Bridge Enhancements 07/22/2013 Route 47 Missouri River Bridge Bridgescape, LLC.

Slides:



Advertisements
Similar presentations
Piedmont Improvement Program NC Society of Engineers
Advertisements

Planning and Development Committee West Corridor Update May 10, 2007.
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee September 20, 2011.
Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Reston Metrorail Access Group (RMAG) Status Report Board of Supervisors Transportation Committee November 29, 2011.
Replacement of the Queens Approach Bronx-Whitestone Bridge
S.P (TH 43) Winona Bridge Project Mississippi River in Winona Industry Outreach Meeting July 29, 2013.
Office of Traffic, Security, and Technology Guide Sign Design June 18-19, 2013 Arden Hills, MN.
Dennis L. Edwards Tunnel
TSPLOST Update River Valley Region TIA Citizen’s Panel April 24, 2014.
Jon Chiglo, PE Project Director 2014 Construction Plans.
Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
Executive Summary Introduction In 1988, by virtue of State Statute , the Nebraska State Legislature first assigned the Nebraska Department.
Caltrans, District 11 LAUREL STREET OVERCROSSING 1/16/2014.
IIT Madras, SERC Madras, Anna Univ., INSDAG
Grade Separation (GS-16) Project. Project Location - Bensenville N.
St. Croix River Crossing Project Public Information Meeting
Ohio Department of Transportation District 9 I RONTON -R USSELL B RIDGE R EPLACEMENT
Hot Springs Public Meeting Reconstruction of US 18 & US 385
Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014 OVERVIEW | SOURCE OF PROJECTS PROPOSED HIGHWAY IMPROVEMENT.
Buffalo Lake Dam Project Update date Meeting June 30, 2012.
ROUTE 72 BRIDGE IMPROVEMENTS TP 708 Pre-Proposal Meeting May 2, 2008.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
TRAILS AS TRANSPORTATION Design & Construction Michael J. Kubek, P.E. Ohio Department of Transportation, District 12 Production Administrator.
Chapter 34 Bridge Construction.
Bridge No over the Spokane River at State Line (looking south) 1 of 19.
Bridges unit 101.
WTBA/ WisDOT Contractor /Engineer Conference January 21 and 22, 2009 Local Government Involvement on WisDOT Projects Craig J. Treadway, P.E., NE Region.
Reconstruction of the Eads Bridge Highway Deck
Clinton Street Bridge over the Maumee River ODOT Project DEF December 2, 2014 Stakeholder’s Meeting.
SUISUN CITY Suisun City Planned Development Area Connectivity for a Better Community.
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
NCTCOG Sustainable Development Call for Projects Interlocal Cooperative Agreement Reporting Form Reimbursement Phase 2 5/24/20151 This portion.
Route 47 Missouri River Bridge Bridgescape, LLC. Bridge Typical Section.
Wabash Pedestrian Bridge Design For Riverfront Development Committee INC. and The City of Terre Haute.
Route 109 Bridge Reconstruction at Wood Road The Missouri Department of Transportation.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Bridges from all over the World! By: Maria Peloro & Christine Sniffen Bridges powerpoint project 2 nd period science.
Route 364 (Page Ave. Extension) The Missouri Department of Transportation.
Utah Collaborative Active Transportation Study.  Regional Collaboration.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Bicycle and Pedestrian Planning May City of Ellsworth Bike-Ped Planning May 2009 Accomplishments: POLICY and ADMINISTRATION The City Council adopted.
CEAL January 31, Existing Alternative (Preferred Align) Objectives SR-76 Corridor Expand Mobility Improve Safety Enhance natural resources Synergy.
In this Presentation…. Project Overview Key Issues Elements of Design Funding and Schedule.
ILLINOIS ROUTE 23 (LaSalle St.) DOWNTOWN RE-ALIGNMENT December 2, 2008.
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
Imagine the Possibilities… Vision from the 2002 Rail Plan.
Presented by: Department of Transportation - Toll Bridge Program New Benicia-Martinez Bridge Project.
North Main Street Improvements BID Meeting Wednesday, October 29, 2008.
Transportation Investment Act of 2010 AASHTO/MTAP Conference December 6-9, 2010 Savannah, Georgia Steve Kish, Transit Program Manager Georgia Department.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Jake Neal and Jay K.  OFFICIAL NAME: Smithfield Street Bridge LOCATION: Pittsburgh.
UTSA WAYFINDING September 29, 2010 Business Affairs: Your Partner for Successful Solutions Next Steps.
Rantoul Street / 1A Reconstruction Project December 10, 2015.
VT 100 over the Mad River Bridge Replacement July 13, 2015.
Fairview Avenue North Bridge Replacement Project Seattle Bicycle Advisory Board MariLyn J. Yim, P.E. October 7, 2015.
. Client: City of Pittsburgh, Brighton Heights Community Objectives : Develop a pedestrian/bicycle bridge reconnecting Brighton Heights to Riverview park.
December 17,  MnDOT signed a highway easment in 1960 with US Steel  The TH 53 is over a ore deposit with shallow strippings, high iron and low.
Many construction projects inseparable crane. How and Why They Are Raising the Bayonne Bridge Roadway The right solution To accommodate increasingly larger.
Arizona Forward Update
High Bridge Re-Deck Project
Est. Begin Construction
District 3 Complete Streets Projects
Transportation Alternatives (TA) Set-aside
SE 12th Street Roadway Improvements February 8, 2005.
Endorsement of the Recommended Design Concept (Preferred Alternative) for Transforming I-66 Outside the Beltway Board Transportation Committee October.
May 9, 2019.
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Presentation transcript:

Bridge Enhancements 07/22/2013 Route 47 Missouri River Bridge Bridgescape, LLC

Bridge Typical Section

Distinctive appearance so that bridge remains a symbol Stay within budget: “German Simple” Recognize views to bridge from downtown/riverfront Maintain views to downtown from the bridge Keep design subtle; historic feel with minimal detailing Light pedestrian/ bicycle trail but not entire roadway; Lighting should enhance structure, not draw attention to itself. Committee Design Goals (4/18/2013)

Previous Committee Selections: Variable Depth Girders ** ** MoDOT Funded Pier Shape – Gothic Pier ** One (1) Overlook Located at Pier 7 ** Railing – 27” Concrete Wall with Vertical Railing Element Girder Lighting – Girder Wash Fade Pier Lighting Overhead Pier Element – Curved Truss w/ Sun Shade Low Level Trail Lighting

Previous Committee Prioritization: Enhancement Priority Decorative Railing 1 Girder Lighting 2 Pier Lighting 3 Trail Lighting 4

View from Washington Riverfront Park

Aerial View of Overlook

View from Pedestrian/ Bicycle Trail

View from Northbound Traffic Lane

View from Trail Below Bridge

Preferred Enhancement Package Decorative Rail + Girder Lighting + Pier Lighting + Trail Lighting PrioritizationEnhancementEstimated Cost (4)Estimated Cost (4A) 1 Decorative Railing (Addition to MoDOT Credit) $380,000 2 Girder Lighting – Fade (west face only) $587,000 Girder Lighting – Fade (east and west face) $1,133,000 3 Pier Lighting $172,000 4 Trail Lighting (full length) $137,000 SUBTOTAL $1,276,000$1,822,000 3% Inflation for 3 years (9.27%) $118,000$169,000 TOTAL $1,394,000$1,991,000

Project Schedule Final Enhancement CommitmentAugust 16, 2013 Public Hearing (Right-of-Way)October 2013 Final Enhancement Funds Secured August 2014 Open Construction BidsSeptember 2016 New Bridge Open to TrafficFall 2018 Project Complete Summer 2019