Eastchester Union Free School District Pre-Bond Planning 2007-2008 Presenter: Marilyn Terranova, Ph.D. – Superintendent of Schools.

Slides:



Advertisements
Similar presentations
Site Plan Turner, Hickey and Associates 1st Level Floor Plan Administration 6 th Grade 7 th Grade 8 th Grade Special Classrooms Teacher Lounge Multi Purpose.
Advertisements

St. Andrews School A tour of St. Andrews. This is the Nursery This is the Nursery and it is behind Walmsley House. Children start in Nursery at 3 and.
1 Building Use Study Plattsburgh City School District Advisory Committee Meeting September 18, 2013 Castallo and Silky- Education Consultants Bill Silky.
Bronze Award: Library/Media Center
SOUTHERN UNIVERSITY at NEW ORLEANS Today, Tomorrow, and Beyond! How the Campus Will Look, and When Southern University at New Orleans Master Programming.
June 8, 2011 Irvine Unified School District. What is a Modernization? Eligibility Permanent buildings - 25 years old Portable buildings - 20 years old.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
April 14, 2009 Los Angeles Valley College Prop J Master Plan Town Hall Presentation.
“Children First!” ENCINITAS UNION SCHOOL DISTRICT “Children First!” PROPOSITION P.
Design Review Planning to date Project scope summary
Bond Construction Update Citizen’s Oversight Committee Long Beach Community College District October 2008 EDUCATE  ENGAGE  EMPOWER 1.
NEW PALTZ CENTRAL SCHOOL DISTRICT Comprehensive Facilities Master Plan – Progress Report Summary.
N EXISTING FACILITIES BUILDING “A” -Principal’s Office -Workroom -(9) 3 RD Grade Classrooms - (4) 4 TH Grade Classrooms -Life Skills Classroom -Title.
School District Merger Study Crown Point Central School and Ticonderoga Central School Facilities April 17, 2013 Castallo and Silky Education Consultants.
Remsenburg – Speonk Union Free School District Elementary School Bond Planning Presentation October 12, 2010 BBS Architects and Engineers and Triton Construction.
Center Grove High School Addition & Remodeling Schematic Design Phase Faculty Presentation August 27, 2008.
Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School.
Glenvar High School Renovations School Board Presentation
Institutional Services Human Resources Facilities Maintenance Custodian Services Security Construction Wilmington Campus North Campus.
NOTE: REFERENCE PROJECT MANUAL DATED 01/04/13 FOR THE BALANCE OF PROJECT REQUIREMENTS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 01/04/13.
Jim Ned CISD School Bond Election May 8 th, 2010.
Tuesday, October 2, 2012 MSS Room #1.  The Leadership Team has not had a formal discussion about HSD facilities.  Individual discussions have taken.
Central Cambria School District Jackson Elementary was built in 1967 and renovated in There are 261 students in Pre-K through grade 5 and we offer.
Community Update James Simons School – October 2,
Building for the Future Grinnell-Newburg School District Your Community. Your Schools.
NEW HIGH SCHOOL BACKGROUND In March of 2000, the Milan community voters passed a $49,915,000 bond issue. The bond provided dollars for a new high school;
Archdiocese of Boston Brockton Regional Proposal Presentation to Parents, Teachers & Staff January 28, 2007.
Building Work Committee Renovation & Expansion Project Presentation March 7, 2009 Mason School District.
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE.
ADDITION & REMODEL Eugene Field Elementary School.
School Opening Readiness Highlights Report of the Superintendent August 20, 2015 Superintendent Evaluation Rubric Standard I, Indicator I-B,
Jan 31, 2005 Community Update. Jan 31, 2005 Thanks to the voters… Measure R passed with over 63% of the vote $3.87 billion for “the Safe and Healthy Neighborhood.
IT'S BY FAITH Building Project will cater to long felt needs of Indiranagar Methodist Church, Bangalore. Following were the needs 1. Sunday School Assembly.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
Saint Croix Central Task Force Findings May 2, 2012.
Design Development Review
Spencer High School – School Network The Muscogee County School District utilizes a wide area network (WAN) with all school connecting to a data center.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
2 nd phase I.Classrooms, toilets, dinning hall, computer rooms and library for the primary students II.Expansion of the high school library and relocate.
New Parent Orientation September 3,  497 Students in grades K-5  3-4 Teachers per grade level  Active Parent Teacher Organization.
Network Assignment N. Stewart- MEDT 7477 The school used for the networking mapping assignment is Madras Middle School. Madras Middle School is located.
West Contra Costa Unified School District Long-Range Facilities Master Plan West Contra Costa Unified School District Long-Range Facilities Master Plan.
Willard and DiLoreto Hall Renovation and Addition
Kasson City Council Public Hearing Capital Improvements Plan October 26, 2005.
District Local Planning Committee Orientation Part 2 Trimble County Schools Kentucky Department of Education Division of District Support - District Facilities.
District of Columbia Public Schools | 1200 First Street, NE | Washington, DC | T | F | Murch.
Wahoo Public School District Facility Planning Update April 18, 2016.
SCHOOL #1 BALLOT QUESTION AND PROPOSAL Fall, 2016.
Facilities Focus Group
Windsor C-1 School District Planning 2017
Cambrian School District March 19, 2015
Cornwall Central School District
UPDATE: 8/8/2011 Batavia City School District
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Kodiak Island Borough School District Kodiak High School Masterplan
School #1 Ballot Question and Proposal
Relevant Questions… How did we get to this point? Why do we need this?
Facilities Update November 17, 2017
Building Capacities.
Vice President, Facilities & Capital Projects
Computer Science in the Early Years
Woodbridge Middle School Renovation Referendum
Ross St Elementary School Referendum
2007 Bond Issue Capital Improvement Program
Here is our Middle School
BY HERBER.
Woodbridge Middle School Renovation Referendum
Chimacum District Facility & Program Plan
Model presentation How to do it.
EAST PENNSBORO AREA SCHOOL DISTRICT
Presentation transcript:

Eastchester Union Free School District Pre-Bond Planning Presenter: Marilyn Terranova, Ph.D. – Superintendent of Schools

Lower Level First Floor Second Floor Third Floor

Eastchester Union Free School District Proposition One First Floor Middle School & High School

High School

Shared Wing

Middle School

Eastchester Union Free School District Proposition One First Floor Highlights

Old Gymnasium Revovated to New Cafeteria Capacity 260+

Commons: Meeting space for student clubs during lunch hours Small group instruction space during instructional time

Other school uses: Study halls Small group instruction Community uses: Holding large scale events that can be catered General community meetings

First floor of the Eastchester High School to replace the footprint of the existing cafeteria

1 st Floor Middle School

Eastchester Union Free School District Proposition One Second Floor Middle School & High School

High School

Shared Wing

Middle School

Eastchester Union Free School District Proposition One Second Floor Highlights

Mezzanine to High School Cafeteria Current old gymnasium

School uses: Additional eating area for students Meeting lunch space for staff Small group instruction Drop in study center Wireless laptop use

Second Floor High School Addition

Second Floor Middle School Addition

New Middle School Elevator from 1 st floor to 2 nd floor ADA Requirement

Eastchester Union Free School District Proposition One Third Floor High School

High School

Eastchester Union Free School District Proposition One Third Floor Highlights

3 rd Floor High School Addition

Utilizing Every Square Inch” Eastchester Union Free School District Proposition One Lower Level “Basement” “ Utilizing Every Square Inch”

High School

Eastchester Union Free School District Proposition One Lower Level Highlights

Lower Level High School

Eastchester Union Free School District Additional Needs “ Proposition Two”

Middle School Cafeteria Expansion Instrumental Lesson Rooms

Two Instrumental Lesson Rooms 410 Square feet each

Middle School Cafeteria Expansion Instrumental Lesson Rooms

Middle School Cafeteria Expansion provides an additional 1235 square feet

HighlightsHighlights There will be a bond referendum, comprised of 2 propositions, put before voters in the Eastchester School District on March 19, The plans for the renovation and construction project at the High School and Middle School include the following:

At Eastchester High School (largely using the existing building footprint where the cafeteria is currently located): 7 NEW general education classrooms 4 NEW small group instruction classrooms 4 NEW science (lab) rooms 1 NEW art classroom 1 NEW physical education/fitness station 4 NEW toilet rooms 3 RENOVATED art classrooms 2 RENOVATED small group instruction classrooms Renovated cafeteria (relocated) with a commons and multi- purpose room and drop-in study center Proposition 1 ($19,600,000)

4 NEW general education classrooms 1 NEW technology classroom 1 NEW science/lab 1 NEW elevator Proposition 1 ($19,600,000) At Eastchester Middle School:

2 NEW instructional music/multipurpose rooms Renovation/expansion of cafeteria Proposition 2 ($1,285,000) At Eastchester Middle School: