ASAS TN 6-8 October 2003 GS applications in Kiruna A Swedish ADS-B validation site Göran Hasslar CNS/ATM Applications Systems Engineer.

Slides:



Advertisements
Similar presentations
Insertion of UAS into the Spanish Airspace: Lessons learned Pablo González Brussels, 14 September 2011.
Advertisements

Primary Radar in ATC ITU Radar Seminar Poul Erik Jørgensen DAS ATS HMI Manager 24. September 2005.
1 GENERAL DYNAMICS Decision Systems Michel G, Gelinas Oct. 13, 2003 ACP WGC6/WP28 General Dynamics Decision Systems and Iridium Communications The Satellite.
An Airline Perspective on the implementation of new systems SEMINAR ON THE IMPLEMENTATION OF DATALINK AND SATCOM COMMUNICATIONS Bangkok Thailand,
Aviation System Block Upgrades and NAV CANADA Planning 17 November 2012 Pre-AN-Conf/12 Workshop.
Jeffrey T. Williams Manager, RNAV & RNP Group Air Traffic Organization
VDL Mode 4 Supporting Air-Ground communications November 2003Seminar on the Implementation of Datalink and SATCOM Communications1 VDL Mode 4 Supporting.
Seminar on the Implementation of Datalink and SATCOM Communications
LSSIP Objective AOP04.1.
ASAS Thematic Network – Rome April 2003 Session 2-B Cost / Implications ASAS Impact on Ground Systems An Industry Viewpoint Thales ATM Peter.
The EMERALD RTD Plan and the ASAS Validation Framework R P (Bill) Booth 10 October 2002.
Federal Aviation Administration International Flight Inspection Symposium June 24, 2008 James H. Washington Vice President, Acquisition and Business Services.
- European CDM - To benefit from the animation settings contained within this presentation we suggest you view using the slide show option. To start the.
Using CNS/ATM to Dramatically Improve Gate-to-Gate Operations Captain Bob Hilb UPS Advanced Flight Systems October 8, 2007.
Airside Capacity Enhancement
PETAL A major step Towards Cooperative Air Traffic Services Patrice BEHIER Manager of the Air/ground Co operative ATS Programme Directorate Infrastructure,
© DLR, Institute of Flight Guidance ASAS Thematic Network 2 nd Workshop 6-8 October 2003 – Malmö Session 1 – ATSA Application Track Bernhard Czerlitzki.
Air Traffic Management
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
Nationaal Lucht- en Ruimtevaartlaboratorium National Aerospace Laboratory NLR AI Planning, Waiting for the Results? H.H. Hesselink R.R.
Mission Trajectory Step 1 From planning to deployment.
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS.
Operational applications enabled by ADS-B
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-85/PIA-3 Air Traffic Situational Awareness (ATSA) Workshop on preparations.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
Direction générale de l’Aviation civile direction de la Technique et de l’Innovation direction des services de la Navigation aérienne 21/06/2005 ADS-B.
Implementation of ADS-B in Australia ASAS-TN Workshop Malmo, October 2003 Implementation of ADS-B in Australia ASAS-TN Workshop Malmo, October 2003 Bob.
SESAR and ASAS Opportunity
Applications from packages I to III
The Next Generation Air Transportation System “The Near Term and Beyond” Presented by Charles Leader, Director Joint Planning and Development Office.
1st ASAS-Thematic Network 2 Workshop Malmoe 26th-28 th September 2005 “Implementation planning and future packages” Session Moderator: Giorgio MATRELLA.
EGOA Enhanced General aviation Operations By ADS-B EGOA Enhanced General aviation Operations by ADS-B.
Sense & Avoid for UAV Systems
EDEP as Tool for ADS-B Validation eDEP User Group, 9 June 2008 Leo van der Hoorn, CASCADE Programme.
Gate-to-Gate Project: Implementing Sequencing, Merging, and Spacing Captain Bob Hilb September 11, 2006.
12 Sept 2006 LFV Group The Swedish Air Navigation Service Provider1 UAVs in ATM a cooperative approach By Göran Lindqvist LFV Group.
AIR TRAFFIC CONTROL Presented by S.SUMESWAR PATRO Regd no:
CRISTAL ATSAW Project Sep 2007 ASAS TN Christelle Pianetti, DSNA Simona Canu-Chiesa, Airbus.
Clustering ASAS Applications ASAS-TN2 First Workshop, Malmö 26 to 28 September 2005 Fraser McGibbon BAE Systems.
ASAS-TN Second Workshop, 6-8 October 2003, MalmöSlide 1 Airborne Surveillance Applications included in ‘Package I’ Francis Casaux CARE/ASAS manager.
ASAS-TN Workshop Glasgow 11 September 2006 Alex Wandels CASCADE Programme Manager EUROCONTROL European Organisation for the Safety of Air Navigation CASCADE.
Emerging Issues for Air Navigation Service Providers Rudy Kellar Vice President, Operations NAV CANADA September 2007.
Direction de la Technique et de l’Innovation 23 Mars 2006 ASAS implementation the DSNA views ASAS TN 2 Worshop Session 4: Integrating ASAS in an evolving.
ASAS TN 2.5 workshop Roma, November November NUP II+ Arlanda Surface Trials Arlanda Airport 29 SEP 2007 JAN BENGTSSON.
- Session 4: Interoperation José M. Roca Air/Ground Cooperative ATS Programme Eurocontrol.
Direction générale de l’Aviation civile centre d’Études de la navigation aérienne First ASAS thematic network workshop The user’s expectations and concerns.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
MFF is a EC co-funded programme Rome, 3-5 Aprili 2006 ASAS-TN2 Rome, 3-5 April 2006 Maurizio Zacchei, ENAV (MFF PM) Mediterranean Free Flight Programme.
What Is Multilateration Triangulation System Uses Aircraft Transponder Multiple Ground Receivers Central Computer Calculates & Displays Aircraft Position.
The CASCADE Programme Validation Results ASAS TN2 27 September 2005 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL European Organisation.
Airbus Status on ADS-B In / Out Update
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities” Pieter van der.
CARE/ASAS Activity 2 Follow-up: Validation Framework Dissemination Forum Isdefe Ingeniería de Sistemas CARE/ASAS ACTIVITY 2 FOLLOW-UP: VALIDATION.
Christos Rekkas ADS Programme Manager EUROCONTROL
1 Airborne Separation Assistance Systems (ASAS) - Summary of simulations Joint ASAS-TN2/IATA/AEA workshop NLR, Amsterdam, 8 th October 2007 Chris Shaw.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
Certification Considerations for the Implementation of ASAS Applications on Aircraft Kevin Hallworth: UK CAA ASAS-TN Seminar – October 2004.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
The CASCADE Programme Blueprint for ADS-B Deployment ASAS-TN2 Workshop – Amsterdam April 2007 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL.
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
Larry Ley | Digital Aviation | Boeing Commercial Airplanes
Aviation System Block Upgrades and NAV CANADA Planning
Workshop on preparations for ANConf/12 − ASBU methodology
Chris Shaw, EUROCONTROL Experimental Centre
Chris Shaw, EUROCONTROL Experimental Centre
Ground System implication for ASAS implementation
Workshop on preparations for ANConf/12 − ASBU methodology
ICAO AMCP WG-M/1 meeting, December 2000
FAA and JPDO ASAS Activities
USER’S EXPECTATIONS AND CONCERNS Aena’s ADS Programme Manager
Presentation transcript:

ASAS TN 6-8 October 2003 GS applications in Kiruna A Swedish ADS-B validation site Göran Hasslar CNS/ATM Applications Systems Engineer

Göran Hasslar / SCAA2 Kiruna specifications  Kiruna is the most Northern Airport in Sweden  No radar coverage in TMA below FL 80  Airlines require improved SUR service  10 schedule movements per day  Some charter  Limited GA and military traffic  Aircraft winter testing  Experimental activities; UAV, Esrange  Frequently complicated weather situations

Göran Hasslar / SCAA3 System  Transceivers currently installed in one helicopter and one aircraft, but no CDTI  One Ground Station installed  ADS-B ground network –Easy data transfer between different locations Kiruna-Luleå or Kiruna-Sturup  ADS-B/ Radar display. One for air and one ground display

Göran Hasslar / SCAA4 Applications to be used  ATC surveillance in non- radar areas (ADS-B-NRA) –Radar and ADS-B mix in the southern part of Kiruna TMA.  Airport surface surveillance (ADS-B-APT) –Mix of equipped and non-equipped –Low flying helicopters  Controller – ”Now we can see what we earlier only heard.”

Göran Hasslar / SCAA5 Operational changes  Procedures –Basic radar-like procedures. Overlay of radar procedures to GPS procedures. –No change in separation minima to in near future, but later on after more tests and built up confidence –Some new procedures for seamless flight is foreseen, but no revolutionary or extensive ones  Phraseology –Some new minor for example ”Radar contact” will be changed to ”ADS-B contact”  CDM enabler for AOC or other users on the ground

Göran Hasslar / SCAA6 Operational changes  New routings to be used depending of ADS-B equipped or not. Procedural/non-procedural traffic RWY 03RWY 21 Example by Robin Garrity at Qinetiq

Göran Hasslar / SCAA7 Validation snapshot  Validation aims and objectives identified; foreseen is a more safe (i.e surveillance in bad weather conditions and better SAR) and efficient ATM  Continue with the live tests during next year – some already performed to test quality of ADS-B (with and without DGNSS)  Controllers and pilots highly involved – this is not (only) best engineering guesses

Göran Hasslar / SCAA8 Future validation possibilities  Test trails with more traffic – planned installation of transceivers in 10 to 15 GA  Other AS and GS application with the addition of CDTI. Next step could be ATSAW and then Spacing and so on.  Eurocontrol NRA validation activities might be performed in Kiruna during end 2003 and  Introduce other services such as FIS-B and validate more aspects of the implemented system

Göran Hasslar / SCAA9 Safety snapshot  Application was handed over to Swedish Aviation Safety Authority for Entry control  Safetycase for all system parts  Safetycase for the surveillance application is maturing  Into operation Q  Helicopter pilot – ”It feels safe to be seen by ATC”

Göran Hasslar / SCAA10 Biggest safety issues  Complicated safety case for the whole chain – including the transceivers. How to make sure that no “low-quality” transceiver used by anyone in Kiruna TMA?  All new for the Safety Authority, no operational history for the system  Unforeseen issues pop-up  Data collection to convince yourself and others

Göran Hasslar / SCAA11 Other validation projects  ITS Arlanda – 2005 –Validate separation algorithms and application benefits –simulation  Ground Arlanda – 2005 –Validate ADS-B as part of A-SMGCS –Live tests with ADS-B and TIS-B  Enhanced General Aviation Operation Application –EGOA –2005 –40-50 GA, sail, balloons and other equipped with transponder and small pocket CDTIs. –Live tests with ADS-B (both to ATC and pilots) and FIS-B –Three airports with ground station and RDP with ADS-B

Göran Hasslar / SCAA12 Next steps  ADS-B In Arlanda SMGCS for operational use , including CDM project Bus coordination,  Use of ARTAS tracker developments with ADS-B  Upgrade RDPs, S2K and I-ACS with ADS-B capability  Introduce other services in the system e.g FIS-B, TIS-B  Transparent use of ADS-B data in all ATC and airport related processes including SAR  ADS-B exchange with neighbouring states and stakeholders (CDM)  Installing ADS-B ground stations at all major SCAA airports

Göran Hasslar / SCAA13 Motive round-up  Safety, enhanced SAR and enabler for ATSAW  Airport surface operations must be improved in all weather conditions  ADS-B can at a low cost be used at all airports and integrated in various local systems  ADS-B infrastructure can be installed at 5-10% of the cost for a new Mode-S/SSR infrastructure  ASAS applications are suitable for Swedish Airspace and can improve the capacity without large infrastructure investments(new runways)

Göran Hasslar / SCAA14 Welcome to the future, it is now and it is here, Sweden. Thank You!