Highway 13 & Highway 101 Interchange Construction SP 7001-103 Savage, Scott County Municipal Consent Public Hearing December 7, 2009.

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia 1 Department of Transportation Bus Stop Improvement Program Fairfax County Department of Transportation Transit Services Division.
Advertisements

Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
State Aid Programs An Introduction to: Local Bridge Replacement Program Local Road Improvement.
Bob Vasek Cooperative Agreements Engineer Mn/DOT Metro State Aid Overview and Planning and Programming Tom Leibli Cooperative Agreements Project Manager.
State Aid Programs Legislative Issues - Bonding Local Bridge Replacement Program Local Road Improvement Township Sign Replacement Program.
General Update March Background As the region grows, increased travel demand on our aging Metro Highway System will continue to create additional.
1 Innovative Tools October 27, 2011 Chi Mai. 2 Presentation Overview VISSIM Corridors VISSIM Protocol Hours of Congestion.
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
DEL-71 Project at the US 36/SR37 Interchange Round Table Meeting Ferzan M. Ahmed, P.E.- District 6 Deputy Director Steve Fellenger, P.E. – Project Manager.
A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
MDOT University Region 10 county region 3 Transportation Service Centers (TSC) Jackson TSC Jackson County Jackson County Hillsdale County Hillsdale County.
Loading and Unloading Students
Ziehm Academy - User Guide for online registration portal Nuremberg, February 2009.
Alachua County Board of County Commissioners NW 16 th Avenue / NW 23 rd Avenue (NW 57 th Terrace to NW 13 th Street) Alachua County Public Works HDR Engineering.
Who we are these people? Gabriela Vega – Transportation Planner, DDOT/PPSA George Branyan – Pedestrian Program Coordinator, DDOT/PPSA Trey Dickerson –
1 Cathay Life Insurance Ltd. (Vietnam) 27/11/20091.
ODOT’s Public Involvement Process PI and the Project Development Process Minimum PI Requirements.
Great Western Corridor Feasibility Study
TH 13/101 Design-Build Project S.P October 30, 2009 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
TH 169 & I-494 Interchange Design-Build Project S.P January 27, 2010 Michael Beer, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
EFFICIENT TRANSPORTATION SOLUTIONS IN MINNESOTA A JOINT PRESENTATION TO THE Transportation Funding Advisory Committee September 14, 2012.
October 28 th, Hwy 97 – Carson to Fox Mountain Road Four Lanning  Review Project Scope Problem Definition Objectives  Summary of Work Completed.
Highway 61/147th Street Intersection Business Meeting April 20, 2010.
The Ohio Department of Transportation 1 I-280 Trench Project Public Meeting Monday, October 20, 2008 Ted Strickland, Ohio Governor James Beasley, P.E./P.S.
North Lamar Boulevard Project Neighborhood Meeting February 12, 2013 Alan C. Hughes, P.E. Austin Transportation Department.
Vault 9 Project Update 9 th September 2009 Paul Pointon – Site Project Delivery Manager LLW Repository Ltd.
GDOT’s Metro Atlanta Ramp Meters
BOTTLENECK STUDY UPDATE Pedro Orso-Delgado District Director District 11.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
What are “Pinch Points” PPinch Points are areas identified on the Highways Agency network of roads that experience high levels of congestion TThe.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
T.H. 23 / South Saratoga Street Reduced Conflict Intersection and Pedestrian Overpass Project Project hearing October 14, 2014 City Council Presenters.
Wiehle Ave. Traffic Concerns Created by Judy and Doug Pew.
Mecca Roundabout Project Mecca, CA September 28, 2011.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Interchange Design Wes Mayberry Transportation Engineering Intern
May 1, 2014 East Gude Drive Pedestrian Road Safety Audit Stakeholder Pedestrian Safety Meeting.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
April 18, 2013 Luke Lortie, EIT Jerry Auge, PE
Regional Transportation Committee (RTC) 10-Year Project Milestone Policy Transportation and Trinity River Project Committee October 26, 2015.
1 MnDOT Metro District Proposed Transportation Improvement Program (TIP) Amendment Metropolitan Council January 17, 2007.
US 25 Corbin to London Citizens Advisory Committee Meeting December 2011.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
Slower vehicle speeds (under 30 mph) means less severe crashes 90% reduction in fatalities, 76% reduction in injury crashes 75% fewer vehicle conflict.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
I-35W/Highway 62 Crosstown Commons Reconstruction Nathan Aul, Bob Krussow, and Michael Martin.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
Visit Our Website at: Click to edit Master title style.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
All About the County Road 22 Roundabout
The I-465 West Leg Reconstruction Project
Highway 169 Bridge Replacement & Pavement Resurfacing
I-69 Southwest/I-610 West Loop Interchange Reconstruction
Study Goals Analyze traffic operations along the corridor and at the two study interchanges Provide safety enhancements Improve multimodal performance.
Harbour Island Force Main Replacement
Metropolitan District | mndot.gov
Presentation transcript:

Highway 13 & Highway 101 Interchange Construction SP Savage, Scott County Municipal Consent Public Hearing December 7, 2009

2 Highway 13 Corridor Area Overview Howard Preston CH2MHill

Stakeholder Workshop December 6, 2006 December 7, 2009

Stakeholder Workshop December 6, 2006 December 7, 20094

Stakeholder Workshop Concepts and Preliminary Evaluation TH 13 Concept 1 Increase capacity of at-grade intersection with additional through and turn lanes TH 13 Concept 2 Roundabout TH 13 Concept 3 Grade-Separation Grade-Separation December 7, 20095

Stakeholder Findings Meeting January 10, 2007 December 7, 20096

7 Project Overview Lynn Clarkowski Mn/DOT Metro District — South Area Manager

December 7, Project Overview – Existing Conditions

Crash Data TH 13/TH 101 intersection was ranked #18 on the statewide-list of Top 200 Highest Crash Cost intersections (Mn/DOT crash data from ) TH 13/TH 101 intersection was ranked #18 on the statewide-list of Top 200 Highest Crash Cost intersections (Mn/DOT crash data from ) Crash cost/year = $1.2 million Crash cost/year = $1.2 million 106 crashes in Project area 106 crashes in Project area 75% of those crashes were rear-ends crashes 75% of those crashes were rear-ends crashes 33% of those crashes resulted in injury 33% of those crashes resulted in injury December 7,

10 Project Benefits Safety - It is anticipated that the project improvements will reduce number of crashes at the intersection by around 80%. Safety - It is anticipated that the project improvements will reduce number of crashes at the intersection by around 80%. Mobility - Currently, the TH 13 and TH 101 intersection has a capacity of 4,400 vehicles per hour. The project will more than double the capacity of the intersection. Mobility - Currently, the TH 13 and TH 101 intersection has a capacity of 4,400 vehicles per hour. The project will more than double the capacity of the intersection. Floodplain - Raise eastbound lanes of highway above the 100-year floodplain elevation. Floodplain - Raise eastbound lanes of highway above the 100-year floodplain elevation. Bus Shoulders - Widen outside shoulders in each direction to accommodate buses. Bus Shoulders - Widen outside shoulders in each direction to accommodate buses.

December 7, Highway 13 & Highway 101 Interchange Project Timeline 2007 Scott County applied for and received Federal Funding 2007 Scott County applied for and received Federal Funding (for fiscal year 2012) 2008 Mn/DOT started working on preliminary design 2008 Mn/DOT started working on preliminary design August 2008 Open House August 2008 Open House Met Council Approval for scope change (leaves 126 th St signal in place) Met Council Approval for scope change (leaves 126 th St signal in place) December 2008 Informational Meeting December 2008 Informational Meeting February 2009 Council Meeting February 2009 Council Meeting September 2009 project accelerated using American Recovery Reinvestment Act (ARRA) funding September 2009 project accelerated using American Recovery Reinvestment Act (ARRA) funding 2010 construction 2010 construction

December 7, Highway 13 & Highway 101 Interchange Project Funding $7.84 million in Federal Surface Transportation Program funding (accelerated to 2010) $7.84 million in Federal Surface Transportation Program funding (accelerated to 2010) $2 million in Scott County wheelage tax (match for Federal funding) $2 million in Scott County wheelage tax (match for Federal funding) $885,000 in State Safety Capacity funding (accelerated to 2010) $885,000 in State Safety Capacity funding (accelerated to 2010) Around $5 million in ARRA funding Around $5 million in ARRA funding

December 7, Project Overview – Proposed Conditions Bridge eastbound Highway 13/Highway 101 Bridge eastbound Highway 13/Highway 101 (bridge is longer than initially proposed) Raise eastbound lanes above 100-year floodplain elevation Raise eastbound lanes above 100-year floodplain elevation Ramp construction Ramp construction Signalize lefts on and off westbound Signalize lefts on and off westbound Highway 13/Highway 101 Access closures/modifications Access closures/modifications Leave Highway 13/126 th St signal, but add pedestrian crossings Leave Highway 13/126 th St signal, but add pedestrian crossings

December 7, December 7, Access Closures/Modifications Highway 13 and Louisiana Avenue Highway 13 and Louisiana Avenue –From a full access, uncontrolled intersection –To full closure Highway 13 and Rhode Island Avenue Highway 13 and Rhode Island Avenue –From a right-in/right-out –To full closure Highway 101 and Zinran Avenue Highway 101 and Zinran Avenue –From a ¾ intersection –To right-in only

December 7, December 7,

16 December 7, Frequently Asked Questions Why didn’t Mn/DOT consider a design that eliminated the need for any signalized intersection, with access to TH 13 via ramps only? Would require grade separation of two bridges (a bridge over the eastbound bridge or two ramp bridges) Would require grade separation of two bridges (a bridge over the eastbound bridge or two ramp bridges) Grades would necessitate a change of access at Highway 13 and 126 th St Grades would necessitate a change of access at Highway 13 and 126 th St Many ramps are signalized at interchanges Many ramps are signalized at interchanges

December 7, December 7, Frequently Asked Questions The design still requires a weave to enter TH 169 northbound, vehicles will need to cross two lanes of full speed traffic, can the weave be eliminated? Would require a westbound bridge Would require a westbound bridge Balancing benefits and cost Balancing benefits and cost Weaving distances meet standards Weaving distances meet standards Looking to improve northbound TH 169 entrance ramp capacity during AM peak period Looking to improve northbound TH 169 entrance ramp capacity during AM peak period

December 7, December 7, Frequently Asked Questions Will this project really help traffic flow in the morning if no improvements are made to TH 169 northbound? Improvements made in stages Improvements made in stages I-494/TH 169 project I-494/TH 169 project Northbound TH 169 weave to Old Shakopee Rd exit ramp Northbound TH 169 weave to Old Shakopee Rd exit ramp Non-peak benefits Non-peak benefits

December 7, December 7, Frequently Asked Questions Can the access at Zinran Avenue be moved to the west to allow a right-out onto TH 13? If so, how far would it have to be moved? Corridor vision and access management Corridor vision and access management Intersection influence area Intersection influence area For weaving at Zinran Ave, 1500 feet minimum and 2000 feet desirable For weaving at Zinran Ave, 1500 feet minimum and 2000 feet desirable Only 200 feet from Zinran Ave to exit ramp Only 200 feet from Zinran Ave to exit ramp Eastbound grade rising for bridge Eastbound grade rising for bridge

December 7, December 7, Frequently Asked Questions If a right-out access onto TH 13 at Zinran Avenue cannot remain, can a right-out on the TH 13 southbound turn lane be designed? Intersection influence area Intersection influence area Speed differentials of high-speed deceleration Speed differentials of high-speed deceleration and low-speed acceleration Would need to weave on southbound TH 13 Would need to weave on southbound TH 13 to make U-turn at 126 th St signal

December 7, December 7, Frequently Asked Questions Can a right-in and/or right-out at Louisiana Ave be allowed until a traffic signal is installed at Dakota Avenue? Corridor vision and access management Corridor vision and access management Intersection influence area Intersection influence area Traffic on entrance ramp is accelerating, watching mainline traffic and preparing to merge Traffic on entrance ramp is accelerating, watching mainline traffic and preparing to merge Entrance ramp merge area to main line is at Louisiana Ave (no room for the 1500 – 2000 feet weave and a 500-foot turn lane for the right-in or the 1000 feet minimum – 1500 feet desirable for the right-out) Entrance ramp merge area to main line is at Louisiana Ave (no room for the 1500 – 2000 feet weave and a 500-foot turn lane for the right-in or the 1000 feet minimum – 1500 feet desirable for the right-out)

December 7, December 7, Frequently Asked Questions The local streets will take more traffic as a result of the access closures, does Mn/DOT have funding to offset any expected costs related to the local roadways? The City may use State Aid funding on designated Municipal State Aid Streets The City may use State Aid funding on designated Municipal State Aid Streets –Zinran Ave –126 th St

December 7, December 7, Frequently Asked Questions Will business signage be allowed that can direct traffic to the local businesses after construction is completed? During construction? Engineering Standards Engineering Standards Mn/DOT Policy Mn/DOT Policy Mitigation for construction impacts on businesses Mitigation for construction impacts on businesses

December 7, Project Construction and the Design-Build Process Michael Beer Mn/DOT Metro District — Eden Prairie Construction Resident Engineer

December 7, Design-Build Process Design-build is a contracting process that brings designers and contractors together early in the detail design portion of a project. The owner clearly defines the standards and general specifications they expect for a project, and the design-build team works together to satisfy those requirements. Design-build is a contracting process that brings designers and contractors together early in the detail design portion of a project. The owner clearly defines the standards and general specifications they expect for a project, and the design-build team works together to satisfy those requirements

December 7, December 7, Project Construction Design flexibility Design flexibility Traffic control during construction Traffic control during construction City involvement City involvement Business Liaison Contact Business Liaison Contact Construction coordination with other Construction coordination with other projects in the area

December 7, Current Project Schedule Request for Letters of Interest Request for Letters of Interest –Posted October 13, 2009 Request for Qualifications Request for Qualifications –Posted November 13, 2009 Request for Proposals – late-January Request for Proposals – late-January Construction Start – May 2010 Construction Start – May 2010 Construction Completion – end of 2010 Construction Completion – end of 2010

December 7, Contacts Web site: Web site: Michael Beer, Eden Prairie Construction Resident Engineer Michael Beer, Eden Prairie Construction Resident Engineer Mn/DOT Metro District (952/ ) Lynn Clarkowski, South Area Manager Lynn Clarkowski, South Area Manager Mn/DOT Metro District (651/ ) John Powell, Public Works Director John Powell, Public Works Director City of Savage (952/ )

Questions and Discussion