St. Croix River Crossing Project Public Information Meeting

Slides:



Advertisements
Similar presentations
St. Anthony Falls Bridge Replacement Jon Chiglo, P.E., Project Manager.
Advertisements

Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
Presented by: Mike Sisson February 23, It is the Law The Americans with Disabilities Act of It is the Right Thing to do Provide Equal Access.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Indianapolis Airport Interchange Bridges Presented to: TRB Bridge Aesthetics Subcommittee January 11, 2005.
Intelligent Transportation Systems GDOT ITS Concept of Operations Presentation to ITS GA June 28, 2007.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Alachua County BoCC Meeting November 8, Project Background and Location Study Purpose Study Activities Bridge Alternatives Evaluation Schedule.
The decision box represents key management decisions and serve as the GATES which delineate phases. The decision can be to proceed, exit, or recycle. More.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
Newport South Beach Peninsula Refinement Plan. Newport South Beach Peninsula Located on the south side of the mouth of the Yaquina Bay and the crossing.
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
Feasibility Study FOREST GLEN PASSAGEWAY April 10, Isiah Leggett Montgomery County Executive Arthur Holmes, Jr. Director Department of Transportation.
The Software Product Life Cycle. Views of the Software Product Life Cycle  Management  Software engineering  Engineering design  Architectural design.
Sept. 9, 2004 Bike/Ped Programs & Projects 101 How state programs work How state programs work How projects are implemented How projects are implemented.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Detroit River International Crossing (DRIC) Study 2007 Ohio Conference on Freight Toledo, Ohio September 18, 2007.
Value Engineering. Definition Value Engineering (VE) is defined as a systematic process of review and analysis of a project, during the concept and design.
Virginia Department of Transportation (VDOT) Value Engineering Program Virginia Department of Transportation (VDOT) Value Engineering Program VDOT 6/14/2012.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
THE DESIGN PROCESS. General Design Process Need –Determine functional requirements… Specification –Identify essential problems […] –Search for … solution.
© 2008 Mass Transit Experience Contact: Curt Bailey, President (248)
Northern Lights Express High Speed Rail: MN APA Conference September 2011.
 The Project Team › Design, Planning & Construction:  Hubbell, Roth & Clark, Inc. (HRC)  Grissim, Metz, Andriese Associates (GMA)  O’Neal Construction.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
CCJPA Sacramento to Roseville 3 rd Track Project Sacramento Stakeholder Advisory Committee (SAC) Meeting #1 HDR Office Tuesday, May 20, :00 - 9:00.
ISO 9001: 2000 Certified Audit Process What to do.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
ADOT Multimodal Planning Division Planning Assistance for Rural Areas (PARA) Program Overview December 4, 2013.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
1 Cold Spring Canyon Bridge Proposed Suicide Barrier Project Information Meeting & Open House Sara von Schwind Caltrans Project Manager.
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
Bridge Information Modeling (BrIM): Evolving into a Model Based Industry An Owners Perspective Scot Becker Director, Bureau of Structures Wisconsin DOT.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2011/12 – 2015/16 Presentation to Board of County.
Industrial Design Chapter 10 EIN 6392, Summer 2012 Industrial Design.
Signal Optimization Study Community Development Department.
Bridge Girder Alternatives for Extremely Aggressive Environments Project Manager: Will Potter, P.E. - FDOT Research Team: Jeff R. Brown, PhD, Assoc. Professor.
Fifty9 Design Schematic Design Review KIRBY DR IH-59 South St Richmond.
2010 Bicycle and Pedestrian Work Program Update.  Several top projects from 2008 Work Program have been completed.  Design is ongoing on other top projects.
August 19, 2015 Port Bienville Rail EIS Scoping Meeting Presented by: Rhea Vincent Mike McGuire.
DIFFERENT TYPE OF BRIDGES
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
Major Project Scoping Committee.  Two previous studies to develop improvements for the I-35W Corridor ◦ Project Limits were from 42 nd to I-94 ◦ Project.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
I-80 San Pablo Dam Road Interchange Project – Phase 1.
BIM October-2014Dr. Walid Al-Awad 1 Building Information Modelling.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
Public Input Meeting April 16, Meeting Schedule Housekeeping Meeting Schedule – Open House – 6:00-6:30 pm – Presentation – 6:30-7:00 pm – Q&A –
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
High Bridge Re-Deck Project
The Central Avenue Connector Trail
Light Rail Transit Project
Multi-state Corridor Pooled Fund Program
Blatnik Bridge Management Study
Draft Transportation Element September 6, 2017
Dave Kuhn Assistant Commissioner
2K CB FDR Overview:  Agenda, Charge, Review Process
City-wide LED Street Light Conversion Program
Electrical Engineering
Regional Architecture Development for Intelligent Transportation
Endorsement of the Recommended Design Concept (Preferred Alternative) for Transforming I-66 Outside the Beltway Board Transportation Committee October.
FEASIBILITY AND COST PRESENTATION – 9/26/17
Acquisition Details: Owners: James E Joyce Sr. Revocable Intervivos Trust and Gloria A Joyce Revocable Intervivos Trust Location: Section 27, Town of.
NRRA Pavement Workshop 2019
EIS Working Group May 23, 2019.
I Street Bridge Replacement Project
Chapter 10 EIN 6392, Fall 2009 Industrial Design
Presentation transcript:

St. Croix River Crossing Project Public Information Meeting St. Croix River Crossing, Preliminary Engineering and Design Criteria Mn/DOT Contract No. 92530

Project Elements Extradosed spans MN approach spans and ramps

General Study Description Evaluating the design and making refinements to enhance safety, and life cycle operations and maintenance of the structure. Verify the structural sufficiency and feasibility of the conceptual bridge design as summarized in the Visual Quality Manual. Evaluating a number of options related to the sizes of structural members with the goal of reducing cost while maintaining the overall appearance as outlined in the Visual Quality Manual. Evaluating the constructability of the concept design and recommending appropriate refinements. Coordination of these efforts with appropriate agencies, stakeholders and the general public Prepare technical documents that will be used by the Minnesota Department of Transportation to prepare a solicitation for the final design and construction of the bridge.

Progress Images View of refined 3-column form Road deck view View along exterior barrier View of refined 3-column form View along north side at tower

Elements Under Study Two vs. three column configuration The goal is to delete the center column if structurally possible. One vs. two box girder configuration and depth of structure The two box option requires struts be placed between them. The option will be selected based upon cost and constructability issues. The depth of the box girders is also being studied with the goal to reduce depth and overall cost Two column configuration Three column configuration One box girder Two box girders

Elements Under Study Cable attachment (exposed vs. covered) Covered cable attachment Exposed cable attachment

Additional Study and Design Efforts Pedestrian railing and path lighting design Bridge aesthetic lighting design Color selections

Loop Trail Inboard of Towers Potential overlook plaza at tower View looking along trail

Loop Trail Outboard of Towers Trail widening at tower View looking along trail