ASAS TN 2nd Workshop 6-8 October 20031 ADS-B Safety Analysis (ASA & GSA) Bob Darby EUROCONTROL ADS Programme ASAS Thematic Network Second Workshop 6-8.

Slides:



Advertisements
Similar presentations
EUROCAE WG 73: UAS integration Elements for the European Commission UAS panel Presentation at Workshop 2 UAS insertion into airspace Gérard Mardiné (SAFRAN-Sagem)
Advertisements

Unmanned Aircraft Systems EUROCONTROL ATM Integration
1/10/20031 End-to-end QoS in the users' point of view ITU-T Workshop Geneva 1-3 October 2003 P-Y Hébert - ETSI.
Overview of the interoperability Regulation
1 CARE/ASAS Achievements and future activities Francis Casaux CARE/ASAS manager on behalf of EUROCONTROL.
Slide 1 July 2004 – FALBALA/WP5/FOR1/D – CENA, DFS, EEC, NATS, Sofréavia & UoG Agenda & Project Overview Thierry Arino (Sofréavia) CARE/ASAS Action FALBALA.
25 July Navigating Doors. 25 July Starting the Program A Doors shortcut icon is on the computer desktop Double-click the icon to start Doors.
27 June Report on two themes: Airport Management Weather & Environment by: Jan Terlouw (NLR) ATM 2003 Seminar, Budapest June 27, 2003.
The European Parliament and the Semantic Web - Some considerations Peter Brown Head of Information Resources Management European Parliament 01D-GRI_GEN(2003)0014.
July 30, Pro Rata Budgeting. July 30, Pro Rata Budgeting Pro Rata Detail by Funds reports are available on the Internet no later than October.
ASAS TN Second Workshop, 6-8 October 2003, Malmö ASAS-TN Implementation Strategy Plan Tony Henley BAE SYSTEMS.
ENAV S.p.A. ASAS TN I Workshop, April 20031/13 Airborne Spacing and Safety Alberto Pasquini - Deep Blue (ENAV)
Page 1 ASAS Thematic Network Second Workshop “Safety and ASAS Applications” Progress and contents Safety and ASAS Applications Progress and Contents Ken.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/ASBU/2012.
27 June Decision Support Summary 27 June 2003.
Using XSLT for Interoperability: DOE and The Traveling Domain Experiment Monday 20 th of October, 2003 Antoine Isaac, Raphaël Troncy and Véronique Malaisé.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-40/PIA-4 Improved Safety and Efficiency through the initial application.
1 Data Link Roadmap Overview Mike Shorthose, Helios Technology Jorge Grazina, European Commission 25 September 2002.
Advanced Safe Separation Technologies and Algorithms (ASSTAR) Project ASAS-TN2 Workshop #1 Malmö 26 th -28 th September 2005 ASSTAR is a Specific Targeted.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-80/PIA-1 Improved Airport Operations through Airport-CDM SIP/2012/ASBU/Nairobi.
Applications from packages I to III
Nov. 14, 2007 Systems Engineering ä System ä A set or arrangement of things so related as to form a unity or organic whole. ä A set of facts, principles,
Workshop on preparations for ANConf/12 − ASBU methodology
Enterprise Architecture
Codex Guidelines for the Application of HACCP
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Towards Implementation of ASA/GSA Package I” Pieter van der.
Page 1 Aircraft Surveillance Applications (Extracts from ASA MASPS, DO-289) Presented to ASAS-TN 3 rd Workshop Steve Koczo - Rockwell Collins Inc. Jonathan.
Aeronautical Information Services (AIS) Data Link Ernie R. Dash Raytheon (FAA FISDL) RTCA SC-206/EUROCAE WG-44/53 Weather in the Cockpit (WIC) August 9,
CRISTAL ATSAW Project Sep 2007 ASAS TN Christelle Pianetti, DSNA Simona Canu-Chiesa, Airbus.
Clustering ASAS Applications ASAS-TN2 First Workshop, Malmö 26 to 28 September 2005 Fraser McGibbon BAE Systems.
ASAS-TN Second Workshop, 6-8 October 2003, MalmöSlide 1 Airborne Surveillance Applications included in ‘Package I’ Francis Casaux CARE/ASAS manager.
CRISTAL ITP European Organisation for the Safety of Air Navigation CRISTAL ITP ASAS-TN, Paris Johan Martensson CASCADE CRISTAL ITPJohan Martensson ASAS-TN.
ASAS TN2 WP3: Assessing ASAS Applications Maturity Eric Hoffman EUROCONTROL.
1 EUROCAE EUROCAE Dedicated to Aviation Standardisation ASAS Standards: “From concept to equipment” David Bowen (Technical Secretary) April 24 th 2007.
3rd ASAS TN Workshop 19 April – 21 April rd ASAS TN Workshop Session 4: Strategy and Implementation Package I Requirements Focus Group (“Rapid.
International Data Link Symposium st October 2003, Newbury, UK FEASIBILITY STUDY FOR CIVIL AVIATION DATA LINK FOR ADS-B BASED ON MIDS / LINK16 Bob.
1 ATM System Wide Modeling Capabilities in Fast-Time Simulation 1 st Annual Workshop – NAS-Wide Simulation in Support of NextGen Dec. 10th – George Mason.
1 RFG Overview ASAS-TN Malmö September 2005 Jörg Steinleitner CASCADE Infrastructure WP Leader, EUROCONTROL European Organisation for the Safety.
SVDM ConOps 18 May 2010 Federal Aviation Administration 0 0 Space Vehicle Debris Threat Management ConOps Presentation to COMSTAC Space Transportation.
ASAS WORKSHOP Roma April 2003 Airlines’ perspective Nicolas Zvéguintzoff Assistant Director- Technical / Financial Liaison – Europe.
Projects EMERALD and EMERTA EMERALD WP5 The Specific case of ASAS/ADS-B.
ASAS-TN 3rd Workshop - Airbus ASAS Vision ASAS-TN 3 rd Workshop AIRBUS and Airborne Surveillance ASAS-TN 3 rd Workshop - Airbus and Airborne Surveillance.
1 ADS-B-NRA Status ASAS-TN Malmö September 2005 Jörg Steinleitner (prepared by Gilles Caligaris) CASCADE Infrastructure WP Leader, EUROCONTROL European.
KLM - Operations at Schiphol: how does ASAS fit? ASAS TN2: final seminar, April, Paris E. Kleiboer Sr. Manager Strategy ATM.
Air Systems Division GROUND ASAS EQUIPMENT Michel Procoudine Gorsky ASAS TN2 – Workshop 5 Toulouse 17th-20th September 2007.
April 2003ASAS TN April 2003 Workshop1 ADS Programme ASAS TN Workshop (28-30 Apr ‘03) “Package I Architecture and CBA Activities” Pieter van der.
1 September 2005 European Organisation for the Safety of Air Navigation ASAS Thematic Network II First ASAS TN II Workshop Malmo, Sweden.
ENAV S.p.A. 1 AENA / ENAV / DFS / LFV ASAS Thematic Network Workshop Malmoe, ASAS /ADS-B: SAMPLE ANSPs STRATGIES & EXPECTATIONS.
Session 1: Progress and Status of Implementation and Standardisation RFG Status ASAS-TN2 4 th Workshop Amsterdam April 2007 Jörg Steinleitner CASCADE.
ASAS TN Session 4 summary Billy Josefsson, LFV Rob Ruigrok, NLR.
European Organisation for the Safety of Air Navigation RFG ASPA-S&M Requirements Determination ASAS-TN th September Malmo, Sweden.
19-21 April 2004ASAS TN – 3 rd workshop AIRLINES/IATA OVERVIEW Needs and Considerations Anthony van der Veldt/IATA Assistant Director Safety Operations.
ASAS in ATC Domain plans ADAS Initiative Dragos TONEA Eurocontrol Glasgow,13 th of September 2006 European Organisation for.
Alberto Pasquini – Deep Blue Safety Assessment in MFF ASAS TN2 3-5 April 2006, Rome MENU: COVER | SUMMARY | OVERVIEW | TASKS | ALLOCATIONSCOVER SUMMARY.
The CASCADE Programme Blueprint for ADS-B Deployment ASAS-TN2 Workshop – Amsterdam April 2007 Christos Rekkas CASCADE Deputy Programme Manager, EUROCONTROL.
DIRECTORATE GENERAL FOR ENERGY AND TRANSPORT Information Day 6th Framework Programme 1st Call for Proposals, 5 Feb. 2003, Brussels ASAS operational improvements:
1 Roma, 3-5 April 2006 – ASAS TN2, 2 nd Workshop, Session 1 – When ASAS meets ACAS When ASAS meets ACAS Thierry Arino (Sofréavia, IAPA Project Manager)
Toward a New ATM Software Safety Assessment Methodology dott. Francesca Matarese.
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Chris Shaw, EUROCONTROL Experimental Centre
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Workshop on preparations for ANConf/12 − ASBU methodology
Sectoral Qualification Framework
Chris Shaw, EUROCONTROL Experimental Centre
Workshop on preparations for ANConf/12 − ASBU methodology
Presentation transcript:

ASAS TN 2nd Workshop 6-8 October ADS-B Safety Analysis (ASA & GSA) Bob Darby EUROCONTROL ADS Programme ASAS Thematic Network Second Workshop 6-8 October 2003

ASAS TN 2nd Workshop 6-8 October OUTLINE  Background  Current work  analysis processes  comments on the methods, not the results  Wider context & Conclusions  Safety is only part of SPR / IA  Requirements Focus Group  Longer term  Points of Contact

ASAS TN 2nd Workshop 6-8 October BACKGROUND

ASAS TN 2nd Workshop 6-8 October Safety Work History  : Stage 0  Initial Safety Study - brief look high level workshops  : Stage 1  Operational Hazard Analysis (OHA) based on “Case Studies”  Difficulty - not detailed enough definition of the applications

ASAS TN 2nd Workshop 6-8 October Safety Work History  2002:  Package I proposed at Rome  CARE-ASAS / EUROCONTROL development of Package I  EUROCAE WG51 & RTCA SC-186  Common applications review & proposal  Common methodology proposal - ED78A / DO-264  Guidelines for Approval of the Provision and Use of Air Traffic Services supported by Data Communications  In parallel:  Stage 2A Safety Contract launched  At the time (Jan 2002) the aim was to  Use EUROCONTROL Safety Assessment Methods (SAM)  Use ED78A as a means of compliance with the SAM  Aim has changed as ESARR4 developed and use of ED78A has proceeded, to establish an effective methodology. Differences/complementarity handled as an outcome.

ASAS TN 2nd Workshop 6-8 October CURRENT WORK

ASAS TN 2nd Workshop 6-8 October Stage 2A Safety Contract  Coordinated with CBA and Architecture work  Assessment of some ADS-enabled ASA and GSA applications defined in the Package I OSED - including ADS-B in a mixed surveillance environment  For each Package I application  OHA: building on the results of the ADS Programme Stage 1 OHA  ASOR: allocation to elements / domains within the architecture  from ASOR options: safety requirements for the ADS-B element based on the specific enabling infrastructure.  PSSA for one application, using a specific architecture  Issues:  Methodology and Software tools equally important as the results

ASAS TN 2nd Workshop 6-8 October Logical Flow Case StudiesOHA STAGE 1 (Draft) OSEDs OHA Functional Architecture ASOR Specific Implementation PSSA STAGE 2A ASFA Ground Surveillance Architecture Methods & Tools inc database Assessments - architecture guidance RESULTS CBA

ASAS TN 2nd Workshop 6-8 October Applications assessed Ground Surveillance Applications (GSA) ATC surveillance in en-route airspace ATC surveillance in terminal areas ATC Surveillance in non-radar area Airport Surface Surveillance Surface Traffic Awareness application Runway Incursion application Airborne Surveillance Applications (ASA) Enhanced traffic situational awareness on the airport surface Surface Traffic Awareness application Runway Incursion application Enhanced successive visual approaches Sequencing and merging applications

ASAS TN 2nd Workshop 6-8 October OHA process

ASAS TN 2nd Workshop 6-8 October OHA output (example) From “Enhanced Successive Visual Approach” OHA is summarised in a diagram. Details in several tables: OH summary table, that refers to Candidate safety requirements lists environmental procedural technical Recommendations list Causes list Supported by detailed OH tables

ASAS TN 2nd Workshop 6-8 October OHA - comments on process  Exhaustive & detailed...  … time-consuming to develop and to review  Mature process, used (with slight variations) by many European projects, NUP, MFF, …  Needs tool support to ensure  consistency between diagrams and tables  traceability and accurate cross-referencing between all tables  database is being developed  Derived from application model in OSED  Changes to OSED may mean complete rework of OHA

ASAS TN 2nd Workshop 6-8 October ASOR process  Follows on from OHA  traceability essential  Objective: identify  responsible domains/elements (ATC, aircraft, crew,…)  system failure relationships  mitigation means strategy  Key processes:  Building the fault tree  stop when the safety requirement can be exclusively met in a domain  Allocation of safety requirements  several options

ASAS TN 2nd Workshop 6-8 October ASOR - comments on process  Relatively new process - learning as we proceed  More complex for surveillance than for communications  No single correct answer - tradeoffs will occur  Trees give the understanding - tables give the detail  Tools for traceability and consistency essential

ASAS TN 2nd Workshop 6-8 October PSSA  Specific to a particular implementation  Assess if the proposed architecture is safe for its intended purpose  ASOR has already mapped safety requirements to the domain  Now look at the architecture within the domain: i.e. main functional (and physical) components  EUROCONTROL study example: Toulouse airport  Package I applications:  Airport Surface Surveillance  Enhanced traffic situational awareness on the airport surface  Surface Traffic Awareness application  Runway Incursion application  Just starting this phase of the study

ASAS TN 2nd Workshop 6-8 October Overall Comments  Learning about the processes as we use them going from the generic to the specific  Status  OHA: mature but effort intensive  ASOR: developing well  PSSA: just started but relatively straightforward  Overall: large effort  Tool support essential, especially when iterating and reworking  Complementary approach to identify critical areas would pay dividends  OSED is critical - clarity and accuracy of application modelling is vital

ASAS TN 2nd Workshop 6-8 October WIDER CONTEXT & CONCLUSIONS

ASAS TN 2nd Workshop 6-8 October Safety is only part of the process OSED Operational Service & Environment Definition OSA Operational Safety Assessment OHA & ASOR OPA Operational Performance Assessment Identify & allocate performance requirements IA Interoperability Assessment SPR Safety & Performance Requirements Interop Document

ASAS TN 2nd Workshop 6-8 October Preparation for RFG/3  Joint EUROCONTROL, FAA, EUROCAE, RTCA “Requirements Focus Group”  1st-4th December 2003, Washington DC  OSEDs: OSED Harmonisation Group  First complete PI OSED due out soon  Safety: EUROCONTROL, NUP, MFF, …  Convergence on the methods  More coordination and consensus needed - EC can help?  SPR & IA as a whole  ad-hoc SPR/IA group working since July  aiming at common approach for Europe and USA; extend world-wide?

ASAS TN 2nd Workshop 6-8 October Longer term considerations  Operational expertise to validate the analysis conclusions  Complementary methods could be of value  for greater efficiency overall  for confirming results  Coordination with Safety Unit, SRC and EASA

ASAS TN 2nd Workshop 6-8 October POINTS OF CONTACT  EUROCONTROL ADS Programme  visit the ADS Programme website :   STNA & Sofréavia  who have carried out the detailed work and developed in a practical form the processes described today  RFG colleagues  discussions in preparation of material for RFG/3