Miscellaneous MOT issues

Slides:



Advertisements
Similar presentations
Welcome to Mrs. Vera’s Drivers Ed. Chapter 2 Review
Advertisements

1 Community Right to Know Electronic Reporting Bruce Boyd Tina Gutierrez & Latoshia Parker Office of Pollution Prevention and Right to Know.
Office of Traffic, Safety, and Operations June 20, 2012 Arden Hills Training Center Signing Plan Design At-Grade.
MATERIALS ACCEPTANCE. LPA Construction chapter -2 paragraphs on -Materials Quality Control -Materials Finalization -andAppendix J -LPA materials acceptance.
Erosion & Sediment Control in Florida Construction
FDOT’s Motorist Awareness System
Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
Procurement Card Presented By: Denise Matias, CAH March 20, 2013.
FIELDMANAGER IOWA STYLE!!. IOWA D.O.T. RCE Office FieldManager Set-Up TS1 Line to Ames Communication Between RCE Office and Project Inspection Staff.
Contracting with WYDOT
American Recovery and Reinvestment Plan District Six Economic Stimulus Information Meeting FDOT ROADWAY MAINTENANCE AND CONSTRUCTION PROJECTS – PROCURED.
D11 - ENGINEERING DIVISION. VISIBILTY DURABILITY COST.
M3 - 1 The Road to Skilled Driving April 2006 Chapter 2 Signs, Signals and Roadway Markings.
2015 VDOT – VAA Asphalt Seminar March 12, 2015 | Blacksburg, VA Work Zone Safety Mike Sharkady, ATCS, PLC. Senior WZ Safety Coordinator VDOT Southwest.
2008 Mid-States Highway–Rail Grade Crossing Safety Conference May 20, 2008 David Peterson.
February 26, 2015 | Fredericksburg, VA Work Zone Safety
SW Region Construction Conference February 19 th 2014 Joe Schneider – Work Zone Engineer Traffic Section – SW Region La Crosse Office.
FINAL ESTIMATES ISSUES
Maintenance of Traffic (MOT)
ODOT Pavement Marking Design
Welcome to Inspecting Maintenance of Traffic Items on Projects
Melissa Hollis Basis of Estimates Coordinator Engineering Systems Support Section State Specifications and Estimates Office October 2014.
Signals, Signs, and Road Markings Sophomore Driver Education.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
Office of Traffic, Safety and Technology Chapter 7 Signing Plan Sets Traffic Signs 101 November 20, 2014.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
Acceptance Process for Manufactured Products by Certification: A users guide for implementation of Materials Bulletin No. MB 06-02, DCE Memorandum No.
MATERIALS ON HAND Standard Specification allows for payment of materials on hand (MOH) upon contractor’s written request. See page 91 of the 2014.
October 1, 2014 David Rush Work Zone Safety Program Manager, Traffic Engineering Division 2014 Work Zone Safety Team Reviews.
Office of Traffic, Safety and Technology Chapter 2 Signing Overview Traffic Signs 101 November 20, 2014.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
ESTIMATES UPDATE TRAINING BULLETINS FOR 2013 Melissa Hollis, Basis of Estimates Coordinator August 1, 2013 webinar.
Performance Specifications T. E. A. M. St. Louis Presentation October 8, 2004.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
NC Region Speakers:. Now What?  EBS  Pothole  Vac Truck  T & M  Force Account  Con Mod/Change Order  LCS  QMP (QC, QV, IA)  QC  QV  IA Excavation.
Traffic Control Devices, Traffic Laws, Signs, Signals and Markings.
Ronnarit Chaiyo-saeng Procurement Officer Mekong Institute.
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT November 19, 2013.
IDM Chapter 104 Utility Coordination Gail Lee Utility and Railroad Engineer, INDOT June 10, 2015.
Office of Traffic, Safety and Technology Module 5 Work Zone Plan Sets Module 5 Work Zone Plan Sets Traffic Control Plan Development Course.
SW Region Construction Conference February 19 th 2015 Jim Romanowski – Work Zone Engineer Traffic Section – SW Region Madison Office.
REVISED May 2009STATE MATERIALS OFFICE Goals in this Session To understand:  The Sampling & Testing process  The Project Certification process  The.
Trivia Certification Program Trivia Mark Foster ODOT Region 1 Liaison and Federal Aid Specialist March 12, 2010.
Road Ranger / TMC Operator Joint Training Module 101 MODULE 10 MODULE 10 Road Ranger Work Zones.
Basis of Estimates Part 1 Introduction Melissa Hollis Engineering Systems Support State Specifications and Estimates Office June 2012.
Public Safety Committee September 28, 2015 David O. Brown Chief Of Police Pedestrian Safety.
Tracy Lovell, PE HSIP PROJECT PROCESS. HSIP Process  Identify the location – RD Corridor, Emphasis Area, etc.  Conduct Road Safety Audit with multi-disciplinary.
CONTRACTING Erica Kreger
CHAPTER 10 TRAFFIC SIGNALS AND PAVEMENT MARKINGS.
Construction zones and traffic control Objective Review extent of problem Identify contractor responsibilites Identify control plan components.
Training Safety Tip Cone Placement – Advanced Warning.
Ezzeldin Benghuzzi, P.E UPDATE TRAINING Contact Information: Ezzeldin Benghuzzi, P.E ezzeldin. Contact Information:
Design Standards 1 Marshall Douberley 2012 UPDATE TRAINING Contact Information: Marshall Douberley Earl.
Work Zone Safety Virginia Work Area Protection Manual International Municipal Signal Association March 8, 2016 Paul Kelley & Ginger Quinn WZ Safety Coordinators.
PROJECT DEATH Stephanie Rich. Corrective Work Punch List Punch List Work Complete Date Work Complete Date Request Final(s) Request Final(s) Comprehensive.
New MUTCD Requirements for Operations
Safety Colors Quiz.
ACA – Fall Conference FAA AIP Grants Management
Signs, Signals, Markings & Speed Limits
Traffic Signals and Pavement Markings
Review of Revised SP 150 – Traffic Control Dated February 01, 2017
Montclair State University Affirmative Action Requirements
Traffic Control Plan Development Course
Acceptance Process for Manufactured Products by Certification:
Traffic Operations Division
Creating a Manually- Entered Pay Estimate
Administrator of Construction Todd Wilson Senior Project Manager
Signs, Signals and Roadway Markings
Safety Colors Quiz.
MODULE 10 Road Ranger Work Zones
Presentation transcript:

Miscellaneous MOT issues Presented by: Stefanie D. Maxwell, P.E. FDOT Central Office Construction August 25, 2006

Critical Requirements MOT Process Reviews Review Districts every other year Concurrence with Guidelists and Critical Requirements Critical Requirements

MOT Process Reviews (cont’d) Test pavement markings Retroreflectivity color

Pavement Marking - Paint Retroreflectivity Requirements Effective January 2006 300 white 250 yellow Contractor to submit at any time but FDOT has 3 days from receipt to verify, if necessary Training is coming

MOT Process Reviews (cont’d) Test work zone sign sheeting Retroreflectivity color

Qualified Products List Pavement Markings – Paint, Thermo, RPMs, etc. Traffic Control Devices – Barricades, Drums, Warning Lights, CMS, etc.

QPL Alleged Deficiency Form # 630-020-01

High Visibility Safety Apparel FDOT DS Index 600 – July 2006

Portable Work zone sign supports FDOT Design Standards Index 600 QPL Website: Portable sign stand http://www.dot.state.fl.us/specificationsoffice/qplnew/Items/Portable%20Sign%20Stand.htm

Documentation required for LS items or LS jobs NONE No station to station No daily worksheets No certification of quantities Submit request for payment on invoice See Prep & Doc Manual, Chapter 11.9.3 Retroreflectivity certification is required

Put copy of Retroreflectivity form here http://www.dot.state.fl.us/construction/formsonl/Forms_on.htm Put copy of Retroreflectivity form here This is what the retroreflectivity form looks like. You can find this on the Construction Office website at this address.

Questions? Contact Stefanie D. Maxwell, P.E. stefanie.maxwell@dot.state.fl.us (850) 414-4314 Stefanie’s Hwy Next Exit In summary, reflectivity applies to ALL painted pavement markings, regardless of the surface, work zone and final surface. CLICK Section 102 and section 710 is where you find reflectivity requirements. CLICK Since most everyone is using a 30 meter geometry instrument, the retroreflectivity requirements are 250 for white and 175 for yellow. CLICK