Black Canyon Trail October 2007. Evolution of the Trail 1919: The Department of the Interior designated the route as the Black Canyon Stock Driveway 1969:

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

EPITA IT Markets Basic Finance and Marketing
HR A 1 © Copyright 2004 The Trust for Public Land O`ahu Land Trust Forum January 20, 2007.
PUBLIC WORKS DEPARTMENT MILLS ROAD PAVING MSBU PUBLIC HEARING October 30, 2007 PUBLIC WORKS DEPARTMENT MILLS ROAD PAVING MSBU PUBLIC HEARING October 30,
ORDER OF THE ARROW ECHOCKOTEE LODGE NORTH FLORIDA COUNCIL #87 BOY SCOUTS OF AMERICA ILLINEK LODGE 2006 ANNUAL REPORT Abraham Lincoln Council January 3,
The Tilt of Earth Terms Earth’s tilt 23.5°
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 40 The Stock Market Crashes.
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
2011 ITRS Revision Guidelines1 JAN – MARCH – ITRS TABLES DRAFTS PREPARED –ITWGs and CrossTWG Study Group meet each month with their teams to work Difficult.
Welcome INCOSE Orlando September 15, Welcome Guests Sign-in Sheet Sign-in Sheet Welcome Packets Welcome Packets Welcome Space Coast and Central.
Mourad Loulou, Tunisia Section Chair 1 Mourad Loulou Tunisia Section Chair IEEE Tunisia Section.
Regional Registry/Registrar Events Tim Cole Chief Registrar Liaison 7 March 2010.
Click to edit Master title style »Click to edit Master text styles –Second level Third level –Fourth level Fifth level Construction Update 11/13/2012 Larry.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
2008 MTA NYC Travel Survey Summary of Selected Results June 22, 2009.
Performance of Hedges & Long Futures Positions in CBOT Corn Goodland, Kansas March 2, 2009 Daniel OBrien, Extension Ag Economist K-State Research and Extension.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Gadsden City High School Construction Progress. Gadsden City High School March 30, 2005.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
1 Learning Touchmath *Graphics taken from
Year 6 mental test 5 second questions
Duration CONSTRUCTION Opening Date EQUIP INSTALL. & TEST Incheon International Airport Control Tower Outcome Progress DESIGN & AWARD : AOR 36 MONTHS.
The Success of the Kalamunda Circuit
…or matching Georectification of Historic Aerial Photographs for Douglas County, Kansas ESRI Education Users Conference 2004 Rhonda Houser, University.
Prescott Circle Trail Fulfilling a Vision
Richmond House, Liverpool (1) 26 th January 2004.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
Population Change: 2005 versus 2004 More than 2% 1% to 2% 0% to 1% Less than 0% US: 0.94%
© Richard A. Medeiros 2004 x y Function Machine Function Machine next.
NHTSA Support for Driver Education
ABC Technology Project
Primary research figuresPrimary research figures These are some of the results from my primary research. percentages of people who like/dislike the show.
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
LOWER YUBA RIVER ACCORD Monitoring and Evaluation Program Redd Surveys Casey Campos PSMFC.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
Weather Services RFP Kent Mayer Assistant Chief Maintenance Engineer Nevada Department of Transportation Maintenance Decision Support System (MDSS) 2006.
IP Multicast Information management 2 Groep T Leuven – Information department 2/14 Agenda •Why IP Multicast ? •Multicast fundamentals •Intradomain.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
© Charles van Marrewijk, An Introduction to Geographical Economics Brakman, Garretsen, and Van Marrewijk.
Department of Management Sciences, COMSATS Institute of Information Technology, Islamabad, Pakistan 1 Employment Opportunities in Projects (Some graphics.
Created by Susan Neal $100 Fractions Addition Fractions Subtraction Fractions Multiplication Fractions Division General $200 $300 $400 $500 $100 $200.
Public Meeting Presentation March 15, Project Location Project Purpose –Traffic reliever to I-95 –Integrate road with the Northwest Sector Plan.
The Future of Higher Education in Further Education Colleges Swindon 17 May 2007.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
COMPUTER B Y : L K. WINDOWS INFORMATION B Y : L K.
Addition 1’s to 20.
25 seconds left…...
Name ____________________ Date ___________ Period ____.
1 Overview of Regulations for Water Quality Protection in South Carolina n Federal Clean Water Act/ NPDES Storm Water Program n South Carolina Pollution.
Week 1.
We will resume in: 25 Minutes.
Ethnicity Category2 Years3 Years4 Years5 Years6 Years Asian or Pacific Islander (N=84) 10%11%17%27% Black Non-Hispanic (N=28) 0%7% Hispanic (N=316) 2%10%24%34%36%
Immunobiology: The Immune System in Health & Disease Sixth Edition
Immunobiology: The Immune System in Health & Disease Sixth Edition
February 14, th Annual Management Information Systems [MIS] Conference An Introduction to NH Networks NH Department of Education Irene Koffink Michael.
“Connecting Our Communities” January 6, Mission “To encourage the creation of trails and greenway corridors, parks, and preserves in order to enhance.
Black Canyon National Recreation Trail April 2013.
By: Grace. E. Williams. Location  How many miles between Boulder CO and Denver CO? About 30 miles.
Project Name County: X (Cuyahoga District #) Photo Type (All-purpose, Mountain Bike, Bike Lanes, etc.— pavement must be dedicated for non- motorized use.)
A47 / A12 Corridor Improvement schemes
2018/2019 School Calendar July August September October November
Presentation transcript:

Black Canyon Trail October 2007

Evolution of the Trail 1919: The Department of the Interior designated the route as the Black Canyon Stock Driveway 1969: Designated as the Black Canyon Trails Area for recreational use 1987: The trail corridor was formally dedicated as the Black Canyon Trail, a non-motorized trail

Early Construction Most of the trail shared historic mining and ranching roads From the 1960’s through the 1980’s a few miles of non-motorized single track trail were constructed By 1994 most of the existing trail had been identified by signs, although much of the trail was, and still is, on double-track

Birth of a Partnership BLM hired IMBA as trail consultants in 2003 to help design and mark the trail and to help recruit and train volunteers Trail building training was offered to volunteers in March 2004 at Ben Avery shooting range north of Phoenix Remaining volunteers continued meeting and discussed forming an organization

The Result Design by Jean Anderson

Black Canyon Trail Coalition bctaz.com All volunteer organization that includes equestrians, mountain bikers, hikers and motorized trail users Incorporated as a non-profit corporation in December 2005 Awarded the 2006 “Take Pride in America” award for a non-profit organization presented by the Department of the Interior

Black Canyon Trail Coalition bctaz.com Short article in the March, 2007 edition of the National Geographic Explorer magazine Night photo of the trail was published in Bike magazine in August, 2007 Article published in Sweat Magazine in October, 2007

Construction Progress Little Pan Loop was completed in spring, 2006 (5 mile loop) Cheap Shot segment was completed in spring, 2007 (3 miles) Horseshoe Bend segment completed in spring, 2007 (1.5 miles) Skyline segment will be completed in Nov, 2007 (3 miles)

Construction Progress 4.5 miles of new single track trail in Maricopa County – 21 miles total 10 miles of new single track trail in Yavapai County –The remaining 32 miles in Yavapai County is double track and older single track

Volunteer Hours 2004: 250 hrs ($3,500) 2005: hrs ($6,545) 2006: 1015 hrs ($14,210) 2007: hrs ($19,747)

Future Construction Begin work on northern section in fall 2007 Southern section: –Realign first mile along Deadman Wash –Add two loops near Doe Springs –Connect with Maricopa County Trail System

Upcoming Dates 2007 Trail Workdays –Oct 6 & 20 –Nov 3 & 17 –Dec 1 & 15 Golden Pulaski Ceremony –Jan 12, 2008

Use, Respect and Enjoy The Black Canyon Trail Bctaz.com