Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.

Slides:



Advertisements
Similar presentations
CM/CG Contracting Tom Ravn, Mn/DOT Director, Office of Construction and Innovative Contracting.
Advertisements

? Design/Build What do consultants think?. A piece of the puzzle D/B/O/FD/B/BC/M D/B/ODesign/BuildPM D/B/O/MOthers.
Solving Challenges Others Cannot Statutory Frameworks for Public Private Partnerships HMFA Lone Star Chapter 2009 Winter Institute Dallas, TX Christopher.
Organization of Primary Entities
ASARECA Procurement guidelines Goods and Works. PROCUREMENT OF GOODS By P rocurement and C ontracting Officer ITAZA MUHIIRWA.
Fixed price contract: A contract that provides a price for each procurement item obtained under the contract.
OUTSOURCING INDUSTRIAL WASTEWATER TREATMENT Jerzy Kołłajtis – Magda Trybuch –
Design-Build: RISKS OR REWARDS for the Consulting Engineer?
Design/Build Solutions to your construction projects, large and small.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
TH 55 Mill and Overlay Design-Build Project S.P
Project Delivery Methods. Traditional Owner Design/ Design/Bid/Construction Selection Build Owner’s Vision Owner’s Vision Owner’s Vision Complete Design.
1 Opportunities Related to EPC Initiatives Support Services Management - NWC.
Your Presenters Lisa Dal Gallo Dave Kirn Regional Executive/Justice Market Leader Partner, LEED AP
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
4 th ANNUAL JOINT CSU/UC PSSOA CONFERENCE March 25-26, 2003 “Emerging Construction Methodologies in CSU – What Public Works Contract Specialists Should.
Utah’s Use of CMGC & Project Delivery
10 miles on I-80 from Robb Dr. to Vista Blvd. Reconstruction through congested downtown Installation of new 10-mile ITS system Preserved Operational Capacity.
Alternative Project Delivery
Lunchtime Topics Craig Weise Construction Reform Program Director Lisa Conomy Construction Counsel OSU Office of Legal Affairs.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
Facilities & Capital Construction Program Overview Program Overview Project & Scope Schedule Alternative & Traditional Procedure Approaches E-Builder.
Innovative Contracting Construction Management Association of America Seminar May 17, 2013 California Department of Transportation.
1 BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Procurement Methodology David Dale NLSL II Procurement Manager.
Facilities Institute July , 2012 Houston, Texas Click to edit Master title style
Facilities and Construction: Did you know your GPO can help?
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
PROJECT DELIVERY SYSTEMS
Delivery Methods  The Players from Handbook of Architectural Practice, Chapter 9.1 by Phillip Bernstein FAIA  Variables from Handbook of Architectural.
PROCEDURES FOR SELECTING THE CONTRACTOR
Model Procurement Documents for Architectural Services [NAME] [PLACE] [DATE]
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Solving Challenges Others Cannot Virginia’s Public Private Partnership Law Toyo University Tokyo, Japan Christopher D. Lloyd September 29, 2008.
TH 2 – Wilton Bridge Replacement Design-Build Project S.P March 5, 2009 Todd Vonasek, P.E. Mn/DOT Project Manager PROJECT INFORMATIONAL MEETING.
Developing and Issuing the RFP. Why should qualifications be your procurement focus? n Having the necessary range of capabilities is more important than.
January 24, …a delivery method which entails a commitment by the Construction Manager to deliver the project within a Guaranteed Maximum Price (GMP).
1 Essa G. Al-Ansari 2nd PMI AGC Energy Forum DMS Debates DMS Debates Project owners should increasingly adopt the Cost Plus Model over LSTK.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
Solving Challenges Others Cannot Statutory Frameworks for Public Private Partnerships NCPPP/AGC Conference Phoenix, AZ Christopher D. Lloyd January 27,
Do you have what it takes to win the next P3 or D-B Project? Steven Kramer, PE Vice President Jacobs.
Presented By: Jeffrey T. Folden, P.E. Assistant Chief, Innovative Contracting Division.
Project Procurement Management
Contractor Alternate Design Serving the Public’s Best Interest.
Network of Procurement Professionals Friday 13 November 2015 “Capturing a Tender Offer in the Contract” Brett Kahland, Senior Commercial & Contracts Specialist.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
1. Design-Build is a project delivery process in which the design and construction phases of a project are combined in a single contract. The consultant.
Richland Creek Water Supply Program Contract for WTP and Pump Stations CMAR Services and Program Update Paulding County, Georgia Board of Commission Work.
Construction Management At Risk Process
SEWER TRUNK LINE REHABILITATION PROJECT (Alexandria Place, Black Oak and Navy Drive) COUNCIL AGENDA ITEM 14.1.
Interstate 270 Innovative Congestion Management Progressive Design-Build Contract.
Selection Criteria and Invitational Priorities School Leadership Program U.S. Department of Education 2005.
English for Construction Engineering Management ,建筑工 程专业英语 赖小东 授课教师:赖小东 Cell# 江西财经大学旅游与城市管理学院工程管理系.
2016 SAME Small Business Conference - Atlanta
AWWA IMS Leadership Forum Project Delivery Systems
Lease-Leaseback Project Delivery Method
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
CIFA 2016 Workshop Performance Based Infrastructure
CM at Risk v. Design-Bid-Build
PROJECT DELIVERY METHODS
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Ch 11 - Procurement Management Learning Objectives
Developing and Issuing the RFP
Alternative Project Delivery: Lessons Learned and Yet to be Learned
Request for Proposal & Proposal
Project Delivery Systems
Design-Build Process Utilizing Negotiated Selection
PROJECT DELIVERY METHODS
Design-Build Acquisition and Contract Incentives July 19, 2018
Design-Build Acquisition and Contract Incentives May 9, 2019
DESIGN-BUILD PROGRAM OVERVIEW
Presentation transcript:

Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee

Project Delivery Options Discussion Topics Why consider alternate forms of project delivery? Spectrum of available delivery options defined Project characteristics that favor specific delivery options

Traditional Design-Bid-Build Only Delivery Approach Formerly Allowed for Public Utilities Where traditional approaches are not required by legislation, alternative delivery approaches are often used to deliver major new construction Alternate forms of project delivery commonly used for construction ranging from residential housing to industrial processing plants and power generating facilities Minnesota state statutes specifically allow alternate delivery approaches for wastewater collection and treatment facilities

Drivers for Using Design-Build Schedule (by far the most common reason) –Regulatory compliance –Population growth –Derailed or otherwise delayed project Need for innovation/potential cost savings –Industry input on treatment process/technical solutions –Challenging problems that invite competitive solutions Avoiding low bid quality –Bad experience with poor quality contractors –Looking for a procurement method to select contractors on qualifications –Can be done with Design-Bid-Build also, but more difficult to implement Risk transfer, single point of responsibility –Specify the results, but not the way to get there –Design-Build-Operate most comprehensive risk transfer approach

Basic Project Delivery Options Design-Bid-Build (DBB) Lump Sum Design-Build (LS) Traditional Delivery Design-Build or “Alternate” Delivery

Design-Bid-Build Procurement Defined, proven process Distinct milestones to ensure expected results Project components defined in detail Traditional “cast” of participants Plan Project Procure Engineering/ Design Consultant -selection based on qualifications, technical approach Engineering/Design Review/Approve Design Bid Construction Project -selection based on price (with exceptions) Construction OversightOperate Construction Services ConstructionWarranty Startup Owner Consulting Engineer General Contractor

Lump Sum Design-Build Procurement Many “flavors” - two-phase procurement most common Variable milestones depending on the project Performance requirements defined in detail Somewhat different “cast” of participants Design, Build, Startup Verify DesignOperations Warranty Project Support Plan Project Solicit qualified teams -short list qualifications based on capability, capacity, experience, references Design Concept/RFP Review Quals Select short list and Issue RFP- defines performance criteria Proposal Period Select from short- listed teams -selection based on “best value” (technical + price) Preliminary Design RFP Clarifications Owner Owner’s Advisor Design- Builder Quals

Key Comparisons Between Traditional and Design-Build Approaches Traditional Design-Bid-Build Owner controls most aspects of design detail... discrepancies become change orders Multiple procurements Quals for engineers, price for contractors Multiple contracts/points of contact among designers, contractors Design-Build Owner controls performance criteria, but not design detail...and is not responsible for discrepancies One procurement, many phases Qualifications, then combination of technical and price (“best value”) Single contract/single point of accountability

Key Comparisons Between Traditional and Design-Build Approaches Traditional Design-Bid-Build Standardized selection process Specifications-based requirements Others? – Collaboration - limited to design period – Innovation – design function – Schedule - constrained – Price – low bid – Quality – not typically a factor in contractor selection Design-Build Each procurement unique Performance-based requirements Others? – Collaboration – can include Contractor – Innovation – team function – Schedule - potentially faster – Price – “best value” proposition – Quality – typically part of selection criteria

Expanded Project Delivery Options Design-Bid-Build (DBB) Construction Management at Risk Lump Sum Design-Build (LS) “Progressive” Design-Build (GMP) Design-Build- Operate (DBO) Traditional Delivery Design-Build or “Alternate” Delivery “Design-Build Lite” Early involvement by Contractor during design Maximum opportunity to collaborate on design Owners have an “off-ramp” if they don’t agree with GMP Cost guarantee extends to operations Comprehensive risk transfer Option for Owner to operate

What Types of Projects Fit the Design-Build Model? Numerous variations, continuously evolving Variable milestones depending on the project Manages to unknown challenges through risk allocation Design, Build, Startup Verify DesignOperations Warranty Project Support Plan Project Solicit qualified teams -short list based on capability, capacity, experience, references Design Concept/RFP Review Quals Issue RFP- defines performance criteria; variable level of design Proposal Period Select from short- listed teams -selection based on “best value” (technical + price) Preliminary Design RFP Clarifications Issue: Schedule How can the procurement process be varied if schedule is critical? Issue: Schedule How can the procurement process be varied if schedule is critical? Issue: Design Effort How much pre- design is required to ensure you get what you want (versus performance specifications)? Issue: Design Effort How much pre- design is required to ensure you get what you want (versus performance specifications)? Issue: Selection Criteria What criteria are important to success? What’s the best indicator of future performance? Issue: Selection Criteria What criteria are important to success? What’s the best indicator of future performance? Issue: Price How do you evaluate proposals beyond price? Does low price always win? Issue: Price How do you evaluate proposals beyond price? Does low price always win? Issue: Design Approvals How much oversight of design should you have? Issue: Design Approvals How much oversight of design should you have? Issue: Risk Sharing How are risks best shared? Issue: Risk Sharing How are risks best shared? Issue: Quality How do you ensure quality? Issue: Quality How do you ensure quality? Issue: Scope What elements of the projects should be DB versus traditional delivery? Issue: Scope What elements of the projects should be DB versus traditional delivery?

Issue: Schedule How can the procurement process be varied if schedule is critical? Issue: Schedule How can the procurement process be varied if schedule is critical? Issue: Design Effort How much pre- design is required to ensure you get what you want (versus performance specifications)? Issue: Design Effort How much pre- design is required to ensure you get what you want (versus performance specifications)? Issue: Selection Criteria What criteria are important to success? What’s the best indicator of future performance? Issue: Selection Criteria What criteria are important to success? What’s the best indicator of future performance? Issue: Price How do you evaluate proposals beyond price? Does low price always win? Issue: Price How do you evaluate proposals beyond price? Does low price always win? Issue: Design Approvals How much oversight of design should you have? Issue: Design Approvals How much oversight of design should you have? Issue: Risk Sharing How are risks best shared? Issue: Risk Sharing How are risks best shared? Issue: Quality How do you ensure quality? Issue: Quality How do you ensure quality? Issue: Scope What elements of the projects should be DB versus traditional delivery? Issue: Scope What elements of the projects should be DB versus traditional delivery? Issues: Schedule How can the procurement process be varied if schedule is critical? Selection Criteria What criteria are important to success? What’s the best indicator of future performance? Design Effort How much pre-design is required to ensure you get what you want (versus performance specifications)? Price How do you evaluate proposals beyond price? Does low price always win? Scope What elements of the projects should be DB versus traditional delivery? Design Approvals How much oversight of design should you have? Risk Sharing How are risks best shared? Quality How do you ensure quality? The Challenge: Match Delivery Approach to Owner Needs and Preferences Control/Risk Allocation Cost/Competition Time Quality/Innovation

Best Delivery Option is Project Specific Interceptors –New sewers highly dependent on land acquisition – traditional approach often works best –Sewer rehabilitation or replacement does not involve land issues – good opportunity for D/B Treatment Plants –Greenfield process or new plants offer opportunity for process innovation, operating cost considerations – D/B or D/B/O could be good choice –Plant rehab or expansion that requires close coordination with existing processes – traditional approach usually best. Also consider the capacity and capability of the local marketplace

Questions?