Page 1 ENVISAT Calibration Review, ESTEC 9-13 Sept 2002, DORIS & ORBIT, Berthyl Duesmann.

Slides:



Advertisements
Similar presentations
Well-Seismic Ties Lecture 7 Depth Time Synthetic Trace SLIDE 1
Advertisements

1 Why ETSI is the place to bridge EU and LA initiatives on e-administration Francisco Da Silva Chairman of the Kick Off Meeting Sophia Antipolis,
One Sky for Europe EUROCONTROL © 2002 European Organisation for the Safety of Air Navigation (EUROCONTROL) Page 1 FAA/Eurocontrol Technical Interchange.
August 27 AP physics.
Venice 2006 OSTST 16-Mar-2006 GFO Mission & Status #1 Ocean Surface Topography Science Team Meeting Venice, Italy: March , 2006 John Lillibridge.
OVERVIEW OF THE IMPROVEMENTS MADE ON THE EMPIRICAL DETERMINATION OF THE SEA STATE BIAS CORRECTION S. Labroue, P. Gaspar, J. Dorandeu, F. Mertz, N. Tran,
Page 1 ASAR Validatoin Review - ESRIN – 9-13 December 2002 Ocean geophysical results from ASAR  Geophysical overview  ocean spectra : the isidore case.
Page 1 ENVISAT Calibration Review, ESTEC, 9 September 2002 ENVISAT Calibration Review Objectives Prepared by: J. Louet.
RA-2 M. Roca 1, R. Francis 1, C. Zelli 2, S. Laxon 3, H. Jackson 1 and all the Absolute Calibration Team RA-2 Absolute Range and Sigma-0 Calibration &
Because I said so… Objective: To identify and use inductive and deductive reasoning.
Altimeter sea surface height bias calibration with in situ network G. Jan 1, P. Bonnefond 2, Y. Ménard 3, O. Laurain 2 1 NOVELTIS, Toulouse, France 2 OCA,
Chapter 1 Chemistry and You
UNIT 2: SOLVING EQUATIONS AND INEQUALITIES SOLVE EACH OF THE FOLLOWING EQUATIONS FOR y. # x + 5 y = x 5 y = 2 x y = 2 x y.
Special Shortcuts for and Triangles
Validation of SGP4 and IS-GPS-200D Against GPS Precise Ephemerides
Time Variable Gravity Implementation issues for Jason L. Cerri, S. Houry, J.P. Berthias Ocean Topography Science Team Meeting - Hobart, Australia – March.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
04/22/02EGS G STABILITY OF GLOBAL GEODETIC RESULTS Prof. Thomas Herring Room ;
POD/Geoid splinter March 14, 2007 J.P. Berthias Ocean Topography Science Team Meeting - Hobart, Australia – March 2007.
- 1- Quality of real time altimeter products OSTST, Hobart, March 2007 Quality of real time altimeter products impact of the delay G.Larnicol, G. Dibarboure,
POD/Geoid Splinter Summary OSTS Meeting, Hobart 2007.
MR P.Durkee 5/20/2015 MR3522Winter 1999 MR Remote Sensing of the Atmosphere and Ocean - Winter 1999 Active Microwave Radar.
ESOC Navigation Support Office ILRS Workshop 2008 Poznan, Poland ESOC IGS, IDS, ILRS (Re-) processing T. Springer, M. Otten, I. Romero, J. Dow.
TOR TanDEM-X 16th International Workshop on Laser Ranging, Poznan, October 2008 ILRS Support for TerraSAR-X and TanDEM-X - Status and Future Prospects.
Know the Earth…Show the Way NATIONAL GEOSPATIAL-INTELLIGENCE AGENCY Approved for Public Release NGA Case # NGA’s Role in GPS Barbara Wiley.
University of Colorado Boulder ASEN 5070: Statistical Orbit Determination I Fall 2014 Professor Brandon A. Jones Lecture 37: SNC Example and Solution Characterization.
DORIS - DAYS Toulouse May 2-3, 2000 DORIS Doppler Orbitography and Radiopositioning Integrated by Satellite  Basic system concept  Main missions  Schedules.
ESPACE Porto, June 2009 MODELLING OF EARTH’S RADIATION FOR GPS SATELLITE ORBITS Carlos Javier Rodriguez Solano Technische Universität München
ET- 3rd Indo-French Workshop on Megha-Tropiques, October ALTIKA / OCEANSAT3 ISRO / CNES mission Prepared by E. Thouvenot (CNES)
NGS GPS ORBIT DETERMINATION Positioning America for the Future NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION National Ocean Service National Geodetic.
Satellite Altimetry - possibilities and limitations
Ground Support Network operations for the GRAS Radio Occultation Mission R. Zandbergen, the GRAS GSN team (ESOC) and the Metop GRAS team (EUMETSAT) 09/09/2011.
Space Geodesy (1/3) Geodesy provides a foundation for all Earth observations Space geodesy is the use of precise measurements between space objects (e.g.,
IRI Workshop 2005 TEC Measurements with Dual-Frequency Space Techniques and Comparisons with IRI T. Hobiger, H. Schuh Advanced Geodesy, Institute of Geodesy.
Hommes Logiciels Matériels S A L P SALP, the CNES ground segment for altimetric missions With the successful launch of EnviSat and Jason-1 missions, the.
ESOC Navigation Support Office EGU Vienna, , 1/18 Ground support network for the Metop GRAS atmospheric sounding mission R.Zandbergen, A.Ballereau,
Philip Moore Jiasong Wang School of Civil Engineering and Geosciences University of Newcastle upon Tyne Newcastle upon Tyne NE1 7RU
OSTST Hobart 2007 – Performance assessment Jason-1 data M.Ablain, S.Philipps, J.Dorandeu, - CLS N.Picot - CNES Jason-1 GDR data Performance assessment.
SLR in the age of GPS Frank G. Lemoine, Scott B. Luthcke, Nikita P Zelensky Brian D. Beckley Code 697, Space Geodesy Laboratory NASA Goddard Space Flight.
GEOSAT Follow-On (GFO) Radar Altimeter Satellite
ESOC Navigation Support Office IGS Workshop 2008 Miami ESOC IGS Reprocessing T.A. Springer, F. Dilssner, E. Schoenemann, I. Romero, J. Tegedor, F. Pereira,
ALOS -Advanced Land Observing Satellite Using SLR, The GPS accuracy verification of ALOS JAXA Precise Orbit Determination Team S Nakamura, N Kudo, R Nakamura,
Geocenter Variations Derived from GRACE Data Z. Kang, B. Tapley, J. Chen, J. Ries, S. Bettadpur Joint International GSTM and SPP Symposium GFZ Potsdam,
IGS Workshop 2008, June 2-6, Miami Beach First activities of the IGS Antenna Working Group — Comparison of ground- and space-based satellite antenna maps.
Intercomparison of GlobVapour total column water vapour (TCWV) and Envisat RA2-MWR measurements (preliminary results) Bruno Picard (CLS), Jean-Rémi Deboer.
DORIS Days May 2-3, 2000 DORIS role in the next years P. Escudier CNES.
INSTRUMENT STATUS AND PERFORMANCE Guido Levrini. Page 2 ENVISAT Validation Workshop - ESRIN - 9–13 December 2002 ASAR F Instrument operability issues.
POD/Geoid splinter Wednesday March 14, 2007 Morning and Afternoon J.P. Berthias – J. Ries Ocean Topography Science Team Meeting - Hobart, Australia – March.
View on GPS and Galileo ‘From across the Atlantic…’ Ruth E. Neilan International GNSS Service (IGS) Central Bureau Jet Propulsion Laboratory/California.
C H A M P International Laser Ranging Service - General Assembly, October 2005 Eastbourne, UK L. Grunwaldt, R. Schmidt, D. König, R. König, F.-H. Massmann.
Towards the GEOSAT Follow-On Precise Orbit Determination Goals of High Accuracy and Near-Real-Time Processing Frank G. Lemoine Planetary Geodynamics Laboratory.
Value of Node Closest to HARVEST = 150 mm Value of Node Closest to SENETOSA = 117 mm Value of Node Closest to BURNIE = 154 mm SOUTH Mean = mm  =
Flygteknik, Oktober -10 FLIGHT RESULTS FROM PRISMA FORMATION FLYING AND RENDEZVOUS DEMONSTRATION MISSION Staffan PerssonSwedish Space Corporation Per BodinSwedish.
JASON2 Status in NOAA Gary Petti Office of Satellite Data Processing and Distribution.
Jason-1 POD reprocessing at CNES Current status and further developments L. Cerri, S. Houry, P. Perrachon, F. Mercier. J.P. Berthias with entries from.
JASON-1 MISSION STATUS S. Coutin-Faye CNES, Altimetry and Precise Positioning Office.
ESOC Navigation Support Office IGS Workshop 2008 Miami IGS Real Time Pilot Project: Analysis Centre Activities Loukis Agrotis 4 June 2008.
Formosat-3/COSMIC WorkshopNov 28 - Dec 1, 2006Taipei, Taiwan Estimates of the precision of LEO orbit determination and GPS radio occultations from the.
Revised 10/30/20061 Overview of GPS FORT 130 Forest Mapping Systems.
AXK/JPL SBAS Training at Stanford University, October 27-30, 2003 Satellite Based Augmentation Systems Brazilian Ionosphere Group Training at Stanford.
Younis H. Karim, AbidYahya School of Computer University Malaysia Perlis 1.
C. Shum, C. Zhao, Y. Yi, and P. Luk The Ohio State University GFO Calibration/Validation Meeting NOAA Laboratory for Satellite Altimetry Silver Spring,
Astronomical Institute University of Bern 1 Astronomical Institute, University of Bern, Switzerland * now at PosiTim, Germany 5th International GOCE User.
TRANSMISION LINE PROTECTION USING GPS PRESENTED BY:- KAJAL MOR M.TECH(PS)
CNES/CLS AC (GRG), IDS CC
DIODE On-Board Orbit Determination function, providing :
Section 1-2 Measurement.
Validation Activities for Jason-1 and TOPEX/Poseidon Precise Orbits
Characterization and Impact of DORIS scale variations
CNES-CLS Dynamical modelling of GPS orbits
Presentation transcript:

Page 1 ENVISAT Calibration Review, ESTEC 9-13 Sept 2002, DORIS & ORBIT, Berthyl Duesmann

Page 2 ENVISAT Calibration Review, ESTEC 9-13 Sept 2002, DORIS & ORBIT, Berthyl Duesmann F Main mission of DORIS, Doppler ORbitography Integrated by Satellite, is to provide to various users satellite Ephemerides F Integrated real-time 3D navigator on-board, one block time/position/velocity/quality every 10 seconds F DORIS Doppler data are processed off-line for precise orbits F Real-time time-tagging is done on-board on BCP2/4 pulses DORIS Mission

Page 3 ENVISAT Calibration Review, ESTEC 9-13 Sept 2002, DORIS & ORBIT, Berthyl Duesmann Instrument Performances F DORIS Doppler data residuals against MOE orbit are mm/s F Navigator accuracy is : u cm radial RMS u Less than 1 meter 3D RMS F Performances are better than specifications (10 m RMS per axis) F DORIS Datation Accuracy is OK (on BCP2 pulse following a BCP4), u accuracy better than 15 microseconds, comparison of navigator orbit with ground orbits (MOE, POE including laser data), one microsecond error means 7mm along-track

Page 4 ENVISAT Calibration Review, ESTEC 9-13 Sept 2002, DORIS & ORBIT, Berthyl Duesmann F Functioning and Performances of the DORIS instrument are fully nominal F Operations of DORIS are routine F DORIS Performances are better than specifications DORIS Conclusions

Page 5 ENVISAT Calibration Review, ESTEC 9-13 Sept 2002, DORIS & ORBIT, Berthyl Duesmann F Global Orbit Validation Team work results from: u contributions from the CNES POD team in charge of the operational Precise Orbit Determination for ENVISAT u contributions from the other experts groups in Europe and in the US, benefiting from a synergy with Jason-1 Global OVT work

Page 6 ENVISAT Calibration Review, ESTEC 9-13 Sept 2002, DORIS & ORBIT, Berthyl Duesmann F Mixed « DORIS + laser » POE have been generated for several orbital arcs: u Last 7-day arc of ENVISAT cycle 6 u All arcs of cycle 7 u First arc of cycle 8 F All available DORIS doppler data, all auxiliary information, and all orbit ephemeris made available to the OVT F Estimated POE accuracy is of the order of 3 to 4 cm for the radial component POE results from CNES POD team

Page 7 ENVISAT Calibration Review, ESTEC 9-13 Sept 2002, DORIS & ORBIT, Berthyl Duesmann F One example of worst case: the Mid-July orbit arc u RMS differences between DEOS and CNES orbits 7 cm in the radial direction 90 cm in the along-track direction u Explainations: combination of : * a sudden increase in solar activity, * gaps in the DORIS tracking, * and differences in SLR editing at DEOS and CNES F Example of Best case: Arc from July 12 to July 15 u Mean difference DEOS -CNES better than 0.5 cm in radial direction u RMS differences of the order of 1.5 to 2.5 cm u Very good 3D consistency at the level of 4.5 to 6.0 cm RMS Recent comparison figures from DEOS

Page 8 ENVISAT Calibration Review, ESTEC 9-13 Sept 2002, DORIS & ORBIT, Berthyl Duesmann F Present figures that may be agreed: u MOE: radial: better than 5 cm u « not tuned » POE: radial: better than 3 to 4 cm u Very good agreement with DEOS, GFZ and ESOC OVT overall conclusion