3rd Plenary MeetingRA-2/MWR Cross-Cal & Val Team, ESRIN 12/09/01 Third Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting Jérôme.

Slides:



Advertisements
Similar presentations
ESA Data Integration Application Open Grid Services for Earth Observation Luigi Fusco, Pedro Gonçalves.
Advertisements

GEOSS Workshop 20 September 2013 ESRIN P. Bargellini, Ground Segment and Mission Operations Department, Earth Observation Programmes Directorate, European.
1 GlobModel The GlobModel study, initial findings and objectives of the day Zofia Stott 13 September 2007.
1 Glenn Research Center ICAO ACP Working Group M Iridium Sub Group Overview Bob Kerczewski Mike Meza NASA Glenn Research Center Iridium AGC-FG and NexSAT-SG.
SWOT and User Needs Workshop, DLR Oberpfaffenhofen, 5-6 July 2006 HYRESSA - HYperspectral REmote Sensing in Europe specific Support Actions Hyperspectral.
ENVISAT RA-2/MWR CCVT Plenary Meeting – 25-27/03/2003 ERS-2 RA/MWR status Pierre Féménias ESA/ESRIN.
RA-2 & MWR CCVT – ESA/ESRIN – 25 to 27 March, 2003 MWR Calibration & Validation status MWR Cal/Val team: Ngan Tran, Estelle Obligis, Laurence Eymard, Michel.
RA-2 S-BAND ANOMALY: DETECTION AND WAVEFORMS RECONSTRUCTION A. MARTINI (1), P. FEMENIAS RA-2 S-BAND ANOMALY: DETECTION AND WAVEFORMS RECONSTRUCTION A.
6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/031 Sixth Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM.
6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 Sixth Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting.
1 SMOS IOCP Key-Point 0 09 Dec ESAC SMOS Commissioning activities In Orbit Commissioning Activities : System Reviews F.Bermudo / CNES.
RA-2/MWR CCVT Plenary Meeting 12/Sep/ Data Circulation Presentation Overview Rehearsal summary RA-2/MWR data circulation during commissioning phase.
05/Dec/20018th Envisat Plenary Meeting1 RA-2/MWR CCVT readiness status RA-2/MWR CCVT Rehearsal requirements: –It is recommended that the rehearsal focus.
8th EnviSat Calibration and Validation Progress Meeting ESRIN, 05/12/01 1 RA-2/MWR Level 2 algorithms verification and products validation group status.
1 ESA’s MSG program: status Eva Oriol-Pibernat ESA/ESRIN Frascati ITALY RAL August 2003 RAL August 2003.
“SAMOSA” an ESA SAR Altimetry Ocean, Coastal Zones and Inland Water Development Study Jérôme Benveniste ESA Jérôme Benveniste ESA Presented at the Coastal.
DOSTAG Meeting #51, 3 rd May 2007 Access to ESA Earth Observation data (past and current missions)
Action Status Update Stephen Ward SIT-30 Agenda Item #2 30 th CEOS SIT Meeting CNES Headquarters, Paris, France 31 st March – 1 st April 2015 Committee.
“COASTALT” an ESA Ocean Coastal Zone Product Development study Jérôme Benveniste (ESA) and the COASTALT Team Presented at the Coastal Altimetry Workshop.
DORIS - DAYS Toulouse May 2-3, 2000 DORIS Doppler Orbitography and Radiopositioning Integrated by Satellite  Basic system concept  Main missions  Schedules.
CNES program status CNES program status E. Thouvenot, CNES March 2007.
Progress Meeting 4 4 th May 2011 ESA-ESRIN. 17/04/20092 Timeline Phase 1 –Formally approved Phase 2 –Started Jan 1 st –Progress Meeting 4 on May.
Agency, version?, Date 2012 Coordination Group for Meteorological Satellites - CGMS Add CGMS agency logo here (in the slide master) Coordination Group.
23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009 Status of the ESA Earth Observation Programmes Dr. Simonetta Cheli Head of Earth Observation.
OSTST, Hobart, March Future altimeter systems : is mesoscale observability guaranteed for operational oceanography? Future altimeter systems.
ENVISAT Validation Workshop - Frascati - 9–13 December 2002 Opening Session:  Welcome [G. Kohlhammer]  Workshop Objectives and Organisation [H. Laur]
A Global Observing System for Monitoring and Prediction of Sea Level Change Lee-Lueng Fu COSPAR, 2014, Moscow Jet Propulsion Laboratory California Institute.
Workshop Summary and Closure J. Benveniste Workshop Summary and Closure Jérôme Benveniste ESA-ESRIN Earth Observation Science and Application Department.
Sentinel-3 Validation Team (S3VT) Meeting ESA/ESRIN, Frascati, Italy, th November 2013 General Presentation Template for S3VT meeting Project name.
CEOS Strategy for Carbon Observations from Space – Report of Implementation Study Team Stephen Briggs ESA CEOS Plenary, Agenda Item 21 Tromsø, Norway
EOP Standard Presentation
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
Overview of CEOS Virtual Constellations Andrew Mitchell NASA CEOS SIT Team / WGISS NASA ESRIN – Frascati, Italy September 20, 2013 GEOSS Vision and Architecture.
The CEOS MIM Database & EO Handbook 2012 G Dyke & S Ward (ESA MIM team) I Petiteville (ESA) 26 th CEOS Plenary Bengaluru, Oct 2012.
Intercomparison of GlobVapour total column water vapour (TCWV) and Envisat RA2-MWR measurements (preliminary results) Bruno Picard (CLS), Jean-Rémi Deboer.
DORIS Days May 2-3, 2000 DORIS role in the next years P. Escudier CNES.
Task AR-07-03: Global Geodetic Reference Frames Report to ADC-4 prepared by Hans-Peter Plag (IAG/GGOS) Nevada Bureau of Mines and Geology and Seismological.
Committee on Earth Observation Satellites Plenary Agenda Item #3 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan 5 – 6 November 2015.
Committee on Earth Observation Satellites Albrecht von Bargen, DLR Plenary Agenda Item # th CEOS Plenary Kyoto International Conference Center Kyoto,
CEOS Plenary Tokyo, 6 November 2015 Volker Liebig, ESA Director of Earth Observation Programmes ESA’s Future Earth Observation Missions.
Jason-1/Envisat cross-calibration Y. Faugere (CLS) J. Dorandeu (CLS) N. Picot (CNES) P. Femenias (ESA) Jason-1 / Envisat Cross-calibration.
Sciavalig – 6-8/12/2004 Status of the Atmospheric Chemistry Instruments onboard Envisat SCIAVALIG 6–8 December 2004 Rob Koopman Angelika Dehn Lidia Saavedra.
September, 2008 TASK DA Data Quality Assurance Strategy GEO Task DA-06-02: “This task is led by CEOS and IEEE” GOAL: “Develop a GEO data quality.
1 ESA’s MSG program: status Eva Oriol-Pibernat ESA/ESRIN Frascati ITALY Boulder March 2004.
CNSA,, Date Nov Coordination Group for Meteorological Satellites - CGMS The Status of current and future CNSA Earth Observing System Presented.
WP120 External Calibration of Spaceborne Microwave Remote Sensing System Sensors Objective:Evaluation of external calibration needs for a variety of microwave.
The ESA call for the 9 th Earth Explorer mission (EE9)
2016 SIT Technical Workshop ESA SIT-31 Agenda Item # 15 CEOS Strategic Implementation Team ESA/ESRIN, Frascati, Italy 19 th -20 th April 2016 Committee.
MSG-2 launch preparations E. Oriol-Pibernat MSG Mission Manager GIST, IC, December 2005.
Financial System Upgrade Agency Change Champion Deployment Session March 16 th, 2006.
Instrument Landing Pages Challenges and Proposals.
CEOS Contributions to GEO
Data Stewardship Interest Group WGISS-43 Meeting
OGC Technical and Planning Committee Meeting Welcome
Data Stewardship Interest Group WGISS-43 Meeting
Copernicus Sentinels Space and Ground Segment Status
Background D/HSO Announcement of Opportunity (July 2011) in coordination with D/EOP soliciting scientific experiments for the International Space Station.
Rob Roebeling and Peter Miu
Space Agency Response to the GCOS IP
Albrecht von Bargen, Chair CEOS WGCV DLR Agenda Item # 6 GSICS-EP 17
Rob Roebeling, Viju John, Frank Ruethrich, Tim Hewison EUMETSAT
CEOS Missions, Instruments and Measurements Database
Overview of the AATSR Validation Programme
Land Imagery Data Architectures
Recent Activities of Ocean Surface Topography Virtual Constellation (OST-VC) Remko Scharroo (EUMETSAT)
Rob Roebeling and Peter Miu
SIT-31 Sessions CEOS SIT Chair Team ESA/ESRIN, Frascati, Italy
Recent activities of the OSVW-VC
Recent activities of the OSVW-VC
Atmospheric Composition Virtual Constellation (AC-VC)
Presentation transcript:

3rd Plenary MeetingRA-2/MWR Cross-Cal & Val Team, ESRIN 12/09/01 Third Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting Jérôme Benveniste ENVISAT RA-2/MWR Cross-Calibration and Validation Team Coordinator European Space Agency, Earth Observation Applications Department ESRIN, Via Galileo Galilei, I-00044, Frascati (RM), Italy, (

3rd Plenary MeetingRA-2/MWR Cross-Cal & Val Team, ESRIN 12/09/01 Objectives of the Meeting Review the minutes of last meeting –Review the actions Verify and freeze data requirements Review plan version 1.0 and freeze before end of year Assess readiness of the CCVTeam –Questions from Members? –Close open issues –plan for the ones still open

3rd Plenary MeetingRA-2/MWR Cross-Cal & Val Team, ESRIN 12/09/01 Agenda Introduction and Objectives of the Meeting (JB) Review of the minutes of the CCVT second plenary meeting, 14/12/2000 – closing of actions ENVISAT Mission Status (JB) ERS-2 RA/MWR Mission and Data (PF/AM) –ERS-2 Radar Altimeter Performance (AM) –ERS-2 MWR Health Status (PF/CETP) Data requirement, circulation and rehearsal (LR) MWR Calibration and Validation subgroup status (PF) Level 2 Products and Algorithms Verification subgroup status (MM) Review of the CCVT consolidated Plan (ALL) RA-2/MWR Products Handbook (JB) Readiness of each Member (ALL) Identification of remaining issues/actions (JB+ALL) Outlook, Schedule, date of the next meeting (JB) AOB

3rd Plenary MeetingRA-2/MWR Cross-Cal & Val Team, ESRIN 12/09/01 CCVTeam Actions ACTION 7.1: B.Chapron to submit Data requirement). ACTION 7.2: ALL to endorse the statements on the required consistencies of corrections ACTION 7.3: Every CCVT member using OPR and WAP to send to JB the standard recipe actually applied to the product ACTION 7.4: JB to produce a specification for "standard" OPR and WAP data ACTION 7.5: PC, BC, JB (+ALL) further develop the error formalism ACTION 7.6: ALL to endorse (or discuss) Accuracy Objectives ACTION 7.7: ALL to Sign a Statement of Work

3rd Plenary MeetingRA-2/MWR Cross-Cal & Val Team, ESRIN 12/09/01 RA-2/MWR Product Tree

3rd Plenary MeetingRA-2/MWR Cross-Cal & Val Team, ESRIN 12/09/01 ENVISAT Mission Status –Satellite in storage at Kourou »Ready for Launch Campaign –Ground Segment Reviews this month »Delta GS Readiness Review –Nominal Launch date is 01/12/2001 »Envisat is next passenger on Ariane 5 –Next key date is end September - Arianespace publish test results

3rd Plenary MeetingRA-2/MWR Cross-Cal & Val Team, ESRIN 12/09/01 Schedule ---- use page 90 of PLAN v1.0

3rd Plenary MeetingRA-2/MWR Cross-Cal & Val Team, ESRIN 12/09/01 Conclusion Review of Actions Data requirements frozen Next steps: –Review version 1.0 of the Plan –Establish and sign Statement of Work Schedule Meetings –Date and place of the next meeting »After Launch (L+2m and/or L+3m)