PLM Implementation in L&T Heavy Engineering Ninth ARC India Forum, Pune August, 2011 Achieving Operational Excellence Through IT and Automation Solutions.

Slides:



Advertisements
Similar presentations
Autodesk Integrations Overview SmartDesk A seamlessly integrated, affordable, out-of-the-box, Windows based drawing and document management tool for.
Advertisements

CORPORATE PRESENTATION. ABOUT US StrategicERP® from ITAakash Strategic Software (P) Ltd. is software platform for Start-to-end process automation, information.
© 2010 Quick InfoTech Limited CONFIDENTIAL: For limited circulation only © 2008 MindTree Consulting© 2010 Quick InfoTech Private Limited CONFIDENTIAL:
Copyright Hub Software Engineering Ltd 2010All rights reserved Hub Document Manager Product Overview.
Welcome to the World of Web-Based ERP Solution
Product Configurator for Marketing to Manufacturing design automation.
ENOVIA SmarTeam V5R17 Portfolio. ENOVIA SmarTeam 2 ENOVIA SmarTeam Offering © Dassault Systèmes, All Rights Reserved. Community: Strict access to.
1 Autodesk’s Manufacturing Solutions Kvalitetssikring i engineering processen Mads Storgaard.
1 Chapter 7 IT Infrastructures Business-Driven Technology
DOCUMENT MANAGEMENT ZETA ERP.
Siemens PLM Software Overview 28 th of May 2008 Bulgaria Colin Johnson.
Product Lifecycle Management: Meeting the Needs of Collaboration
Document Management Systems For Government Agencies Infocrew Solutions Pvt Ltd.
Click to add text © 2010 IBM Corporation OpenPages Solution Overview Mark Dinning Principal Solutions Consultant.
Microsoft Business Intelligence Gustavo Santade Business Intelligence Project Manager Improving Business Insight Building a cube using Analysis Services.
Doc Document Management Systems For Manufacturing Industry Infocrew Solutions Pvt.Ltd.
E-Business Lecture 3 Website Development and Management Process.
Application of PDM Technologies for Enterprise Integration 1 SS 14/15 By - Vathsala Arabaghatta Shivarudrappa.
PLM for the US Army Dr. Raj Iyer Team Lead, PLM Technologies
Taking the Web to the Next Level. Current Web Issues  Not reaching target audiences  People can’t find the information they need  Too difficult to.
Karomi Artwork Management System. Current Challenges Multiple Stakeholders Lack of Critical Path Long lead times Missed Deadlines Compliance Issues Increased.
New Product Development Management NPDM 11 Mohsen SADEGHI
Teamcenter Update May 2012 Agenda  What is Teamcenter  Benefits  Status  Planned Next Steps.
1 R10.x Implementation Project for a leading Auto Manufacturer An ITC Infotech Case Study May 2012.
Product Lifecycle Management Solutions of Enterprise Group 8 楊士霆 (d927821) 吳友仁 (g923836) 白珊慈 (g923840)
PTC Product Overview.
Visio Work Visually to Achieve Operational Excellence and Lean Organization Data-Linked Diagrams Create 2K+ processes, 30K schema files Collaborate.
Document Management System for Construction Industry From Infocrew Solutions Pvt Ltd.
OOI CI LCA REVIEW August 2010 Ocean Observatories Initiative OOI Cyberinfrastructure Architecture Overview Michael Meisinger Life Cycle Architecture Review.
7-1 Management Information Systems for the Information Age Copyright 2004 The McGraw-Hill Companies, Inc. All rights reserved Chapter 7 IT Infrastructures.
Inspection & Assembly Solutions for Advanced Manufacturing.
7-1 Management Information Systems for the Information Age Copyright 2004 The McGraw-Hill Companies, Inc. All rights reserved Chapter 7 IT Infrastructures.
Sigur Ecommerce Pvt. Ltd.
Product data management
Federated Product Data Exchange Mark Reisig Federation Inc.
Figure 9.1 Different management tools and PDM systems. © 2003 Crnkovic, Asklund, Persson Dahlqvist, ”Implementing and Integrating Product Data Management.
Catawba County Board of Commissioners Retreat June 11, 2007 It is a great time to be an innovator 2007 Technology Strategic Plan *
Stoneworks Software Corp. Presents Delegate for Windchill® An Executive Overview.
Content Master Content Master is a complete Electronic Document Management Solution from our Productivity Enhancement suite.
S1 Global Plug Compatibility CAD Tools & Collaboration April 23, 2008 Don Mitchell, FNAL.
Manufacturing Operations Center 10 - Differentiators - The Pharmavite Experience APAC Training, Feb-Mar, 2010.
Agile Enterprise Visualization Overview David Edwards, Product Marketing Manager.
PTC Creo Unite Technology
1 Enterprise Open Source Kit SharePoint PLM download available on Microsoft CodePlex
Business Intelligence dan Dashboard Ensys – minggu ke 6.
Accounting Guru Cloud ERP (Enterprise Resource Planning) ERP Software https:
Slide 1 Data Warehousing in CIM  2000 YourNameHere Data Warehousing in Computer Integrated Manufacturing Steve Daino IEM 5303.
Enterprise Resources Planning (ERP) Definition 1 Enterprise Resource Planning A method for the effective planning and controlling of ALL these sources.
Je-Kyun Kim Swapnil Patil William Lindsey Ken Brenner Sumit Gangwani Varun Jain.
©Larsen & Toubro Infotech Ltd. Privileged and Confidentialwww.LnTInfotech.com Discover the Champions
The New Generation of CAD Tools
Background - Business Vision
Arkom Engineering Consultants
How to become paperless and achieve a fast ROI
MAJOR MODULES Recruitment Management Attendance Management
Using ERP to Streamline and Enhance Your Organization
Electronic Business Systems
Azure Infrastructure for SAP®
Discovering Computers 2010: Living in a Digital World Chapter 14
Chapter 17 Using Technology in a Competitive Environment.
VE Solution Overview Idea to Performance VE Process Suite – Deep Dive
Pertemuan 19 Materi : Buku Wajib & Sumber Materi :
Achieving Operational Excellence and Customer Intimacy:Enterprise Applications Chapter 9 (10E)
Requisite of Mechanical design Training Mechanical design engineering is a creative and demanding branch of mechanical engineering. The engineers from.
Faster delivery using Device Farm
SELL THE RIGHT PRODUCT ─ EVERY TIME
Creating value for the public sector
Teledyne DALSA – Prophix story
Presentation transcript:

PLM Implementation in L&T Heavy Engineering Ninth ARC India Forum, Pune August, 2011 Achieving Operational Excellence Through IT and Automation Solutions S.S.Iyer Joint General Manager Larsen & Toubro Ltd. ss.iyer@hed.ltindia.com

Businesses in Heavy Engineering Process Plant Equipment Fertilizer & Petrochemicals Coal Gasification & Power Plant Refinery, Cracker, Oil & Gas Defense, Nuclear, Aerospace Weapon Systems & Sensors Marine Equipment Electronics Nuclear Power Equipment Aerospace Ship-building

Nature of Businesses Model : Engineer to Order (E.T.O.) Markets : Domestic & Exports Customers : Pvt. / Public / Strategic Sector; EPC Cos. Orders : Development Type, Execution Type Products : Heavy Equipment & Systems Engineering : Mechanical, Electronics Functions : Design & Manufacture Projects : Classified & General Cycle Time : <1 Year to > 7 Years Execution : Design ‘Anywhere’ Build ‘Anywhere’ Manufacturing Resources: In-House , Sub-Contractors Manufacturing Locations: Powai, Hazira, Ranoli, Talegaon, Coimbatore, Bengaluru, Vishakhapatnam, Sohar

Documentation BOM Paper Documents Specifications E-Documents Analysis PDF – Word Analysis Reports Scanned Images Solid Model Drawings Images 4

Scenario Engineering Software: MCAD, ECAD I.T. platforms Personal Computers Department Servers Enterprise Level Systems (ERP, CCPM, PDM) Legacy PDM Systems BaaN, Windchill, Metaphase, Team Center CAD Systems 2D – AutoCAD, 3D – CATIA, UGNX, Orcad… Multiple Repositories …. Major challenges in Order Execution….Decision to go for PLM

PLM Implementation in H.E. Project SARAL Simplification And Rationalization Across L&T HED Project to consolidate all the disjointed engineering applications onto one PLM platform to streamline and improve the following: Bid and Proposal Engineering Management E-BOM and M-BOM Management Engineering Change Management Manufacturing Change Management Quality Management Engineering and Project Reports & Dashboards

Implementation Steps Selection of a PLM system – RFP, Demos, Visits Order placement on Dassault Systemes for MatrixOne PLM Selection of L&T Infotech as the implementation partner Finalizing the I.T. architecture – database, operating systems Formation of cross-functional / location team within H.E. Study, design & finalize the businesses processes Develop, test & implement the processes on the PLM platform Build awareness & train end-users in use of the PLM system Migrate legacy systems to PLM and shut down parallel systems Streamline & make operational the new PLM processes Support & maintain the new PLM system Improve processes and increase adoption

Non Conformity Resolution (NCR) PLM Processes Pre Order Enquiry Process Post Order Pre Mfg. Mfg. Post Mfg. Umbrella Processes Document Management Vendor Capability Assessment Audit Process Idea Management Requirement Management Task Management Project Creation Part & BOM definition Change Mgmt. (ECR/ECO) Non Conformity Resolution (NCR) Final Documentation

PLM Processes, Integrations & Migrations D:\ShriramSoni\Projects\HED\PDLC\Requirement

ENOVIA PLM Central Repository Parts Catalog CAD Project Collaboration In summary, a connected Pro/E Wildfire means you can: Smoothly work in a product development process – without artificial breaks between creation, collaboration, and control Seamlessly access the local file folders or Windchill PDMLink data management system and directly drag and drop files into and out-of the Pro/ENGINEER session. See a task list as part of a workflow, perform enterprise searches for product data, all from within the Pro/E environment. Easily search and browse on-line catalogs of standard components and drag and drop those components directly into Pro/ENGINEER Quickly publish a complex design to a controlled-access project area like Pro/COLLABORATE or Windchill ProjectLink for additional work by a team member, and then, easily download the newly modified version when it’s ready Bring the remote talents of a project team together, in real-time to advance a design or communicate new ideas Take advantage of idle computing power to streamline an engineering department’s process. Product Data Management Visualization BAAN ERP System 10

Benefits Web enabled Online System Common Platform & Repository Common Standardized Processes Project based Team Definition Role based Access Control Transparency & Traceability Paperless Working Collaboration across locations Data back-up & Disaster Recovery

Thank You