July 26, 2006-Meeting w/UPRR, KDOT and Ethanol Group August 2006- Ethanol Plant Group breaks ground with Governor.

Slides:



Advertisements
Similar presentations
Manhattanville in West Harlem. Phase 1 South of West 125 th Street 2 District Rezoning and Project Boundaries Total Area of Proposed Manhattanville Mixed-Use.
Advertisements

County of Fairfax, Virginia Department of Transportation Fairfax County Transportation Funding and Roadway Service Delivery Study Study Update – Transportation.
County of Fairfax, Virginia Board Transportation Committee Updates on Alternatives for Improving Roadway Services in Fairfax County Discussion of Converting.
Click to edit Master title style »Click to edit Master text styles –Second level Third level –Fourth level Fifth level Construction Update 11/13/2012 Larry.
NORTHERN VIRGINIA HIGHLIGHTS for the Dulles Area Transportation Association June 19, 2013 Helen Cuervo VDOT District Administrator, Northern Virginia.
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
IMPLEMENTATION OF THE STANDARD GAUGE IN THE MEDITERRANEAN CORRIDOR. Cartagena- French border.
Dennis L. Edwards Tunnel
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
DEL-71 Project at the US 36/SR37 Interchange Round Table Meeting Ferzan M. Ahmed, P.E.- District 6 Deputy Director Steve Fellenger, P.E. – Project Manager.
Grade Separation (GS-16) Project. Project Location - Bensenville N.
Intelligent Transportation Systems GDOT ITS Concept of Operations Presentation to ITS GA June 28, 2007.
Signs, Signals, and Pavement Markings
Drivers Education Journal # Please pick up all the handouts Get out a sheet of loose leaf paper and something to write with Write the.
Morse Avenue Streetscape March 24, 2010 The City of Chicago Department of Transportation.
1 Loop 303 US 60 to Happy Valley Parkway Arizona Department of Transportation February 26, 2014.
Newmarket Viaduct Replacement STAGED VIADUCT CONSTRUCTION / DECONSTRUCTION PROCESS PROJECT DELIVERY BY NGA NEWMARKET.
April 16, 2014 Carmeuse Lime & Stone, Inc. – Rail Industrial Access Project 1 Rail Industrial Access Program Application Briefing.
Strategic Approach to a Walkable Edmonton Pro Walk / Pro Bike 2004: Creating Active Communities September 9, 2004.
AVONDALE ROAD ITS 2006 COUNTYWIDE GRANT. AVONDALE ROAD ITS OVERVIEW OVERVIEW Location Location Avondale Road between Novelty Hill Road and NE 132 nd St.
Draft Lighting Policy Ted Swansegar Cell:
9-1 LOW COST SAFETY IMPROVEMENTS Practitioner Workshop Exercise C – Session #9.
Hucks and Browne Road Improvement Project Second Public Meeting October 5, 2010.
January 30, 2014 Luke Lortie, EIT Jerry Auge, PE
Pinehurst School Traffic Safety Pinehurst School Traffic Safety Meeting January 27-28, 2015.
Real Estate Contracts Group
Circulation in Coventry, the way of the future. By: Mathew Patefield, Alex Kent, Bryan Kearny, John Chamberlain, Nicole Vieira.
Wildlife Vehicle Collision Reduction Study
DEFENSIVE DRIVING TRAINING. What's difficult about driving? Increasing amount of vehicles on the road Other drivers attitudes Weather conditions Heavy.
The Railroad Industry Local Operations And Future Challenges.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Neighborhood Commercial on 5601 North Pine Hills Road Small Scale Land Use Amendment Application for.
MNM Fatal Powered Haulage Powered Haulage May 1, 2014 (Nevada) May 1, 2014 (Nevada) Gypsum Mine Gypsum Mine Co-owner Co-owner 57 years old 57 years.
9-1 LOW COST SAFETY IMPROVEMENTS Practitioner Workshop Exercise C – Session #9.
Speed Limits, Speed Control and Stopping Regulations.
Presenter: Dewayne Johnson, P.E. SE Region Director/Bureau of Traffic Operations Director.
Eric Tweit Spring 2014 Mercer Corridor Project: West Phase Project update.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
The 2010 Evaluation of Low Cost Safety Improvements Pooled Fund Study Technical Advisory Committee Meeting March 2010 Thomas M. Welch, P.E. State Transportation.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
MODULE 5 Objectives: Students will learn to recognize moderate risk environments, establish vehicle speed, manage intersections, hills, and passing maneuvers.
THINK*PAIR*SHARE Why do you think the chances of a collision are greater at an intersection than at any other point on the roadway? (Your answer should.
April 18, 2013 Luke Lortie, EIT Jerry Auge, PE
EL Civics Driving Laws Objective 12 Let’s learn some of the most common signs that we see when driving in the United States. We’ll test you at the end.
EMERGENCY MANAGEMENT WARRANDYTE COMMUNITY FORUM, 12 NOV 2015 TRAFFIC MODELLING.
156 th Street Design in Bennington Public Open House Meeting October 28, 2009 City of Bennington, NE.
Madison Avenue Reconstruction Department of Planning and Development.
WHO HAS THE RIGHT-OF-WAY? Definition of right-of-way The right of one roadway user to go first or to cross in front of another; right-of-way must be.
Margaret St Bike Blvd & McKnight Trail Reuben Collins Department of Public Works Capital and Transportation Planning.
Geometric Design: General Concept CE331 Transportation Engineering.
SUCCESSFUL APPLICATION FOR HIGHWAY SAFETY IMPROVEMENT PROGRAM (HSIP) GRANTS Presented By: Patrick V. DeChellis Deputy Director Los Angeles County Department.
HB 277 Regional Transportation Sales Tax Preliminary Project List Presentation Mayor and City Council Work Session March 1, 2011.
EAST CHEROKEE DRIVE PROJECT UPDATE CHEROKEE COUNTY ENGINEERING DEPARTMENT MARCH 31, 2016.
SIX YEAR TRANSPORTATION IMPROVEMENT PLAN (STIP) Public Hearing.
INTERSECTIONS HIGH RISK LOCATION!! *33% OF ALL COLLISIONS TAKE PLACE AT INTERSECTIONS!!!! * 25% OF ALL FATAL COLLISIONS TAKE PLACE AT INTERSECTIONS!!!!
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
MD 30 (Hanover Pike) at Mt. Gilead Road
ROUNDABOUTING WHAT YOU NEED TO KNOW
Carla Barron Ecoregions of Texas.
RURAL POTABLE WATER INFRASTRUCTURE WATERLINE AND TRUCKFILLS
District 6 – Safety Applications
Ecoregions Of Texas Yamileth Escarcega.
Highway 169 Bridge Replacement & Pavement Resurfacing
Industrial Training Provider ,
Geometric Design: General Concept CE331 Transportation Engineering.
Comprehensive Transportation Plan
Presentation to City of Palo Alto Rail Committee on Quiet Zones
Metropolitan District | mndot.gov
Virginia School Bus Driver Training
Presentation transcript:

July 26, 2006-Meeting w/UPRR, KDOT and Ethanol Group August Ethanol Plant Group breaks ground with Governor

Annual Average Daily Traffic=32 Trains= 17/day

Rolling Hills Rd. US-54

 This concept would cost less than moving US-54.  Plans were developed for this concept, Rolling Hills Road would be closed with this project. Ethanol Plant Avenue A US-54 UPRR Rolling Hills Rd.

 During plant construction a car going south collides with UP train going southwest on Nov. 8, 2006  3 fatalities  FRA requests a review at the crossing, this took place on Mar. 28, 2007; at the review a possible connection road north of the plant was discussed.  Improvements made after review: berm was flattened in NE quadrant, yield sign installed for northbound traffic and crossing was widened.

Projected Annual Average Daily Traffic…4200

 KDOT is advised that the Ethanol group can’t fund their share of the overpass project.  The overpass project plans are to be completed, the overpass project letting moved out 2 years.  KDOT-UPRR initiates crossing signal project at Rolling Hills Road.

The Rolling Hills Rd. crossing and roadway was widened an additional 10 feet, the power pole in the southeast quadrant was removed and the southeast radius was improved.

 Industries that develop an area should be responsible up front to provide transportation improvements or funds for these transportation improvements.  This should include at least 50% plans of the improvement prior to construction beginning on the industry.  The reality of this happening with this particular industry and the political issues surrounding this industry may make this difficult.