Marc Briese, P.E., PTOE Hugo City Council, May 21, 2012.

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Board Transportation Committee Updates on Alternatives for Improving Roadway Services in Fairfax County Discussion of Converting.
Advertisements

March 1, Why an interchange at this location? TH 15 Corridor Study 2007 Nine Signalized intersections Six in Top 50 High Crash Cost Study outcome.
General Update March Background As the region grows, increased travel demand on our aging Metro Highway System will continue to create additional.
Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.
TIGER PROGRAM LESSONS LEARNED Great PA/NJ Regional Trail Projects Presentation to the Circuit Coalition May 15, 2014 Chris Stanford, P.E., PTOE, PMP Michael.
Jon Chiglo, PE Project Director 2014 Construction Plans.
MDOT University Region 10 county region 3 Transportation Service Centers (TSC) Jackson TSC Jackson County Jackson County Hillsdale County Hillsdale County.
Robert Herling, Planner Duluth-Superior Metropolitan Interstate Council A Quantitative Assessment Method For System Safety.
McKenna Boulevard Traffic Management Meeting Presented to: McKenna Blvd. Residents W. Madison Police Precinct, Madison June 13, 2007.
Road Diets and Roundabouts
Great Western Corridor Feasibility Study
Gateway Corridor Alternatives Analysis Findings Metropolitan Council Transportation Committee November 26, 2012.
Highway 13 & Highway 101 Interchange Construction SP Savage, Scott County Municipal Consent Public Hearing December 7, 2009.
EFFICIENT TRANSPORTATION SOLUTIONS IN MINNESOTA A JOINT PRESENTATION TO THE Transportation Funding Advisory Committee September 14, 2012.
Downtown Access Improvements Plan Town of Hillsborough 2014.
Hot Springs Public Meeting Reconstruction of US 18 & US 385
Signs, Signals, and Pavement Markings
1 June 13, 2013YMPO RTP Technical Advisory Committee Meeting.
Local Housing Assistance Plan Amendment State Fiscal Years Board of County Commissioners August 5, 2014.
All Roads Transportation Safety Roadway Departure Crash (Formerly Jurisdictionally Blind Safety)
Maryland Avenue and Arkwright Street Jerry Auge, PE Project Manager Ramsey County June 25, 2013.
DDI Traffic Informational Session Town of Cornelius Lake Norman Chamber of Commerce June 11, 2014.
Holman Highway 68 / Highway 1 Roundabout Planning Commission May 14, 2013.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
US 1 CORRIDOR STUDY AND PROJECT PRIORITIZATION PROCESS Augusta, GA November 29, 2012 Jeff Carroll CDM Smith Georgia Association of MPOs Annual Conference.
T.H. 23 / South Saratoga Street Reduced Conflict Intersection and Pedestrian Overpass Project Project hearing October 14, 2014 City Council Presenters.
Maryland Avenue and Westminster Street Jerry Auge, PE Project Manager Ramsey County Paul St. Martin Traffic Engineer City of St. Paul September 10, 2013.
Mecca Roundabout Project Mecca, CA September 28, 2011.
January 30, 2014 Luke Lortie, EIT Jerry Auge, PE
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
1 SDDOT SAFETY PROGRAM. 2 Who Am I ??? CLIFF REUER TRAFFIC & SAFETY ENIGNEER SOUTH DAKOTA DEPARTMENT OF TRANSPORTATION OFFICE OF PROJECT DEVELOPMENT
Feasibility Study FOREST GLEN PASSAGEWAY April 10, Isiah Leggett Montgomery County Executive Arthur Holmes, Jr. Director Department of Transportation.
U.S. 31 at CR 400 South Roundabout Information Meeting December 18, 2013 Clifty Creek Elementary Columbus, Indiana.
Partial Lesson first 20 out 65 slides 4 Lane Strategies and Rules of the Road.
Research Priorities UTC Safety Summit Pittsburgh, PA ● March 19, 2015 Jessica B. Cicchino.
Interstate 435 and Front Street Interchange Improvements This presentation will probably involve audience discussion, which will create action items. Use.
Intersection Control Evaluation (ICE). Outline  Background  ICE Process  Impacts  Current Status.
STH 145 Roundabout Presentation Bloom Companies, LLC July 3, 2012.
ROUNDABOUTS Improving Safety and Efficiency The Ohio Department of Transportation District Clark Ave. Ashland, OH Julie Cichello, P.E. District.
The Challenge The intersection of State Highway 13 and County Road 2 in Scott County, Minnesota, was the site of 2 fatal crashes and 50 injury crashes.
U.S. 31 at C.R. 400 South Intersection Improvement Clifty Creek Elementary School May 22, 2014, 6:00 p.m.
9 TH STREET IMPROVEMENT PLAN Corvallis Area Metropolitan Planning Organization (CAMPO) Ali Bonakdar.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2011/12 – 2015/16 Presentation to Board of County.
T.H. 23 / SOUTH SARATOGA STREET REDUCED CONFLICT INTERSECTION AND PEDESTRIAN OVERPASS PROJECT PROJECT HEARING June 10, 2014 City Council Presenters Glenn.
Unsignalized Intersections Safety at Unsignalized Intersections.
STA Safety Project PID #76439 December 12, 2006.
April 18, 2013 Luke Lortie, EIT Jerry Auge, PE
SAFETY FUNDING APPLICATION SUM CANTON ROAD CORRIDOR SUM Canton Road Corridor Project Safety Improvements.
MANATEE COUNTY TRAFFIC SIGNAL RETIMING Orange Blossom Trail (SR 500/US 441) from Oak Ridge Road to I-4 FPID Design Phase Public Information.
Route 12B Safety Improvement Project New York State Department of Transportation Mark Silo, P.E. Thomas J. Madison, Jr. Regional DirectorCommissioner.
1/23/20161 Traffic Calming Devices Workshop Prepared by City Engineering Department.
Slower vehicle speeds (under 30 mph) means less severe crashes 90% reduction in fatalities, 76% reduction in injury crashes 75% fewer vehicle conflict.
Street Design Construction White Bear Avenue Reconstruction Jesse Farrell, P.E &
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2013/14 – 2017/18 Presentation to Board of County.
Conducted by: Tyler Womble. “A place where two or more roads meet, especially when at least one is a major highway” Can be regulated by: Stop Signs Traffic.
PUBLIC INFORMATION MEETING Ridgewood Avenue Safety Improvement Project From North of Falcon Avenue / Riverside Drive to North of Lamont Street in Volusia.
SR 44 at Grand Avenue Volusia County, FL River to Sea CAC/TCC Meetings May 17, 2016.
MD 30 (Hanover Pike) at Mt. Gilead Road
All About the County Road 22 Roundabout
us 30 and SR 603 – Ashland county September 7, PUBLIC meeting
District 6 – Safety Applications
Florida Department of Transportation
Public Information Meeting NW 100th Street Reconstruction Project
Work Zone Safety Review – District 1 - Duluth
ROUNDABOUTS Improving Safety and Efficiency
Active Traffic Alternatives
State Road 72 Safety Improvements
Issaquah-Fall City Road
Sarah Tracy, P.E., PTOE Assistant Traffic Engineer
Presentation transcript:

Marc Briese, P.E., PTOE Hugo City Council, May 21, 2012

 Thru-stop  Each leg with two lanes of approach ◦ RT/bypass lanes on 61 ◦ Thru/left and RT lanes on county approaches  Average Daily Traffic: ◦ Hwy 61: 9,700 ◦ CSAH 4: 4,100 ◦ CR 4A: 1,400  Hardwood Creek Trail

 Safety, : ◦ 10 crashes (14 people injured) ◦ No issue with recognizing stop condition ◦ #473 in crash cost* ◦ Compared to other similar intersections:  2x higher % right angle  3x higher % rear end  2.5x higher crash rate * 8,200+ intersections in ranking

 City, county, state priority  HSIP Regional solicitation for  Submitted as traffic signal with turn lanes  Received funding for 2014  2012  2013

IssueTraffic SignalRoundabout Safety - Expected Crash Reduction* Moderate benefit - 50% reduction High benefit - 70% reduction Crash SeverityModerate (still 25% right angle) Low (virtually no right angle) OperationsHigh efficiency Benefit/Cost AestheticsLess pleasingMore pleasing O&M CostsPower, heads, LEDs, cabinetLandscaping, signs ConstructionUnder trafficSome closures & detours *based on FHWA crash modification clearinghouse  All-way stop eliminated based on 2030 operations  ICE recommends roundabout

Source - Insurance Institute for Highway Safety

 Full closure ◦ ~$1.2 million – no city cost ◦ 2-3 months, summer ◦ Incentives, A+B, lane rentals to minimize length ◦ Benefits: quicker completion, less expense, safer, better product

 Temp bypass ◦ Hwy 61/4A as temp all- way stop, three legged intersection ◦ +$200k (no city cost) ◦ months ◦ Impacts school year ◦ 3 weeks full closure ◦ Benefit: keep intersection partially open

 No hazards in the middle or clear zone (trees, boulders) ◦ Grasses, shrubs, flowers, perennials are ok  Standard landscaping: minimal maintenance seed (similar to signal option)  City responsibility for Costs/maintenance above standard TH 7/TH 25 St. Bonifacius

 Schedule an open house  Final design starting now  Construction in 2013 Questions or Comments?