASM data No flying window Concept in Belgium UL 619 UZ707, UZ706, Portsmouth areas FRA Integrated ASM/ATFCM process (units) at all levels ASM Position in NM Ops Room ADR phase IADR phase II Initial Airspace Configurations Operations Rolling Proc 3 System support CDM/ Enhanced Network Operation Service … ASM Post Ops Process and Performance Planning Network manual Flight efficiency Function Phase II Proc 3 case-by case deployment NOP Harmonise design principles Ad hoc areas EU restrictions … UM 150 ASM/ATF CM Process Modular areas B2B What if tollOptimiser tollASM toll Harmonise ASM process

Real Time data Improve system support Improve current achievement Network Impact Performance Harmonisation Work Plan - Priorities

Rolling UUP Procedure 3 Improve rolling UUP

UUP PUBLICATION D D-1D-OPS Winter time

UUP PUBLICATION D-OPS D-OPS Winter time 13.00

2011 ASM/ATFCM Process - Rolling process AMCs FMP AO Step 5 Draft AUP Time Axis (Summer) Step 6: Network impact assessment CFMU Step 8 AUP D-1D > 12.00>07.00 Step 11 FPLs 17.15>20.00 Step 4 Final CDR Request for D Step 9 ENV Update Step 9 EAUP Step 7: Coordination Airspace Users Step 3 Request fine- tuning (D) Step 3 Request fine-tuning (D) Step 4 Final airspace Request for D Step 5 React (CGH, CNL or new FPL) Step 2 Coordin. with AMC Step 1 Change area activatio n/deactiv ation Step 2 Coordin. Step 2 Coordin. with AMC Step 3 UUP 2/3 hours before Step 4 Rerouting Proposals to AOs 1 hour before EOBT 2/3 hours before events 18.00

Harmonisation AIP CDR cross border CDR at national level

Alignment of FL of Areas to Routes

Route Segment Usage - Timesheet

 above the lower limit or minimum en-route altitude and below FL290  Use VFR flight levels in accordance with ICAO Annex 2, Appendix 3, page 1 (e.g. FL035 or corresponding altitude,… FL285)  above FL290 and below FL410  Use number representing the layer/intermediate level between IFR flight levels ending on..5 (e.g. FL295 … FL405)  above FL410  Use number representing the layer/intermediate level between IFR flight levels ending on..0 (e.g. FL420 … FL500 … ) ASM Handbook – FL publication criteria

ASM Handbook – Time publication criteria  If H24 period  Put in column 6 e.g. CDR1 H24  If CDR1 conditions applies for a certain period of time  Put in column 6 e.g. CDR h-05.00h, together with what happens outside this time period, i.e. not available and/or all other possible combinations.  If weekly periods applies  Put in column 6 e.g. CDR1 MON-FRI 23.00h-05.00h and/or FRI 14.00h – MON 06.00h; CDR2 rest of the week and/or all other possible combinations.

UY170 Environment

UY /9

UL619 Environment

UL619 - AIP Publications CDR IDSTATEPOINTSTYPEW/EW/DFRIMONFLALT UL619EGCUTEL VALBO CDR1H CDR3H24 EKVALBO SUTEB CDR1YES DANKO -P850- GOLUM CDR EHSUTEB GOMKU CDR 1YES CDR EDGOMKU DHE CDR1YES CDR DHE LBE CDR1YES CDR

Network Manager 18 UQ343 GTQ_BEGAR CP EBBR_LIMC Real planning (Sunday 8 th April 2012) Delta: UP to NM

TSA 22 and associated CDRs- UQ343, UM164, UT3

CDR IDSTPOINTSTYPEW/EW/DFRMOFLALT UM164LFPOGOL LUPEN CDR CDR UQ343LFGTQ BEGAR CDR1YES YES UT3LFGTO BLMCDR1YES YES AIP Publication – (SUMMER TIME)

AUP analysis – UM164 May 2012 DATE CDR AVAILABILITY WEFUNTHOURS :3006: :0006: :0006: :0006: :0006: :0006: :0006: : : :0006: :0006: :0006: :0006: :0006: :0000:006 TOTAL 115

Traffic Analysis (30 May 2012) 1)UQ343: between > 28 potential flights, distance saving 879 NM 2)UT3: between UTC -> 5 flights potential, distance saving 116 NM 3)UM164: between UTC -> 5 flights potential, distance saving 218 NM

Objective Current capability Improvement required

GOALS

The European Organisation for the Safety of Air Navigation ASM/ATFCM Process – UM 150

Network Assessment ASM Contribution Notification New Opportunities

27 MILsAMCsCADFFMPs/FABsNOD DRAFT READY RELEASED MIL DRAFT INTENT DRAFT Validation Local/Regional Network AUP/UUP AMC Cross Border CDM Levels Activity owner CDM owner Network Impact Assessment – Workflow CDM Network Assessmen t done here

Work Plan