Transit Gas Pipeline EuRoPol GAZ s.a. The Yamal - Europe Transit Gas Pipeline section on the territory of Poland.

Slides:



Advertisements
Similar presentations
European Commission/IEA seminar with support of the Czech Government Rome 24 March 2003 Guidelines and Strategies for Energy Policies in Transition Economies.
Advertisements

Energiekamer Tariffs in the Virtual Test GRI NW Investment Ariane Kruijtzer Dutch Office of Energy Regulation.
Algiers, 30 th -31 st january 2001 EMERGING INVESTMENT OPPORTUNITES IN ALGERIAS ENERGY AND MINING SECTORS INTERNATIONAL PARTNERSHIP AND ALGERIAN GAS MARKETING.
ROMANIA NATIONAL REGULATORY AUTHORITY IN NATURAL GAS SECTOR ROMANIAN GAS SECTOR OVERVIEW.
October 7, 2004www.eegas.com2 Gas Pipeline System of Gazprom The total length of Gazprom pipelines is about 154,000 km, including:The total length of.
QLD Group established in July 2010 & it`s still at it`s infancy stage Similar model to WA – in partnership with SPE and mainly focus on Technical Events.
1 Natural Gas Transmission within Romanian Gas Market BLACK SEA ENERGY CONFERENCE 3-5 April 2006, Bucharest, Romania.
Region South-South East 2nd Implementation Group Meeting SSE Europe gas market: analysis of the Italian Route Vienna, 24 November 2006.
GIE Reverse Flows Study Revers Flows inside the SSE Region Vaclav Vocilka GIE Executive Secretary GRI SSE SG Vienna, 16 October.
VALMONT WIND ENERGY, INC. MODULAR TOWER SYSTEMS. Presentation Overview Bigger Machines Modular Tower Systems (MTS) Transportation Restrictions Flexible.
QUALITY MANAGEMENT AGA – BEST PRACTICE ROUNDTABLE Sara Peralta, Director – Quality & Improvement Philadelphia February, 2013.
March 20, 2003 East European Gas Analysis 1 Achieving Access to Russian Pipelines Pipeline capacity and daily flows – simple exercises Future bottlenecks.
DEVELOPMENT OF THE GAS MARKET IN SERBIA AND MONTENEGRO
Gaz-System S.A. Transmission System Operator Gdynia,
A view of BP Turkey July BP’s Operations in Turkey BP Fuels BP Lubricants BP Gaz LPG (bottle) and Auto LPG Air BP BP Marine BP Shipping Supply +
Space weather effects on Yamal – Europe transit gas pipeline: recent developments and prospects for coming decade A.Arabskii, Z.Salikhov, A.Zaitsev, V.Petrov.
Development of the Russian gas sector in the medium term May 17, 2011.
2 Permian Basin Supply San Juan Basin Supply Washington Ranch Storage Waha Compressor Stations Gas Supplies Transport Flow Directions Pipelines Production.
Castellanza Workshops October 2007 Hydroelectric power plant in Solina, Poland.
1 The Bulgarian Natural Gas Market: The TSO’s point of view Angel Semerdjiev, Executive Officer, Bulgartransgaz EAD 30 January 2009, Sofia.
The Interconnector Greece-Italy (IGI) Project:
Walter Boltz, Vice-President CEER 20 th Madrid Forum September 2011 Gas Target Model State of play.
Efficient Pigging of Gathering Lines
INITIATIVE FOR GAS HUB CREATION IN SOUTH EASTERN EUROPE SOFIA, г.
Eliminating distances, bringing energy closer. Pedro Miró WPC Madrid, July 2008 Algeria-Europe Gas Pipeline, via Spain MEDGAZ.
Iranian Gas Prospect H.E S.R.Kassaeizade Deputy Oil Minister and Managing Director of NIGC Presented by Turkey June.2008.
Bulgartransgaz EAD: Perspectives for Investments and Developing of the Gas Infrastructure Southeast Europe Business Forum; 22 – 23 November 2012, Istanbul.
EMPIRE- modelling the future European power system under different climate policies Asgeir Tomasgard, Christian Skar, Gerard Doorman, Bjørn H. Bakken,
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
04/10/2007CARTIGNY PRADURAT TEDELID1 Engineering school, Nancy, FRANCE 5 th and last year 1 year as ERASMUS students Project about Transportation of natural.
Domestic Natural Gas Installations Marc Billington.
Imagine the result European Infrastructure Friedrich Schneider, Executive Board Member August 4, 2010.
1 BULGARIAN NATURAL GAS MARKET STRUCTURE STRUCTURE Nikolai Pavlov Commissioner, SEWRC, Bulgaria Commissioner, SEWRC, Bulgaria Gas Regional Initiative –
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
INTERNATIONAL ENERGY AGENCY AGENCE INTERNATIONALE DE L’ENERGIE Geopolitical dimension of natural gas infrastructure Sylvie Cornot-Gandolphe Principal Gas.
3-4 November 2005GIE Annual Conference 2005, Athens1 The increasing importance of storage Klaus-Dieter Barbknecht GSE President GIE Annual Conference 2005,
Public Hearing – Meeting the Energy Demand Emmanuel Haton - BP April 25 th 2013.
Lithuanian interconnection projects Donatas Matelionis LITGRID AB
RBGC First Transnational Roundtable Vilnius 24th November 2011 « Core Corridors and the « Rail Baltica » James Pond DG MOVE European Commission.
Incentive Regulation for business development GTE Conference, Copenhagen 24th September 2004 Paolo Caropreso, COO Business Development.
1 Belgrade, 12 October 2007 Improvement of system for monitoring and control of transmission system, capacity calculation, and creation of technical conditions.
Discussion of Alternatives. OPTION 9 CO 2 PLANT PROCESSING Description: Operate the existing Castle Valley CO 2 plant to process the Price area coal-seam.
1 Investment costs in the Virtual Test GRI NW Investment I1- Virtual Test/Business Simulation Bas Barten Gas Transport Services.
Workshop on transportation routes Region South-South East 24th November 2006, Vienna Transportation route 3 – Velke Kapusany - Baumgarten.
GIE Annual Conference Bratislava, September 28-29, 2006 Author:Milan Sedlacek, SPP-preprava, a.s. TRANSIT IN CENTRAL EUROPE.
Lessons from Denmark - Development in the last ten years Energinet
“MSRT ENGINEERING" LLC is a pipeline equipment manufacturer. This equipment is high reliable, quick-disconnect. This pipeline equipment can be used in.
ENERGY SECURITY AND ENERGY UNION PERSPECTIVES FOR COUNTRY October/20/2015 CSF, Brussels BETTER RESEARCH, BETTER POLICY, BETTER REFORM
OPTION 9 CO 2 PLANT PROCESSING Description: Operate the existing Castle Valley CO 2 plant to process the Price area coal-seam gas. Plant can processes.
CRES – 7/2007 Transfer of experience for the development of solar thermal products TRANSOLAR Contract No: EIE/06/107/SI Duration:1/11/2006 – 31/10/2008.
 Project Capacity: 54 MGD  Water Purchase Agreement: 30-year take-if-delivered contract with San Diego County Water Authority for water purchase of.
Bulgaria Key Energy Challenges: Energy Security Presentation at Kapital Energy Conference Sofia, February 23, 2010 Peter Johansen and Claudia Vasquez Europe.
MYKHAILO GONCHAR NOMOS / STRATEGY XXI, UKRAINE Brussels, March 27 Transparency Regime for Trans-border Gas Flows: fundamentals and ideas.
Review Group -140 Thoughts on additional information requirements.
Innovation in the Region Brandenburg, Germany: "Power to Gas" for integration of Renewable Energy Mike Blechschmidt, Managing Director Blechschmidt Industrie-
Energy Security of Lithuania and Impact of Nord Stream Project dr.Tomas Janeliūnas The Institute of International Relations and Political Science.
1 NATIONAL PROJECTS OF REGIONAL IMPORTANCE MINISTRY OF ECONOMY AND ENERGY OF REPUBLIC OF BULGARIA SECOND CONFERENCE ORGANIZED BY NEWSPAPER “CAPITAL” 27.
About company Kurgankhimmash is the leading Russian company manufacturing process equipment for oil & gas producing, oil & gas refining, chemical, energy,
Gas Transit Workshop Brussels, 24th January 2007 Milan Sedlacek, SPP - preprava, Slovak Republic Gas transit regulation ( Slovakia as a country with standard.
Ref.1: Ikoku, Natural Gas Production Engineering, John Wiley & Sons, 1984, Chapter 7. Ref.2: Menon, Gas Pipeline Hydraulic, Taylor & Francis, 2005, Chapter.
Interconnection between the ROMANIAN and the BULGARIAN
sHPP VRŠUMA Draga, KO Draga, Tutin, SRBIJA -Business Plan-
Victorian Gas Declared Transmission System
EXERCISES Two water reservoirs are connected by a pipe 610m of 0.3m diameter, f’=0.038 and the flow produced by the difference in water surface elevations.
Opening the Eurasia Gas Corridor
Gas Supply to the EU – the Role of the Slovak Republic
Interconnectivity projects between the EU and Ukraine
Cross-border Infrastructure Projects
Action TR1201: Indicative pipeline specs/multiparty use
Presentation transcript:

Transit Gas Pipeline EuRoPol GAZ s.a. The Yamal - Europe Transit Gas Pipeline section on the territory of Poland

Key elements General description of the system Viability assessment of the Polish section of the Yamal-Europe Pipeline

EuRoPol Gaz main events 1993, EuRoPol Gaz S.A. foundation 1994, the European Union priority project 1998, beginning of construction 2000, the system partly in operation 2005, the first pipeline reached the target capacity

General description of the section

Technical Parameters Total length of the Pipeline km Pipeline Diameter of pipe: 1420 mm Maximum operating pressure: 8.4 MPa 5 Compressor Stations Total installed power of 5 compressor stations: 600 MW Total capacity of the existing first line: 32.3 billion cubic meters per year

VIABILITY ASSESSMENT ISSUE CASE ACASE BCASE C Availability of capacityYES Contractual requirementYES Regulation adequacyYES Tariff level and transparency111 Conflict resolution adequacyYES Availability of upstream gasYES Downstream price regulation problems N/A Balancing requirement problemsNO Availability of storage and flexibility services NO

This concludes my presentation