Q & A EMMA collaboration. Neil Bliss FFAG08 - EMMA STATUS REPORT – 1 st Sep 2008 Q & A (1) What should the bunch charge be ? –8, 16, 32 and 64 pC with.

Slides:



Advertisements
Similar presentations
Ian Kirkman and Graham Cox July 29 th EMMA commissioning shifts so far June 21 st, 22 nd, 23 rd and July 12 th, 13 th, 14 th, 15 th “Analogue” BPM.
Advertisements

IK Slide 0 First look at the WCM data from July 2012 September 6 th 2012 Ian Kirkman.
EMMA LAYOUT Neil Bliss, Bruno Muratori EMMA LAYOUT - EC Meeting ERLP EMMA RING EMMA layout is required to fit within equipment and emergency.
#3224 Sat 17 th November Restored an “AP” set-up with some measurement of Twiss. – The idea was to take some BPM data with a known twiss set-up to see.
Commissioning August & September. 2 Agenda 11:20 Coffee 11:30 Introduction Sue S 11:35 Controls (an overview) Brian M 10:55 Controls & Data Acquisition.
ILC RF phase stability requirements and how can we demonstrate them Sergei Nagaitsev Oct 24, 2007.
ALICE : Superconductive Energy Recovery Linac (ERL) “Quick course” for new machine operators Part 3: Experimental and Operational Procedures Y. Saveliev.
EMMA Overview Ben Shepherd Magnetics and Radiation Sources Group ASTeC STFC Daresbury Laboratory.
“AC” Dispersion Measurement David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
Y. Karadzhov MICE Video Conference Thu April 9 Slide 1 Absolute Time Calibration Method General description of the TOF DAQ setup For the TOF Data Acquisition.
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
Simulation of IP beam size with orbit jitter + wakefield in EXT-FF ATF2 Project Meeting K.Kubo.
Gamma Beam Systems a simple introduction. Purpose of the machine Deliver a high performance photon beam: Variable energy Highly polarized High intensity.
Bruno Muratori STFC, Daresbury Laboratory Commissioning EMMA 02/07/09 PRISM workshop – Imperial College.
The EMMA Project Rob Edgecock STFC Rutherford Appleton Laboratory & Huddersfield University.
Modelling of the ALICE Injector Julian McKenzie ASTeC STFC Daresbury Laboratory IOP Particle Accelerators and Beams Group Status and Challenges of Simulation.
1 Plans for KEK/ATF 1. Introduction 2. Related Instrumentations at ATF 3. Experimental Plans for Fast Kicker R&D at ATF Junji Urakawa (KEK) at ILC Damping.
ALICE Commissioning Part II : Injector Yuri Saveliev Seminar on 14-15/07/2008 Gun to Booster Booster to FCUP-01 The rest of the Injector.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
NanoBPM Signals Second Mini-Workshop on Nano Project at ATF December 11-12, 2004 Toyoko Orimoto Yury Kolomensky Lawrence Berkeley Laboratory & University.
ASTRA Injector Setup 2012 Julian McKenzie 17/02/2012.
CAN WE BUILD A SINGLE BUNCH FEEDBACK Eric Plouviez ESRF Diagnostic group.
Status of Beam loss Monitoring on CTF3 Results of Tests on LINAC and PETS as R&D for TBL Anne Dabrowski Northwestern University Thibaut Lefevre CERN CTF3.
Cavity BPM processing and hardware upgrade plans A. Lyapin, S. Boogert, E. Yamakawa.
Energy Spectrometer for the ILC Alexey Lyapin University College London.
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
EMMA Horizontal and Vertical Corrector Study David Kelliher ASTEC/CCLRC/RAL 14th April, 2007.
Managed by UT-Battelle for the Department of Energy Analysis of 2008 Beam Instability Data S. Cousineau, V. Danilov, M. Plum HB2008.
Acceleration System Comparisons S. Machida ASTeC/RAL September, 2005, ISS meeting at CERN.
1 FFAG Role as Muon Accelerators Shinji Machida ASTeC/STFC/RAL 15 November, /machida/doc/othertalks/machida_ pdf/machida/doc/othertalks/machida_ pdf.
LCLS_II High Rep Rate Operation and Femtosecond Timing J. Frisch 7/22/15.
Managed by UT-Battelle for the Department of Energy Using Online Single Particle Model for SNS Accelerator Tuning Andrei Shishlo, Alexander Aleksandrov.
Bruno Muratori (for the EMMA team) STFC, Daresbury Laboratory EMMA commissioning 02/09/08.
1 H. Hayano for the ATF collaboration Low Emittance Beam Generation in ATF H. Hayano for the ATF collaboration BPM electronics improvement emittance tuning.
1 Franz-Josef Decker 1 Multi-Bunch Operation for LCLS Franz-Josef Decker March 17, Definitions and goals multi-bunch within.
RHIC CNI Polarimeter status RHIC CNI Group February 26, 2008.
Cavity BPM: Multi-bunch analysis N Joshi, S Boogert, A Lyapin, F. Cullinan, et al. Royal Holloway University of London,
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
2 February 8th - 10th, 2016 TWIICE 2 Workshop Instability studies in the CLIC Damping Rings including radiation damping A.Passarelli, H.Bartosik, O.Boine-Fankenheim,
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
Run 10 Start-up Status
Notes from Tom’s visit 1. Controls is under-staffed 2. Common Diagnostics platforms (BPM, FCT, DCCT, BLM,…) 3. Where possible, ‘Smart’ Diagnostics, running.
ISG – Damping Ring Physics and Design Group ATF – 2003// focus on the TRC challenge Marc Ross – 1.Instability about which little is known: Fast ion,
SL_THOMSON C. Vaccarezza on behalf of the SL_Thomson team.
Jørgen S. Nielsen Center for Storage Ring Facilities (ISA) Aarhus University Denmark ESLS XXIII (24-25/ ), ASTRID2 facility 1.
A single-shot method for measuring fs bunches in linac-based FELs Z. Huang, K. Bane, Y. Ding, P. Emma.
Applications of transverse deflecting cavities in x-ray free-electron lasers Yuantao Ding SLAC National Accelerator Laboratory7/18/2012.
LEIR re-commissioning and other operational aspects First ideas for new tools and organization First draft re-commisisoning plan H. Bartosik, A. Huschauer,
Nonscaling FFAG design and EMMA experiment
Feng Zhou LCLS-II AP meeting 02/23/2017
Sara Thorin, MAX IV Laboratory
Emittance Dilution and Preservation in the ILC RTML
Beam-Based Feedback in LCLS-II
March Trip Plan Mikey Davis 01 March /7.
Beam Optics Set-Up at SLAC End Station A
BC2 Commissioning Parameters
Needle Cathodes for RF Guns
Time-Resolved Images of Coherent Synchrotron Radiation Effects
Synchronization Process PSB example
ورود اطلاعات بصورت غيربرخط
High Level applications development status
Linac Diagnostics Patrick Krejcik, SLAC April 24, 2002
CLIC Feasibility Demonstration at CTF3
Linac Physics, Diagnostics, and Commissioning Strategy P
Linac Diagnostics Commissioning Experience
some tools for longitudinal phase space
Scanning Synchronization
New VUV-FEL Simulation results
Cooling of C6+ ion beam with pulsed electron beam
Presentation transcript:

Q & A EMMA collaboration

Neil Bliss FFAG08 - EMMA STATUS REPORT – 1 st Sep 2008 Q & A (1) What should the bunch charge be ? –8, 16, 32 and 64 pC with 8 only if really needed How do we set D x & D ’ x at the entrance of EMMA ? Do we need to run with 1 pC at all ? –no Which model is the best / easiest to use as –online model (ZGOUBI for now but wraparound will work on others) –standard offline model ZGOUBI / MMCA / GPT / PTC / Scott / Shinji / FFEMMAG How do we crest / zero-cross cavities in the EMMA ring ?

Neil Bliss FFAG08 - EMMA STATUS REPORT – 1 st Sep 2008 What is the best way to zero the dispersion on exit of the EMMA ring ? Do we want to introduce collimators in a region of high dispersion ? where ? any other suggestions to reduce energy spread (if necessary) ? What data do we want displayed by the BPM signals ? Q & A (2)

Neil Bliss FFAG08 - EMMA STATUS REPORT – 1 st Sep 2008 Which systems do we need available from the cavities to read in the control room ? Which BPMs are crucial ? How are RF systems synchronized and which is the best set-up for our first run? Are we happy with the new naming convention ? –See Neil Bliss’ slides & no we are not so everything stays How detailed a TOF scan do we want ? –1 ps Q & A (3)

Neil Bliss FFAG08 - EMMA STATUS REPORT – 1 st Sep 2008 How do we change the frequency in the cavities while setting up the new phase automatically ? Does this still hold if we change the energy ? Q & A (4)

Neil Bliss FFAG08 - EMMA STATUS REPORT – 1 st Sep 2008 Q & A (5) What should be our first run ? When can we claim victory ?