6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 Sixth Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

August July 2010 Annual Academic Calendar Colegio Los Robles.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
Slide ITRS Spring Meeting Sponsored by Infineon Technologies Philips Semiconductors STMicroelectronics.
NANPA Oversight Working Group Status Report to the NANC April 17, 2001 Chair Pat Caldwell.
and 6.855J Cycle Canceling Algorithm. 2 A minimum cost flow problem , $4 20, $1 20, $2 25, $2 25, $5 20, $6 30, $
Launching OPEN DAYS December 2006 Scotland House.
FREEDOM DRIVE 2013 The Future of Independent Living, Active Citizenship and Europe – 12 September 2013.
FAA/Eurocontrol Technical Interchange Meeting on Performance Metrics
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
1 Lisa Alexander and Helen Dennis April 16, 2008 Data Updates/Data Review Form District Test Coordinator Meeting.
February, 2010 LEA Support Advisory Council. Agenda 2:30-3:00Discuss plan revision process (feedback and support) 3:00-3:30Discuss February workshops.
0 - 0.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
School Shop. Welcome to my shop. You have 10p How much change will you get? 7p 3p change.
ZMQS ZMQS
Compiled by John McFarlane 13 th June th June Slides Duration 5:30 minutes Version V.01.
First European Workshop on Ataxia-Telangiectasia Clinical Science for A-T: Status Quo and Future Directions Dear Colleagues, we have the pleasure to invite.
Richmond House, Liverpool (1) 26 th January 2004.
Break Time Remaining 10:00.
Welcome to the International Training Centre of the ILO in Turin in Turin Welcome to the International Training Centre of the ILO in Turin in Turin.
Leading Change. Leading Learning. Transforming Our District for Student Success. Finals Schedule H ALF D AYS.
CBP BMP Verification Program Development: Requests for Decisions on Panel Membership and Revised Schedule CBP Partnership Management Board September 13,
© S Haughton more than 3?
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Workshop Objectives and Organisation J. Benveniste Workshop Final Schedule Jérôme Benveniste ESA-ESRIN Earth Observation Science and Application Department.
RA-2 & MWR CCVT – ESA/ESRIN – 25 to 27 March, 2003 MWR Calibration & Validation status MWR Cal/Val team: Ngan Tran, Estelle Obligis, Laurence Eymard, Michel.
3rd Plenary MeetingRA-2/MWR Cross-Cal & Val Team, ESRIN 12/09/01 Third Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting Jérôme.
8th EnviSat Calibration and Validation Progress Meeting ESRIN, 05/12/01 1 RA-2/MWR Level 2 algorithms verification and products validation group status.
We are learning how to read the 24 hour clock
1..
© 2012 National Heart Foundation of Australia. Slide 2.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Submission doc.: IEEE 802-EC-13/0033r0 July 2013 Jon Rosdahl, CSRSlide 1 ExSec Agenda Items July 2013 Plenary Date: Authors:
Addition 1’s to 20.
Resident Assistant Recruitment and Selection Process (Presentation Pt 2)
Skills Community Development & Relationship Building Communication Problem Solving Planning/Administrative Teamwork Dedication to Learning.
25 seconds left…...
Mail-merge and Contact Log Shaun Elliott – Business Consultant Enhance your knowledge, improve your organisation.
Test B, 100 Subtraction Facts
Januar MDMDFSSMDMDFSSS
Week 1.
Frequently Asked Questions June New Student Orientation.
We will resume in: 25 Minutes.
Conference Program 09:00 Welcome 09:30 Session 1: Optics and Photonics 10:45 Coffee Break (Poster Session) 11:15 Session 2: Gravitation, Cosmology and.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
PSSA Preparation.
Weekly Attendance by Class w/e 6 th September 2013.
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Some info … Frascati & ESRIN How to find your way within ESRIN Network Some other info Schedule Social events.
Logistics ESA SIT-31 Agenda Item # 1 CEOS Strategic Implementation Team ESA/ESRIN, Frascati, Italy 19 th -20 th April 2016 Committee on Earth Observation.
Technology for Long-Term Digital Preservation
Logistics ESA CEOS WGISS#42 meeting ESA/ESRIN, Frascati, Italy
Presentation transcript:

6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 Sixth Plenary ENVISAT RADAR ALTIMETRY CROSS-CALIBRATION and VALIDATION TEAM Meeting (#17) Jérôme Benveniste ENVISAT RA-2/MWR Cross-Calibration and Validation Team Coordinator European Space Agency, Earth Observation Applications Department ESRIN, Via Galileo Galilei, I-00044, Frascati (RM), Italy, (

6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 Before recalling the objectives of the meeting, a few important matters that need immediate dealing with…. Welcome to ESRIN !

6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 Participants to tonight’s dinner please sign up! How many of us have a car? Do you want to go to the same one than last time?

6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 You are invited to a welcome cocktail at 17h30 in the Canteen

6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 Meeting Logistics Coffee breaks at 10:30 and 15:30 Lunch break at 13:00 On the floor below: –Self service canteen –Travel office »Taxi reservation forms to fill out (leave 2 hours before take-off) –Bank, ATM A complimentary shuttle leaves the Frascati Piazza Roma (newspaper stand) at 8:05 and 8:20 and back at 17:15 and 18:15

6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 Objectives of the Meeting Present results obtained on nearly three cycles of GDRs and two cycles of SGDRs Discuss cross-calibration results and validation status Make recommendations for future evolutions Prepare for publication at EGS-AGU-EUG & IGARSS Prepare for Final Report

6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 L=1 March 2002, SO=12 March 2002 (L+1m) First data report (on S-O day 12/03) (L+2m) Preliminary report from Esrin in house verif (10 may) (L+2m) CCVT splinter meeting on products and algorithm verification (L+3m) Data release to CCVTeam (15 June) (L+4m) Interim Report (prod val, l2 verif, prel x-cal) (L+6m) End comm ph Cross-cal and Val full report (L+6m) RA-2/MWR CCVT plenary meeting (9-10 Sept) (L+6m) Calibration review (10-13 Sept) (L+9m) Validation Workshop (report+ presentation) (10-13/ Dec) (L+10m) Final RA-2/MWR CCVT meeting (9-10/12 or 14-15/01/03) (L+12m) Final report on Cross-cal (L+12m) end of RA-2/MWR CCVT project Original Schedule 15 August for FDMAR 9 November for GDR etc. Preliminary product validation skipped Extended schedule… Jan-Feb-Mar/03 Processing of 3 cycles

6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 (L+9m) Validation Workshop (report+ presentation) (10-13/ Dec) (L+10m) Acquisition and processing of three cycles until 17 Jan 03 (L+13m) Sixth RA-2/MWR CCVT meeting (25-27 March 03) (L+14m) EGS/AGU/EUG Special session Geodesy-13 “Impact of new and planned mission”, Nice (F) (7-11 April 03) (L+15 m) Final report on Cross-calibration and Validation (May 03) (L+15m) end of RA-2/MWR CCVT project (end May 03) IGARSS Special Session, Toulouse (F) (July 03) Extended Schedule

6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 Agenda

6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 ENVISAT MISSION STATUS By Henri Laur, ENVISAT Mission Manager

6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 Data Availability Presented by Nicolas Picot, CNES (F-PAC)

6th Plenary Meeting (#17)RA-2/MWR Cross-Cal & Val Team, ESRIN 25-27/03/03 Agenda