Case Study of IMTN Network B with A ET-IMTN 2001 ( Geneva, June 20 to 23, 2001) By Hiroyuki Ichijo Office of International Communications,JMA.

Slides:



Advertisements
Similar presentations
An outline of the GTS & the Improved MTN project for FWIS By Hiroyuki Ichijo Japan Meteorological Agency ISS/ITT-FWIS 2003 (Kuala Lumpur, October.
Advertisements

Status of Implementation at RTH Tokyo By Hiroyuki Ichijo Contents Contents 1. GTS facilities 2. GTS circuits 3. Use of the Internet 4. Collection of SHIP.
Slide 1 ET-CTS - GISC Network Bandwidth RequirementsSlide 1 GISC network bandwidth requirements A proposed method for an educated guess… Hiroyuki Ichijo.
RMDCN-TT report Matteo Dell’Acqua Meteo-France
GISC Development in JMA Doc. 4.5 (1) Presentation version ICG-WIS-6 (Seoul, February 2010) Hiroyuki ICHIJO (Co-chair of ET-CTS) Please consider our.
RTH AND NMC FUNCTIONS FOR GTS INFORMATION EXCHANGE T.K.RAY RTH,NEW DELHI,INDIA E Training Seminar on information and communication.
IMTN and managed data network services Technical Conference on the WIS (Seoul, 6-8 November 2006) Hiroyuki ICHIJO (Japan Meteorological Agency.
1 World Meteorological Organization Report to WG-PIW RA VI September 2008 Presented by David Thomas (PM-WIS) WORLD METEOROLOGICAL ORGANIZATION Weather.
Current Status of Implementation of MTN at RTH Beijing Li Xiang National Meteorological Information Center, CMA.
The WMO Information System (WIS)
1 World Meteorological Organization WMO Information System WORLD METEOROLOGICAL ORGANIZATION Weather – Climate - Water J.-M. Rainer, Chief ISS Division.
Managing & Moving Weather, Water and Climate Information in the 21 st Century WMO Information System (WIS) 4 th WCRP Observations and Assimilation Panel.
World Cities. Top Ten Cities,1950 (estimated from various sources) City Pop (in millions) Lat Long New York, USA N 74 W London, UK8.752 N 0 Tokyo,
Lecture Note No.5 TRAINING SEMINAR ON INFORMATION AND COMMUNICATION TECHNOLOGY FOR THE GTS (((( Improved RMTN/RMDCN for RAII The IMTN (Improved MTN) The.
Overview of the Improved MTN project Geoff Molloy Communications and Computing Branch Bureau of Meteorology Australia.
Report on the Improved RMTN project Contents 1. Background 2. Status of progress of the improved RMTN 2.1 Implementation of circuits 2.2 Migration to TCP/IP.
CMA’s new GTS system Submitted by YANG Genlu, China
1 World Meteorological Organization AR report to ADC May 2008 Presented by David Thomas (WMO) WORLD METEOROLOGICAL ORGANIZATION Weather – Climate.
1 World Meteorological Organization AR report to ADC September 2008 Presented by Don Middleton (NCAR), on behalf of WIS and Dave Thomas, Jean-Michel.
© Crown copyright Met Office APSDEU / NAEDEX 2012 Chris Little, Met Office October 2012 Exeter, UK.
The WMO Information System (WIS)
Status of the Global Telecommunication System connected with RTH Tokyo Japan Meteorological Agency Presented by Masahiro Kazumori Eighth Meeting on Asia-Pacific.
Joint ICM GTS-WIS MTN & ET-OI Sep Joint ICM on the GTS-WIS MTN and ET-OI meeting Kelvin Wong CBS ET – OI Co-chair RTH Focal Point WMC Melbourne.
Features of the new TCP/IP link between HK and Beijing (Guangzhou) Features of the new TCP/IP link between HK and Beijing (Guangzhou) Justin Waiman MA.
Status on RTH Tokyo (Item 2.1) By Hiroyuki Ichijo By Hiroyuki Ichijo Expert Meeting on the Exchange of Early Warning and Related Information Including.
Population(millions) Urban Area (estimate) 1Tokyo, Japan Mexico City, Mexico São Paulo, Brazil
STATUS OF IMPLEMENTATION AT RTH BEIJING SHI Peiliang, China
Status of the Global Telecommunication System connected with RTH Tokyo Sixth Meeting on Asia-Pacific Satellite Data Exchange and Utilization (APSDEU-6)
Collaboration for Beijing and Tokyo GISC prototypes -- Status of WIS center development and planning -- Submitted by Hiroyuki ICHIJO (Japan) and SHI Peiliang.
WIS data-communications functions and services, and implementation Progress report on Expert Team on WIS-GTS Communication Techniques and Structure (ET-CTS)
5/21/2004 Fred Branski May 21, 2004 NOAA/NWS Telecommunication Gateway GTS System.
SEOUL, S. KOREA PYONGYANG, N. KOREA KUALA LUMPUR, MALAYSIA
Changing Urban Environments. Worlds Most Populated Cities 1.Tokyo, Japan - 32,450, Seóul, South Korea - 20,550, Mexico City, Mexico - 20,450,000.
RA5 ISS MEETING WIS-GTS Honolulu, Hawaii 2-5 Dec 2009 Bryan Hodge Observational Network Data Communications Manager.
4/27/2004 Fred Branski April 27, 2004 NOAA/NWS Telecommunication Gateway GTS System.
1 World Meteorological Organization Report to ICT-ISS – Fourth Session November 2008 Presented by David Thomas (PM-WIS) WORLD METEOROLOGICAL ORGANIZATION.
Status of RTH Tokyo Japan Meteorological Agency Presented by Tatsuya Noyori Expert Team on WIS-GTS Communication Techniques and Structure (TOULOUSE, France,
Status of RTH Tokyo Japan Meteorological Agency Presented by Kenji Tsunoda Joint implementation-coordination meeting on the GTS-WIS MTN and meeting of.
Status of Implementation TCP/IP at RTH Beijing NMIC, CMA.
Status of the GTS connection to RTH Tokyo Eleventh Meeting on Asia-Pacific Satellite Data Exchange and Utilization (APSDEU-11) (Boulder, USA, 02 to 06.
Asia Pacific International Data Services Pricing & Analysis ‘Pricing Is Key’ © 2005 Frost & Sullivan. All rights reserved. This document contains highly.
Countries and capitals memory game Go to the answers.
GISC Brasilia status report Doc25 (AI 2)
(CBS/OPAG-ISS ) November 2007 Washington, USA
Status of GISC Tokyo GISC Tokyo / JMA.
Status and Plans of RMTN in RA V (For report to ICT-ISS Sep 2010)
GISC Tehran Status Feb, 2016 TT-GISC 2016-Doc18.
Automation of NMCs for GTS operation
WIS Implementation Status in RA II
Status Report of GISC Beijing
Regional Meteorological Telecommunication Network for Region II (Asia)
Outcome of the ET-CTS Meeting (Toulouse, May 2008)
WIS data-communication structure Outcome of study by ET-CTS (Expert Team on WIS-GTS Communication Techniques and Structure) Please consider our Earth.
Review of the current status of implementation of TCP/IP procedures and applications at GISC Beijing ET-CTS, Dakar, 5-8 April 2016.
Regional Training Seminar on GTS Techniques and Procedures
Peak speed through Internet
ET-CTS 2016 ASECNA, Dakar. Senegal Date: April 2016
Status Report of GISC Tokyo
WIS overview Submitted by: Secretariat (Doc 02b)
TT-GISC-2016 Doc 15 Agenda Item 2
Status of Implementation at RTH Tokyo
Outcome of the ET-CTS Meeting (Toulouse, May 2008)
MeteoFranceMPLS via Toulouse
Status Report of RTH Tokyo
Status of RA II WIS Implementation Plan
Status Report GISC Tehran
Countries and capitals memory game.
GISC – GISC mutual backup Backup Status Remarks
GISC New Delhi Status Dr. S. L. Singh
RTH Exeter Status Report – 2014 (Doc 22)
Presentation transcript:

Case Study of IMTN Network B with A ET-IMTN 2001 ( Geneva, June 20 to 23, 2001) By Hiroyuki Ichijo Office of International Communications,JMA

1. Seeking a possible and practical implementation 1. Seeking a possible and practical implementation Network D Network B Network A RA VI RMDCN Network C Tokyo Melbourne Washington Bracknell Offenbach Beijing Buenos AiresBrasilia Toulouse Prague New Delhi Sofia Nairobi DakarAlgiers Jeddah Cairo Moscow RTH- MTN Gateway RTH Existing network MTN PVC through Network Inter-Regional PVC through Network Network-to-Network Interconnection (NNI)

Melbourne Australia FRAME RELAY SCHEMATIC ( INFONET by Telstra) Dorval, Canada Washington NWS USA Buenos Aires Argentina Brasilia Brazil Pretoria, South Africa Tokyo, Japan Bracknell UK 256K 128K 256K 128K 64K 32K 8K8K 8K8K 64K 16K 8K8K NESDIS

FR Port Japan Local Line Tokyo Melbourne Bracknell FR Port Australia FR Port U.S.A. KDDI Frame Relay Gateway FR Port U.K. NNIGateway DACOM Frame Relay NNIGateway HKT IMTN Network B with Network A and additional links INFONET Frame Relay Seoul Hong Kong NNIGateway CAT Frame Relay Bangkok Buenos Aires Washington NWS / NESDIS Brasilia Pretoria Dorval

KDDI Tokyo Washington Bracknell Melbourne Telestra BT MCI WorldCom NNI “Some Clouds” One Cloud Tokyo Washington Bracknell Melbourne One of major Service providers ”a Single Cloud” Which is practical, “a Single Cloud” or “Some Clouds” ? Even “a Single Cloud”, it is possible that a true seamless network would not be always available…. But IMTN project makes progress towards “a Single Cloud” unless the implementation target would be in distant future. At least, the target of Network B should be implementation in 2002.

Centre A Centre B Router (FRAD) Centre C Router (FRAD) Router (FRAD) Frame Relay Network (ATM backbone) (ATM backbone) Frame Relay service Centre A Centre B Router Centre C Router Carrier’s Closed IP Network IP-VPN service Centre A Centre B VPN /Router Centre C VPN /Router VPN /Router Internet VPN service Internet Cost Security Throughput guarantee What kinds of services are allowable for the IMTN ? Frame Relay and IP-VPN may be allowable.

Difficulties in collaborative arrangements How will we deal with existing frameworks; Should we consolidate them into IMTN or not? That is a question! Melbourn e BoM Bracknell UK met office Washington NOAA /NESDIS BT Frame Relay WorldCom DorvalCMC WorldCom Dedicated lines TokyoJMA Buenos Aires Meteo AR BrasiliaINMET PretoriaSAWB RA V RMTN IMTN