The SWING Project: status and closure of the project Bruno Zolesi. Istituto Nazionale di Geofisica e Vulcanologia.

Slides:



Advertisements
Similar presentations
Short overview of the SCORE project
Advertisements

A Guide to Localizing the Hyogo Framework for Action
ELECTRONIC DATA COLLECTION SYSTEM Howard Hamilton.
MODELING AUTHENTICITY Mariella Guercio – Giovanni Michetti September 2009.
European Standards for (RF)ID-Systems Helmut Wolf Phone: +49 (0) 6131 – ETSI Workshop on RFID and The Internet.
Objectives To introduce software project management and to describe its distinctive characteristics To discuss project planning and the planning process.
WP7 Internal Evaluation & Quality Assurance Green Employability Project StudioCentroVeneto - Toni Brunello and Paolo Zaramella Vienna, 10th January 2012.
SOA for EGovernment 1 Emergency Services Enterprise Framework: A Service-Oriented Approach Sukumar Dwarkanath COMCARE Michael Daconta Oberon Associates.
Paris, 11th of July 2008 Quality Assurance in Higher Education Recognition procedures of agencies Bruno CURVALE Head of international affairs at AÉRES.
DRIVER Long Term Preservation for Enhanced Publications in the DRIVER Infrastructure 1 WePreserve Workshop, October 2008 Dale Peters, Scientific Technical.
Critical Infrastructure Protection Policy Priorities Sara Pinheiro European Commission DG Home Affairs.
The Implementation Structure DG AGRI, October 2005
Reducing administrative burden in Bulgaria: Single Entry Point for Reporting Fiscal and Statistical Information Dr.Mariana Kotzeva President of National.
The Managing Authority –Keystone of the Control System
INFSO/F3 1 Guide for proposers Willy Maes INFSO/F3, EC TEN-TELECOM Information Day.
1 Introduction to the importance of quality in the conceptualization of a territorys image Cécile Levret, Euromontana.
Near-Field Tsunami Early Warning and Emergency Planning (NEARTOWARN) contract n /2011/614039/SUB/A5 Kick-off meeting of the projects funded after.
The NATURE–SDIplus project Best Practice Network for SDI in Nature Conservation Co-funded by the Community Programme eContentplus ECP-2007-GEO Co-funded.
EN Regional Policy EUROPEAN COMMISSION Information and Publicity SFIT, 15 June 2006 Barbara Piotrowska, DG REGIO
WMO’s Activities in Disaster Risk Reduction
WMO Monitoring & Evaluation System (Measuring our Performance/Success)
AERONAUTICAL COMMUNICATIONS PANEL (ACP) TWENTY THIRD MEETING OF WORKING GROUP F WACAF/ESAF BRIEF REPORT BY OMODELE AROWOLO Cairo, Egypt 21 – 27 September.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
0 - 0.
Addition Facts
Project Appraisal Module 5 Session 6.
Smart City Projects – EU Projects OPTICITIES
Communicating over the Network
June 18, 2007 M. Pedrosa de Barros ANACOMs Comments to the ARECI Study r.
European Commission – Directorate-General Communication 1 Lessons learned from the European Year of Volunteering Preparations for the European.
1 Welcome to KTH! KTH, the Royal Institute of Technology Excellence in Education, Research and Entrepreneurship Victor Kordas, KTH Grants Office.
B. Zolesi *, Lj.R. Cander **, A. Belehaki ***, I.Tsagouri ***, M.Pezzopane * and S.Pau * Istituto Nazionale di Geofisica e Vulcanologia, Italy; ** Rutherford.
HE in FE: The Higher Education Academy and its Subject Centres Ian Lindsay Academic Advisor HE in FE.
WP3. Evaluation, Monitoring and Quality Plan Dr. Luis Sobrado 27 th May 2011.
1 Kentuckys Public Safety Awareness Initiative Program Coordination and Partnerships August 23, 2005.
EMS Checklist (ISO model)
Draft Change Management Strategy Framework and Toolkit An Overview TAU Workshop: Vulindlela Academy (DBSA) 12 April 2012 Presenter: Dr Patrick Sokhela.
1 NEST New and emerging science and technology EUROPEAN COMMISSION - 6th Framework programme : Anticipating Scientific and Technological Needs.
Determining the Significant Aspects
SAI Performance Measurement Framework
1 Department of Medical Assistance Services DD Waiver Provider Training Department of Medical Assistance Services Division.
OPENING Enzo Dalle Mese CNIT – Lab RaSS. What is CNIT? CNIT (National Interuniversity Consortium for Telecommunications) is a no-profit organization of.
Addition 1’s to 20.
Test B, 100 Subtraction Facts
System’s generalities and structure of the final report Cesidio Bianchi. INGV.
Week 1.
“RACCE” Raising earthquake Awareness and Copping Children’s Emotions ECHO. C4 – Civil protection prevention and preparedness 2010 Kick off meeting – Brussels.
Gesundheits- und Soziale Dienste Charlotte Strümpel PrepAGE – Enhancing disaster management and preparedness for the older population in the EU Kick-off.
Report on ACER Progress An exchange of views with the Committee on Industry, Energy and Research of the European Parliament Brussels, 11 July 2011.
Comenius Individual Pupil Mobility. Individual Pupil Mobility Aims of the action-1  Allow secondary school pupils to spend between 3 and 10 months in.
CIRAS PROJECT OVERVIEW
INGV-CNIT-NOA-EO Project presented in the ambit of CIPS program SWING Short Wave critical Infrastructure Network based on new Generation of.
INGV-CNIT-NOA-EO Plenary meeting – First year activities Short Wave critical Infrastructure Network based on new Generation of high survival.
HF management communication system and link optimization Bruno Zolesi. Istituto Nazionale di Geofisica e Vulcanologia.
AGENDA ITEM 4: FOLLOW-UP ON THE DECISIONS OF THE WORLD METEOROLOGICAL CONGRESS ON THE INTERGOVERNMENTAL BOARD ON CLIMATE SERVICES AGENDA ITEM 4.1: IMPLEMENTATION.
Identification of Critical Infrastructures in the Mediterranean Sea context and communications’ criticalities Irene Fiorucci Cesidio Bianchi Istituto Nazionale.
Bruno Zolesi Istituto Nazionale di Geofisica e Vulcanologia The SWING Project: Headlines and Aims With the support of the Prevention,
Smart Grid - Cyber Security Small Rural Electric George Gamble Black & Veatch
INTERNET CRITICALITIES Activation and deactivation of the emergency back-up network Fabrizio Cuccoli, Francesco Sermi RaSS CNIT UO Firenze.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
DETERMINATION OF THE TOPOLOGY OF HIGH SURVIVAL HF RADIO COMMUNICATION NETWORK Andrea Abrardo.
Rome, February 14, 2013 Status of the Project Report on the first year activities With the support of the Prevention, Preparedness and Consequence.
Zolesi B. 1, Belehaki A. 2, Tsagouri I. 2, Altadill D. 3, and Morelli M. 4 1 Istituto Nazionale di Geofisica e Vulcanologia, Rome, Italy, 2 National Observatory.
Quality Management (WP5) Roman CHIRCA Agency for Innovation and Technological Transfer TecTNet ………... This project has been funded with support from the.
1 Women Entrepreneurs in Rural Tourism Evaluation Indicators Bristol, November 2010 RG EVANS ASSOCIATES November 2010.
Role of Technical Agencies Responsible for Hazard Assessment, Monitoring, Observations, Data and Analysis Dr. David Green National Oceanic and Atmospheric.
ECHO, European Commission, Brussels 20 Jan 2016 KnowRISK project Kick off meeting for the selected projects under the 2015 Call for proposals for prevention.
Presentation of Work Package 6 (WP6) “Design and implementation of Dissemination Activities” MATcHES Kick-off meeting Feb 2014 Ruse, Bulgaria TEMPUS BG-TEMPUS-JPHES.
Critical Infrastructure Protection Policy Priorities
Presentation transcript:

The SWING Project: status and closure of the project Bruno Zolesi. Istituto Nazionale di Geofisica e Vulcanologia

The Project 2SWING Final Meeting | CNIT - Pisa, Italy13/12/2013 Starting date: January 1 st, 2012 End date: December 31 st, 2013 Duration: 24 Months Partnership: Consiglio Nazionale universitario per le Telecomunicazioni Istituto Nazionale di Geofisica e Vulcanologia Observatori de l’Ebre National Observatory of Athens

The Aim of the Project 3SWING Final Meeting | CNIT - Pisa, Italy13/12/2013 In case of wide scale terroristic or attacks able to render useless Internet links the aim of the Project named SWING was: 1.to establish the basis for a South European robust radio network, based on SW architecture; 2.to utilize innovative ionospheric sounding techniques and real time signal processing and forecasting, to support Critical Infrastructure communications, both short and long range.

The Aim of the Project 4SWING Final Meeting | CNIT - Pisa, Italy13/12/2013 In fact the potential risk of wide scale terrorist attacks able to put out of order, for a long period, the internet connections capabilities exposes the some European Critical Infrastructures (ECIs), like electric power distribution and production infrastructure, CPAs, safety and defense organization, water distribution agency, airports, etc. in a stage of vulnerability because of some essential information are transferred by means of internet both for management and control.

The Aim of the Project 5SWING Final Meeting | CNIT - Pisa, Italy13/12/2013 The aim of SWING was to study a high survival HF radio network (data/voice) to real time support of ECIs communications, maintaining the minimum flux of essential information for the management and control in case of wide scale terrorist attacks able to render internet links useless over the Mediterranean region. This will increase the awareness of ECIs operator in the extreme case of the complete broadband failure of the communication.

Objectives 6SWING Final Meeting | CNIT - Pisa, Italy13/12/ To study internet communications criticality. 2.To analyze the requirements necessary to ECIs and CGAs management and control. 3.To develop a communication protocols in order to define standard software and hardware tools supporting reliable and interoperable Short Wave radio communication techniques for ECIs and CGAs protection. 4.To study the frequency management system taking into account the special characteristics of the ionospheric channel. 5.To design a radio-communication architecture for a distributed South European short wave radio network.

The Aim of the Project 7SWING Final Meeting | CNIT - Pisa, Italy13/12/2013 Target groups Agencies and institution devoted to management of Critical Infrastructures that are linked by internet network. Expected results The project is finalized to demonstrate the feasibility of a network high survival HF communication as buck-up and independent system to ensure minimum management and communication requirements, in the case of internet failure due to a terrorist attack.

Activities and Deliverables 8SWING Final Meeting | CNIT - Pisa, Italy13/12/ Interface with EU authorities and coordination. 2.Technical analysis of the communication problems related to the identification and designation of CIs in the interested area. 3.Determination of the topology of high survival radio communication network. 4.Characterization of the minimal amount of information necessary for the survival of the CIs communication. 5.Operative supervision of the network architecture. 6.6-Analysis of the existing architecture of HF communication based on internet protocol access with reference to the above considered infrastructures. 7.Analysis of existing HF connection system in terms of software and hardware for internet connection. 8.Definition of the High survival HF radio network technical requirements. 9.Radio network system design. 10.Criteria of early warning alert and procedures to activate the back up network. 11.Monthly prediction of the hourly HF set of frequencies over the n radio links given by the network, based on the available ionospheric model and methods. 12.Daily forecasting of the hourly HF set of frequencies based on the Mediterranean ionospheric measurements. 13.Ground wave propagation analysis when required. 14.Frequency management system for HF communication link optimization. 15.Identification of the professional profile able to maintain and operate network. 16.Dissemination of deliverables within communities informing about initiatives organised in the context of the project. 17.Professional training activities trough courses, workshops and conferences. 18.Assessment of the potential impact and feasibility of the project for ECIs and CGAs and final recommendations for the EC. 19.Realization of a demonstrator constituted by 4- terminals HF network.

SWING System’s generalities and structure of the final report: Cesidio Bianchi. 9SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

Design and realization of HF station prototype: James Baskaradas and Anna Lisa Saverino. 10SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

HF management communication system and link optimization: Bruno Zolesi 11SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

High Survival HF radio Network: Michele Morelli. 12SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

13SWING Final Meeting | CNIT - Pisa, Italy13/12/2013 Internet Criticalities: Fabrizio Cuccoli. Determination of the topology of high survival HF radio communication network: Andrea Abrardo. Identification of Critical Infrastructures in the Mediterranean Sea context and communications’ criticalities: Irene Fiorucci.

Final recommendations and closure of the financial budget: Antonio Meloni 14SWING Final Meeting | CNIT - Pisa, Italy13/12/2013

Partner members 15SWING Final Meeting | CNIT - Pisa, Italy13/12/2013 Enzo Dalle Mese Fabrizio Berizzi Alessandro Andreadis Andrea Abrardo Annalisa Saverino Davide Adami Fabrizio Cuccoli Francesco Sermi Giovanni Dore Luca Sanguinetti Marco Moretti Michele Morelli Amerigo Capria Marco Martorella Giovanna Zanello Simeon Kamdem Kuiteing Consiglio Nazionale universitario per le Telecomunicazioni

Partner members 16SWING Final Meeting | CNIT - Pisa, Italy13/12/2013 Anna Belehaki Ioanna Tsagouri David Altadill Estefania Blanch Observatori de l’Ebre National Observatory of Athens

Partner members 17SWING Final Meeting | CNIT - Pisa, Italy13/12/2013 Cesidio Bianchi James Arokiasamy Baskaradas Antonio Meloni Irene Fiorucci Valentina Orlandi Alessandro Settimi Adriano Azzarone Bruno Zolesi Istituto Nazionale di Geofisica e Vulcanologia

Website 18SWING Final Meeting | CNIT - Pisa, Italy13/12/2013 Home page screenshot of the SWING website at

Conclusion 19SWING Final Meeting | CNIT - Pisa, Italy13/12/2013 Thanks for your attention!