Consensus-Building and Its Role in Successful Stormwater Utility Implementation Danny Bowden, City of Raleigh Scott McClelland, CDM Presented at: NC APWA.

Slides:



Advertisements
Similar presentations
NPDES Phase II in Wake County: Forging A Collaborative Approach to Stormwater Management APWA Conference September 19, 2005.
Advertisements

What is a Storm Water Utility? A storm water utility is a method of financing the administration, planning, implementation and maintenance of storm water.
The Greening of North Carolina Network NCSU IES: GNCN:
4/7/2015 Workshop: Development Sustainability & Stormwater Planning/Design Stormwater Infrastructure Financing: Getting Decision Makers on Board Mike Hall,
Shingle Creek and West Mississippi Watershed Management Commissions Third Generation Watershed Management Plan.
Utah Pollutant Discharge Elimination System (UPDES) Utah Sewer Management Program (USMP)
Public Involvement & the Early Education Campaign John White Director of Public Policy, Greater Durham Chamber of Commerce 1.
Beyond ERUs: Sustainable Stormwater Finance SC Stormwater Forum Jeff Hughes, Environmental Finance Center (919)
Waste Site Cleanup Advisory Committee Meeting June 23, 2011 MassDEP Reform Initiatives.
PROPOSITION 218 IMPACTS ON UTILITY USER FEES Case Study City of Dixon Sewer Rate Repeal of 2007.
GFOAz May 11, 2007 The ABC’s of Municipal Financing.
Slide 1 EPA Stormwater & Water Regulations: Local Impacts & Balancing Power 2011 Congressional City Conference.
Clean Water Act Integrated Planning Framework Sewer Smart Summit October 23, 2012.
The coming storm: Managing Roanoke’s Stormwater Infrastructure Challenges Solutions for Roanoke’s future.
South Carolina Finance Workshop for Small Water Systems June 4, 2013 Water Partnerships: Financial Advantages and Challenges SC Case Study: Lowcountry.
Non Ad Valorem Assessments Solid Waste Stormwater Code Enforcement.
Fort Bragg Cantonment Area Cape Fear River Basin LIDAR data have been used to create digital contours and topographic maps. 1.A Digital Elevation Model.
Collaboration Nation: Piloting EPA’s Small Local Governments Compliance Assistance Policy Ken Harmon, Attorney Office of Compliance U.S. Environmental.
Developing a Waste Water Discharge Fee Programme in Sri Lanka Kolitha Himal Muthukuda Arachchi Deputy Director General, Pollution Control Central Environmental.
October 4, 2004 Detrich B. Allen City of Los Angeles Environmental Affairs Department 1 Siting New Development Detrich B. Allen General Manager Environmental.
COLORADO STORMWATER COUNCIL – MS4s WORKING TOGETHER Jill Piatt Kemper, PE, Sr. Environmental Engineer City of Aurora, CO (Phase I) Council Chair.
State Energy Components of the American Recovery and Reinvestment Act of 2009 Seth Effron, State Energy Office July 29, 2009.
环境保护部环境规划院 Study on Design of Wastewater Tax: from Wastewater Pollutant Discharge Levy to Environmental Tax Ge Chazhong Chinese Academy For Environmental.
Crafting Stormwater Programs Oregon Coastal Planners Fall Network Meeting October 9, 2008 Florence Event Center Alissa Maxwell, PE.
Funding Green Infrastructure Solutions: Stormwater Management in Pennsylvania Liz Garland American Rivers ABSTRACT Across the nation, American Rivers is.
THE COST AND LEVEL OF SERVIC E PRESENTED BY: COURTNEY REICH, AICP ECOLOGICAL PLANNING GROUP Stormwater Management Programs for Local Governments.
Streamlining Development Permitting March 8, 2011.
Introduction to PA Act 167 Stormwater Management Planning Little Juniata River Watershed April 21, 2005.
City of Lino Lakes, Minnesota Financing Plan Highlights Citizens’ Charter Review Task Force March 29,2007 Pavement Management Report Financing Plan Presenter:
Water Supply Planning Initiative State Water Commission November 22, 2004.
1 The Rise of Regionalism in Water Resources John K. Woodling California Department of Water Resources North Bay Watershed Association Conference April.
1. 2 Managing stormwater Stormwater runoff is generated when rain and snowmelt flows over land or impervious surfaces and does not percolate into the.
Laila Racevskis 1, Tatiana Borisova 1, and Jennison Kipp 2 1 Assistant Professor, Food and Resource Economics Department, University of Florida 2 Resource.
Julie Conroy, AICP, Senior Environmental Planner Metropolitan Area Planning Council.
Chesapeake Bay Policy Committee Meeting Bay Program Water Quality Goals: Focus on Funding Presented to COG Board of Directors September 10, 2003.
Bassett Creek Water Management Commission Joint Advisory Group Meeting January 23, 2001.
Workshop 2 – Administrative Structure Recycled Water Feasibility Study Rancho Murieta Community Services District January 8, 2008.
Urban BMP Incentive Study (HJR 107) And Other Interesting Legislative Items Delegate David Bulova August 10, 2007.
APPA’s Financial Planning for Municipals Mark Beauchamp, CPA, CMA, MBA September 27, 2005 Business & Finance Workshop.
Stormwater Management for Colleges and Universities Phase II for Colleges and Universities State Stormwater Programs Industrial Facilities.
Water Quality Management Plan Update Board of Directors March 25, 2009.
Overview of Integrated Solid Waste Management (ISWM) Presentation made at the European Commission 7 th Framework Programme on Capacity Building Workshop.
Click to edit section. Needs for a Stormwater Management Program NFIP/CRS Emergency Response Flood Protection TMDLs Water Quality NPDES Development Review.
Indicators to Measure Progress and Performance IWRM Training Course for the Mekong July 20-31, 2009.
Laguna Creek Watershed Council Development of the Laguna Creek Watershed Management Action Plan & It’s Relevance to the Elk Grove Drainage Master Planning.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
Streamlining – The Need: Costs Saved and Lessons Learned Facilitating Disaster Preparedness, Response & Recovery.
N.P.D.E.S. PHASE II Virginia Beach. Local Condition AREA 312 SQUARE MILES CHESAPEAKE BAY 98 SQUARE MILES WATERSHED SOUTHERN 209 SQUARE MILES WATERSHED.
Mason’s Stormwater Utility Program Kathleen Wade-Dorman, P.E. City of Mason.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
Watershed Stewardship Program Status of Marin County Public Works Watershed Program 11/7/08 11/7/08.
1 Financial management for water, sewer, and storm water systems Most financial management of water, sewer, and storm water systems takes place in a government.
Barriers to Implementing Energy Efficiency at Small and Rural Utilities Jennifer Anziano and Ryan Firestone August 19, 2015.
Pennsylvania’s newest tool… Stormwater Management Authorities.
Borrego Water District Revenue Workshop. Potential Revenue Sources  Background  Service Area Relatively Small  Largely Undeveloped  Absentee Owners.
UPDATE MassDEP REVIEW OF NPDES DELEGATION Prepared by Glenn Haas - Brown and Caldwell and Paul Hogan - Woodard & Curran NH WPCA Symposium June 13, 2013.
Watershed Monitoring *Background Watershed Stewardship Plan-2004 Gap Projects IRWMP-Dec Policies SFEI study-2007 Joint TC/WC meeting-June 2010 *Proposed.
County-Wide Act 167 Plan “County-wide Act 167 Stormwater Management Plan for Chester County, PA” was prepared by: Chester County Water Resources Authority.
DEPARTMENT OF UTILITIES RATE DEVELOPMENT PLANNING UPDATE Utility Rate Advisory Commission – July 23, 2014.
What is Stormwater? Direct result of rainfall Recharges groundwater by infiltration Produces “runoff” (excess rainfall after infiltration) May be concentrated.
© Amec Foster Wheeler Business Analysis for Canal Management Principles, Experience and Key Decision Points.
Virginia’s Brownfield Program - An Attitude of Success Presented by: Delegate Terrie Suit Member - Virginia House of Delegates 81st District & Chris Evans.
Los Angeles County Community Choice Aggregation Regional CCA Task Force Meeting October 28, 2015.
PUBLIC WORKS FY 2012 Proposed Budget May 24, 2012.
What are they and how are they calculated? May 2015.
1 Transportation Impact Fees and Street Maintenance Fees Presented to the City Council by the Planning and Development Department January 21, 2010.
Stormwater Utility City of Rowlett
Town of Melbourne Beach
Building a Phase III WIP for Wastewater, Stormwater & Septic Systems
Introduction to Environmental Impact Bonds
Presentation transcript:

Consensus-Building and Its Role in Successful Stormwater Utility Implementation Danny Bowden, City of Raleigh Scott McClelland, CDM Presented at: NC APWA Innovations in Water Resources & Stormwater Management September 27, 2004

Presentation Agenda u Drivers for the stormwater funding study u Role of the stakeholder group u Establishment of a utility for the City of Raleigh u Lessons learned and ongoing efforts

What Drove the Need to Perform a Stormwater Management Funding Study?

Consequences of Increased Uncontrolled Urbanization Time Stream Flow Rate With Urbanization Without Urbanization Greater & earlier peak discharge Greater runoff volume Smaller & less rapid peak Reduced baseflow Rapid conveyance of more pollutants

Impacts of Increased Runoff u Creates downstream flooding problems u Accelerates erosion and degradation of our streams u Carries pollutants into streams and rivers, impacting water quality

Did the City’s Stormwater Program Have Adequate Resources?

Previous Stormwater Management Program Budget and Staffing Levels

The City’s Existing Level of Service Operation & Maintenance – 5 staff members provided all maintenance for City’s stormwater program (making maintenance solely reactive) Capital Improvements – CIP was funded by a mix of City funds and grants. Program needs were prioritized to try and address the most critical needs Program Administration – City did a good job of planning, but lacked resources to update models for new conditions and to manage new CIP projects

Over 3,000 Stormwater Complaints Were Made By City Residents Since 1986 Less than 15% of those complaints had been addressed

City Drainage Basin Studies Had Identified Nearly $100 Million of CIP Needs

Federal and State Water Quality Regulations u NPDES Phase I & II Regulations u EPA/State 303(d) List u Nutrient sensitive waters (i.e. Neuse Rules) u Wetlands/401 Regulations u Federal Clean Water Act - TMDLs

What Questions Does This Raise??? u Are the City’s programs effective in achieving its goals? u Does the City have adequate staff to support its programs? u What role does the current funding play in making these goals more difficult to achieve? u Are the citizens satisfied with the City’s current level of service?

What Role Does a Stakeholders Group Play in the Process?

Financial, Technical, and Stakeholder Input Is Used to Develop Recommendations RECOMMENDATIONSRECOMMENDATIONS Collect and Evaluate Data Define Billing Methodology Determine Billing Units Establish Administrative Procedures F I N A N C I A L Identify Stormwater Needs Select Funding Methods Develop 5-yr Financial Plan Set User Fee T E C H N I C A L Appoint Citizen Committee Reviews Needs Committee Reviews Funding Methods Committee Reviews User Fee STAKEHOLDER INPUT

Project Approach Gave Every Member of the Process An Equal Vote Stakeholders Consensus- Based Results Old Approach Our Approach Stakeholders Project Sponsor

Stakeholder Group Workshop Process u Invite representatives with diverse opinions u Facilitate meetings to emphasize “fairness and equity” u Discuss program levels of service u Group/consultant presents results to Council

Invite a Diverse Group to Represent the Customers At-Large Stakeholders Group Stakeholders Group State and Local Government Citizen Action Groups Homeowners Associations Homeowners Associations Environmental Interests Commercial Business Interests Homebuilders Association Non-Profit Groups Schools and Universities

Case Study: City of Raleigh Stakeholders Group Consisted of 25 Members Office of State Construction Wake Co. Environmental Services North Carolina State University Meredith College Wake County School System Local High Schools (2) Crabtree Valley Mall Practicing Engineer Chamber of Commerce Office of State Construction Wake Co. Environmental Services North Carolina State University Meredith College Wake County School System Local High Schools (2) Crabtree Valley Mall Practicing Engineer Chamber of Commerce Homebuilders Associations Association of Realtors Environmental Group (3) Homeowners Association (2) Citizen Action Groups (2) Church Representative Apartment Management (2) Local Non-Profit Groups (2) Progress Energy Homebuilders Associations Association of Realtors Environmental Group (3) Homeowners Association (2) Citizen Action Groups (2) Church Representative Apartment Management (2) Local Non-Profit Groups (2) Progress Energy

Stakeholder Meeting Topics u Meeting #1 – Introduction, Expectations, & Schedule u Meeting #2 – Stormwater 101 & Program Level of Service u Meeting #3 – Existing Program Level of Service & Cost u Meeting #4 – Stakeholder Field Trip u Meeting #5 – Level of Service Improvements and Cost

Stakeholder Meeting Topics (con’t) u Meeting #6 – Future Level of Service Selection u Meeting #7 – Existing Funding Sources & Options u Meeting #8 – Program Rate Structures u Meeting #9 – Fee Adjustments & Credits u Meeting #10 – Stakeholder Recommendations

Stormwater Management Functional Areas u Stormwater Program Management u The planning and management of assets associated with stormwater u Operations and Maintenance u The management of stormwater assets to assure that the assets continue to operate at peak efficiency u Capital Improvements Project (CIP) u The construction of new assets that upgrade older portions of the stormwater system and that handle growth within the system

Stormwater Management Goals u Flood control u Water quality protection u Operation and maintenance u Regulatory compliance u Environmental protection u Long-term financing u Community acceptance Levels of Service

Developing a Level of Service

Stakeholder Group Field Trip u 15 stakeholders and 2 city council members visited 9 stormwater project sites u Sites were chosen to show examples of “the good, the bad, and the ugly” of stormwater management

City of Raleigh Stormwater Program Level of Service Matrix

Stormwater Utility Stakeholder Level of Service Voting Results

How Should We Pay For Our Stormwater Management Program?

Components of General Fund: Traditional Funding Has No Relationship to Stormwater Service

Funding Options for Stormwater Management u Taxes u Ad Valorem u Municipal Service Districts u Special Assessments u Sales Taxes (Local Government Sales & Use Taxes) u Utility or Public Service Enterprise Fees (User Fees) u Other Funding u Impact Fees u Grants u Loans/Bonds

Funding Capability of Each Funding Option

How Do They Compare in Some Key Areas?

A Stormwater Utility Charges a User Fee Based on Impacts to the Stormwater System PollutantsPollutants Water Runoff

Stormwater Utilities: New Concept? u First utility established in 1976 (Bellevue, WA) u Trend continued in the late 80’s/early 90’s in response to NPDES Phase I u Approximately 400 utilities exist today u Most larger communities in North Carolina are now funded by a stormwater utility Raleigh Charlotte Greensboro Winston-Salem Durham Fayetteville Wilmington Greenville Chapel Hill Washington Wilson High Point Rocky Mount

Benefits = Charge u Management of runoff benefits owners and tenants u Benefit relates to property’s contribution to the problem (runoff burden) u Fee relates to runoff u Common proxy for runoff is impervious area Customer receives services from the utility in direct measure to the runoff burden

Utility Fees Should Be Fair and Equitable Based on Service Needed u Water utility – volume used u Wastewater utility – volume generated u Solid waste program – volume/weight u Stormwater utility– runoff contribution

A Stormwater User Charge Is Typically Based on Impervious Surface

Comparison Between Ad Valorem and a Stormwater User Fee u Advantages u In place already u Easy to collect and administer (tax collector) u Can be sufficient for all services u Disadvantages u Not dedicated u Competition u Not equitable u Advantages u Equitable (i.e., fee related to service provided) u Stable & dedicated funding u Encourages good behavior u Sufficient for all services u Disadvantages u Startup costs u Administrative costs Ad Valorem Stormwater User Fee

City of Raleigh Stormwater Program Levels of Service & Annual Costs

Cost Comparison for the Typical Residential Home Owner u Tax rate needed for LOS B = $0.046 per $100 assessed value u For median home: u User rate needed for LOS B = $4.00 per month per SFU u For median home: $156,000/$100 x = $71.76/yr $4.00 x 12 = $48.00/yr Ad Valorem Stormwater User Fee

Outcome of City of Raleigh Stormwater Funding Study u Stakeholders broadly supported an increase in the City’s level of service u The group voted almost unanimously to fund the program with a utility u Stakeholders participated in the presentation to Council u Council approved the implementation of the utility in May 2003

Continuing Efforts and Lessons Learned

Keys To Establishing A Successful Stormwater Utility Program u Review and establish the current level of service of the program u Involve a stakeholders group to determine the desired level of service of the public at-large u Allow the stakeholders to choose the desired funding option u Utilize the stakeholder process to gain the support of the citizens and local government officials

Ongoing Efforts…. u Per the stakeholders’ recommendations, the City Council has also approved the following: u Stormwater Utility Fee Credit Manual u Approval of 10 additional stormwater staff u Establishment of a permanent, 10-member Stormwater Management Advisory Commission

Role of the Stormwater Management Advisory Commission u Recommends policy changes to council u Reviews and comments to council on the annual capital improvement program u Responds to council and staff for advice on stormwater utility matters u Presents council with an annual report of key actions and issues

Lessons Learned u Program and utility recommendations came from the stakeholder group and not city staff or council led to community support u Facilitation by consultant kept the stakeholders on task u Public education is a continual process and you can never do too much public education when implementing a stormwater utility u Coordination between key city departments is crucial to implementation – stormwater services/ billing/ GIS/ budget office

Lessons Learned u Look for the unknowns in billing systems and with the impervious data u Address Conflicts in Databases u Homeowners Associations/ Common Open Space Areas u Billing of HOA’s versus Individual Unit Owners u Billing of Tenants versus Owners u Semi-Impervious Surfaces

Lessons Learned u Customer Service u Provide it Efficiently and Promptly u Clearly Define Roles of Different Departments u Count on a Ten Fold Increase in Calls During the First Six Months of the Utility and Staff Accordingly Scott McClelland, CDM u Err on the Side of the Customer - Quote from Scott McClelland, CDM

Thank You For Your Time! Any Questions??