Eastchester Union Free School District Pre-Bond Planning Presenter: Marilyn Terranova, Ph.D. – Superintendent of Schools
Lower Level First Floor Second Floor Third Floor
Eastchester Union Free School District Proposition One First Floor Middle School & High School
High School
Shared Wing
Middle School
Eastchester Union Free School District Proposition One First Floor Highlights
Old Gymnasium Revovated to New Cafeteria Capacity 260+
Commons: Meeting space for student clubs during lunch hours Small group instruction space during instructional time
Other school uses: Study halls Small group instruction Community uses: Holding large scale events that can be catered General community meetings
First floor of the Eastchester High School to replace the footprint of the existing cafeteria
1 st Floor Middle School
Eastchester Union Free School District Proposition One Second Floor Middle School & High School
High School
Shared Wing
Middle School
Eastchester Union Free School District Proposition One Second Floor Highlights
Mezzanine to High School Cafeteria Current old gymnasium
School uses: Additional eating area for students Meeting lunch space for staff Small group instruction Drop in study center Wireless laptop use
Second Floor High School Addition
Second Floor Middle School Addition
New Middle School Elevator from 1 st floor to 2 nd floor ADA Requirement
Eastchester Union Free School District Proposition One Third Floor High School
High School
Eastchester Union Free School District Proposition One Third Floor Highlights
3 rd Floor High School Addition
Utilizing Every Square Inch” Eastchester Union Free School District Proposition One Lower Level “Basement” “ Utilizing Every Square Inch”
High School
Eastchester Union Free School District Proposition One Lower Level Highlights
Lower Level High School
Eastchester Union Free School District Additional Needs “ Proposition Two”
Middle School Cafeteria Expansion Instrumental Lesson Rooms
Two Instrumental Lesson Rooms 410 Square feet each
Middle School Cafeteria Expansion Instrumental Lesson Rooms
Middle School Cafeteria Expansion provides an additional 1235 square feet
HighlightsHighlights There will be a bond referendum, comprised of 2 propositions, put before voters in the Eastchester School District on March 19, The plans for the renovation and construction project at the High School and Middle School include the following:
At Eastchester High School (largely using the existing building footprint where the cafeteria is currently located): 7 NEW general education classrooms 4 NEW small group instruction classrooms 4 NEW science (lab) rooms 1 NEW art classroom 1 NEW physical education/fitness station 4 NEW toilet rooms 3 RENOVATED art classrooms 2 RENOVATED small group instruction classrooms Renovated cafeteria (relocated) with a commons and multi- purpose room and drop-in study center Proposition 1 ($19,600,000)
4 NEW general education classrooms 1 NEW technology classroom 1 NEW science/lab 1 NEW elevator Proposition 1 ($19,600,000) At Eastchester Middle School:
2 NEW instructional music/multipurpose rooms Renovation/expansion of cafeteria Proposition 2 ($1,285,000) At Eastchester Middle School: