Free Route Airspace in DK/SE FAB

Slides:



Advertisements
Similar presentations
Air Traffic Management
Advertisements

A PERFORMANCE BASED GLOBAL AIR NAVIGATION SYSTEM: PART II
1 Air-Ground Integration Ed Bailey, Airborne Project Leader & Ian Wilson, PATs Project Leader.
The European Organisation for the Safety of Air Navigation dynamic Demand Capacity Balancing WP Marcel RICHARD Expert ATFCM Operational Specifications.
CIVIL/MILITARY WORKSHOP FABCE ASM/ATFCM process Validation Plan Stjepan Varga Brussels,
Moving Towards an Integrated ASM/ATFCM/ATS Approach
FAA / Eurocontrol TFM/CDM Technical Interchange Meeting
Page 1 CARE/ASAS Activity 3: ASM workshop Brétigny, 19 December 2001 Autonomous Aircraft OSED CARE-ASAS Activity 3: ASM Autonomous Aircraft OSED.
Civil-Military coordination in France
Airspace Volumes and Sectorisation Good Design Practice Airspace Volumes and Sectorisation Good Design Practice 1.
Presented by United Arab Emirates MID ATM ENHANCEMENT PROGRAM (MAEP) TECHNICAL PROPOSAL.
31/03/2017 Moving towards an Integrated ASM/ATFCM/ATS Approach Brussels – September 2012 Cooperation in crisis and contingency situations Asli.
- European CDM - To benefit from the animation settings contained within this presentation we suggest you view using the slide show option. To start the.
Moving towards an Integrated ASM/ATFCM/ATS Approach Brussels – September 2012 Network Management Operational Performance Enhancements Razvan BUCUROIU.
The European Organisation for the Safety of Air Navigation Network Management functions Evolutions in SESAR WP7 and WP13 Moving Towards an Integrated ASM/ATFCM/ATS.
The European Organisation for the Safety of Air Navigation ASM Solutions at Network Level ASM / ATTFCM / ATS Workshop EUROCONTROL HQ September 2012.
1 FAB CE Feasibility Study Operations FAB CE Stakeholders Workshop March 5 th 2008, Prague.
Mission Trajectory Step 1 From planning to deployment.
Airspace Configurations Yevgen Pechenik EUROCONTROL DNMM/COO/NOM/OPL/PRO Civil-Military Workshop September 2012.
Civil Military Cooperation in ATM
25 August 2014Page 1 Civil Military Cooperation in Enhancing operations Asia and Pacific Regional Sub-Office 2014 BEIJING, CHINA; 30 JUN-11 JUL 2014.
NM USER FORUM 2014 Razvan BUCUROIU Head of Operations Planning 30/01/2014 Free Route and Airspace Improvements.
Ensuring a 'Flexible Use of Airspace'…. Patrick Delmouzée Head of ATM Unit DSS/CM EUROCONTROL Moving towards an Integrated ASM/ATFCM/ATS Approach EUROCONTROL.
Ensuring a 'Flexible Use of Airspace'….
The European Organisation for the Safety of Air Navigation Civil-Military Workshop Operational requirements for ASM systems Giuseppe Acampora EUROCONTROL.
The European Organisation for the Safety of Air Navigation MILO Military Liaison Officer in NMOC Civil-Military Cooperation 20 September 2012 Support function.
The European Organisation for the Safety of Air Navigation Civil-Military Workshop Harmonised Data Sharing Giuseppe Acampora EUROCONTROL DNM/COO/NOM/OPL/PRO.
NM USER FORUM 2014 Etienne De Muelenaere Network Strategy & Development 30 January 2014 NM 2014/2015 functional improvements.
The European Organisation for the Safety of Air Navigation Civil-Military Workshop Integration of ASM, ATFCM and ATC Giuseppe Acampora EUROCONTROL DNM/COO/NOM/OPL/PRO.
ASM Dimension in Free Route Airspace Catalin Lepadatu EUROCONTROL DNM/COO/NOM/OPL Civil-Military Workshop September 2012.
NM USER FORUM 2014 Philippe Waroquiers NM Head of NeOs Team Flight Efficiency Opportunity generation A use case for the GRRT tool.
1 Ensuring a 'Flexible Use of Airspace'…. ICAO EANPG FUA Task Force Paris, May 2008 EUROCONTROL Airspace, Network Planning & Navigation Division.
Traffic Management and FUA integration
Peter Matern Head of ADM Unit 30/01/2014
Continuous Climb Operations (CCO) Saulo Da Silva
The Swedish system. Swedish passengers no longer trust the railway.
CURRENT AIRSPACE MANGEMENT PROCEDURES AND LARA IMPLEMENTATION Traineeship report 15 October 2010.
EUROCONTROL - One Single CIV-MIL Sky EUROCONTROL ‘One Sky for Europe’ EUROCONTROL 1 IANS ASM Course April 2004 IANS ASM Course April 2004.
Review Continuous Descent Operations Manual Roosevelt Pena (Dom Rep)
Leading Cadet Training
ASAS FRA OB/T ATM Projects Lufthansa point of view.
Flexible Use of Airspace and Collaborative Decision Making The aim of this presentation is to provide the aviation industry with the understanding of the.
Objective ATC 02.2 ESSIP Plan 2013 Ingrid FEIJT DSS/EIPR
Airspace 1 st LT Zouhar Jakub 12 th September 2014.
ATS capacity and efficiency improvements by HungaroControl Air Navigation Service Provider Vilmos SOMOSI FAB Coordinator, ATM expert INAIR2015 Amsterdam.
Workshop on preparations for ANConf/12 − ASBU methodology
Допълнение 7 на PANS-ATM (ICAO Doc 4444)
Airspace.
CLVV Briefing Useldanges Glider Sectors
AIRSPACE CONCEPT WORKSHOP CASE STUDY
Workshop on preparations for ANConf/12 − ASBU methodology
Presented by United Arab Emirates
Workshop on preparations for ANConf/12 − ASBU methodology
Continuous Climb Operations (CCO) Saulo Da Silva
AIR TRAFFIC CONTROL SERVICE
Ensuring a 'Flexible Use of Airspace'….
ATFM IMPLEMENATION IN INDIA – FUTURE PLANS
Continuous Climb Operations (CCO) Saulo Da Silva
FUA Restrictions Flight Plan Buffer Zones
ATM WAC Inter-FAB Panel
RAD evolutions workshop 2018
RAD in DFS – information for external stakeholders
SAS & RAD Jens Albek Operative Route Analyst
Cockpit participation in
Traffic Management and FUA integration
AIRSPACE CONCEPT WORKSHOP CASE STUDY
RAD Evolution Workshop Outcome
Airspace Volumes and Sectorisation Good Design Practice
by Ranko Vuica and Željko Savić Croatia Control Ltd.
ROMATSA – SAFETY, EFFICIENCY AND ENVIRONMENTAL PERFORMANCE IN ATM
Presentation transcript:

Free Route Airspace in DK/SE FAB 3 May 2008 ASM in Free Route Airspace in DK/SE FAB Free Route Airspace in DK/SE FAB ASM, ATC & ATFCM Berit Abildgaard/Pontus Bengtsson NUAC

FRA fully implemented in DK/SE FAB 3 May 2008 ASM in Free Route Airspace in DK/SE FAB FRA fully implemented in DK/SE FAB Fully implemented Nov 2011 Danish FIR & Swedish UIR >FL285

ASM in Free Route Airspace in DK/SE FAB 3 May 2008 ASM in Free Route Airspace in DK/SE FAB ASM/ATC Denmark Flexible Airspace Structures and Procedures: Available tools: CDR1/CDR2/CDR3 & TSA/TRA/R-/D-areas AMC manageable: CDR1/CDR2 & TSA/R-/D-areas Level 3 tactical ASM/ATC: TRA & CDR3

ASM in Free Route Airspace in DK/SE FAB 3 May 2008 ASM in Free Route Airspace in DK/SE FAB ASM Denmark AMC manageable: D-1 pre-planning with regard to available airspace are done according to the FUA concept. Closure of TSAs are managed via CIAM. The system generates a “REJ” to flightplans penetrating the TSA on a FRA flightpath or via a closed CDR. “Associated areas” are published around the TSAs generating a buffer of ~3,5 NM as well as “Anchor points” which makes it possible to flightplan FRA around TSAs. Day of Operation: In activated TSAs OAT operations have priority and GAT cannot penetrate. UUPs can be generated via CIAM in case of cancellation of booking for the afternoon sorties by AMC.

ASM in Free Route Airspace in DK/SE FAB 3 May 2008 ASM in Free Route Airspace in DK/SE FAB ASM/ATC Denmark Level 3 tactical ASM/ATC: Day of Operation: TRAs can be activated by the Fighter Allocator with 15 minutes pre-notification. When TRAs are activated GAT can be coordinated through by restricting OAT operations in levels or areas.

ASM in Free Route Airspace in DK/SE FAB 3 May 2008 ASM in Free Route Airspace in DK/SE FAB ASM Denmark

ASM in Free Route Airspace in DK/SE FAB 3 May 2008 ASM in Free Route Airspace in DK/SE FAB ASM/ATC Sweden Flexible Airspace Structures and Procedures: Available tools: CDR1/CDR2 & TRA/PCA AMC manageable: CDR2 Level 3 tactical ASM/ATC: PCA & CDR1 R-/D-areas are published H24 and activated at Level 3. ”When a clearence has been obtained for a flight along a route penetrating a restricted area within controlled airspace, special permission to cross this area is not required.” ENR 1.3-6

ASM in Free Route Airspace in DK/SE FAB 3 May 2008 ASM in Free Route Airspace in DK/SE FAB ASM Sweden AMC manageable: D-1 pre-planning with regard to available airspace are done according to the FUA concept. Closure of CDR2s are managed via CIAM. The system generates a “REJ” to flightplans via a closed CDR. No major traffic flows are on CDR2s. Traffic on a FRA flight-path will be handled tactically with a maximum re-route of 20 NM. AMC is informed about planned activity in TRAs but it does not affect availability to CDR2. Sweden together with Finland are conducting dry-runs with the aim of establishing procedures for activation of EU CBA 10 Lapland and EU CBA 11 Bothnia. These CBAs/TRAs will be managed by AMC Finland as lead AMC. UUPs can be generated via CIAM in case of cancellation of booking for the afternoon sorties by AMC.

ASM in Free Route Airspace in DK/SE FAB 3 May 2008 ASM in Free Route Airspace in DK/SE FAB ASM/ATC Sweden Level 3 tactical ASM/ATC: Day of Operation: 30 min prior to activation of a PCA/TRA ATCC is informed about the request. This information is put into the ATC system and made available to the controllers. This 30 min pre-notification enables ATC to “clean up the airspace”. Priority Rules: In an activated PCA/TRA Mil has priority except for traffic on available ATS-routes/CDRs that penetrates the area (in FRA environment along an available ATS-route). These flights are up to coordination how to fly through the area. Agreed maximum of 20 NM in total – will not exceed what is available via ATS route/CDR.

ASM in Free Route Airspace in DK/SE FAB 3 May 2008 ASM in Free Route Airspace in DK/SE FAB ASM/ATC Sweden The entire Swedish FIR/UIR is covered with PCA/TRA with the exception Stockholm, Göteborg and Malmö TMA These areas are normally available all levels with two limitations: ATS Routes between Sthlm – Gbg - Malmö TMA and Sthlm – Oslo TMA Strategic agreement with Air force normally avoids certain areas during peak hours

ASM in Free Route Airspace in DK/SE FAB 3 May 2008 ASM in Free Route Airspace in DK/SE FAB ASM/ATC Sweden Permanent ATS route CDR2 CDR1 Published route extension

ASM in Free Route Airspace in DK/SE FAB 3 May 2008 ASM in Free Route Airspace in DK/SE FAB ATFCM Denmark/Sweden The sector capacity is rarely affected to the extent that restrictions needs to be implemented due to OAT activity in DK/SE FAB. Close co-operation between ATC and Fighter Control Strategic agreements No major traffic flows on CDR2s TSAs are strategically placed to reduce impact on GAT traffic flows