NP Release Flag Conflict Toshimichi Otsubo Kashima Space Research Center National Institute of Information and Communications Technology ILRS Fall 2005.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

1 A B C
Scenario: EOT/EOT-R/COT Resident admitted March 10th Admitted for PT and OT following knee replacement for patient with CHF, COPD, shortness of breath.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
193 G 10. G 194 G G 10 G 197 G
Variations of the Turing Machine
Accredited Supplier Communications Plan FY09-10 Q1 to Q4 May 2009, v2.0 Home Access Marketing & Stakeholder Engagement Team.
AP STUDY SESSION 2.
1
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
UNITED NATIONS Shipment Details Report – January 2006.
David Burdett May 11, 2004 Package Binding for WS CDL.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
CALENDAR.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
Year 6 mental test 10 second questions
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Photo Slideshow Instructions (delete before presenting or this page will show when slideshow loops) 1.Set PowerPoint to work in Outline. View/Normal click.
Student & Work Study Employment Facts & Time Card Training
Break Time Remaining 10:00.
This module: Telling the time
The basics for simulations
Turing Machines.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
1 The Blue Café by Chris Rea My world is miles of endless roads.
Bright Futures Guidelines Priorities and Screening Tables
Physical Aspects [Reflection Modelling] Hauptseminar: Augmented Reality for Driving Assistance in Cars.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
15. Oktober Oktober Oktober 2012.
TESOL International Convention Presentation- ESL Instruction: Developing Your Skills to Become a Master Conductor by Beth Clifton Crumpler by.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
We are learning how to read the 24 hour clock
1..
Various SLR Observation Errors Detected in Daily Multi-Satellite Analysis Toshimichi Otsubo Kashima Space Research Center National Institute of Information.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
: 3 00.
5 minutes.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Analyzing Genes and Genomes
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
Essential Cell Biology
Converting a Fraction to %
Clock will move after 1 minute
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Copyright Tim Morris/St Stephen's School
1.step PMIT start + initial project data input Concept Concept.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Presentation transcript:

NP Release Flag Conflict Toshimichi Otsubo Kashima Space Research Center National Institute of Information and Communications Technology ILRS Fall 2005 Workshop, 4 Oct 2005

Everyone makes mistakes, so... ILRS Normal Point: Data Record, Column 48 A flag to indicate the data release 0: first release of data 1: first replacement release of the data, 2: second replacement release, etc. It helps to keep the data set consistent at all ACs/AACs

Recent conflict passes [1] YY DAY HR SITE WLEN SAT

Recent conflict passes [2]

Recent conflict passes [3]

Wettzell case: acceptable for all ACs? (Block A) (Block B) Shouldn’t be 1 NP block = 1 pass? We have modified the data collecting software to adapt this at NICT, but not sure for other analysis centres. Flag = “0” pass NP bin Legal or otherwise, this is confusing e.g. with: Flag = “0” Flag should be “1”, but sometimes “0”

Various SLR Outliers Detected in Daily Multi-Satellite Analysis Toshimichi Otsubo Kashima Space Research Center National Institute of Information and Communications Technology ILRS Fall 2005 Workshop, 4 Oct 2005

Upgraded QC analysis at NICT More frequent! –Daily analysis (used to be weekly) –Daily webpage updates, AIUB; weekly SLReport. More satellites! –16 Sats at maximum. Typ. 11 to 14. More accurate! –‘concerto v4’ –IERS Conventions 2003 compatible

Various SLR Outliers Seen in Post-fit Residuals (Type a)Spikes (Type b)Constant RB or TB (Type c)Wrong Satellites, Wrong Year/Day or LeapSec (Type d)Unexplainable

(a) Spikes - Pattern 1 : Tail

(a) Spikes - Pattern 2 : Head

(a) Spikes - Pattern 3 : Middle

(b) Constant - Pattern 1 : Range Bias # # 1893 = KATZIVELY # sat site date time dur rb mm error tb us error prec bad total AJI /08/17 19: ( 51 ) ( ) 47 0 / 5 AJI /08/18 18: ( 18 ) ( ) 4 1 / 6 STRL /08/19 19: ( 38 ) ( ) 37 0 / 4 AJI /08/21 18: ( 102 ) -4.7 ( 47.6 ) 38 0 / 14 STRL /08/22 19: ( 227 ) ( 45.1 ) 18 2 / 7 STRL /08/22 20: ( 32 ) 1.8 ( 14.9 ) 6 4 / 8

(b) Constant - Pattern 1 : Range Bias # # 7941 = MATERA # sat site date time dur rb mm error tb us error prec bad total AJI /09/17 05: ( 5 ) 6.1 ( 1.4 ) 2 0 / 16 LAG /09/18 06: ( 7 ) ( ) 4 0 / 2 AJI /09/18 07: ( 6 ) ( ) 1 0 / 3 AJI /09/18 08: ( 4 ) -1.2 ( 1.3 ) 2 0 / 23 STRL /09/19 17: ( 8 ) 1.7 ( 2.4 ) 2 0 / 13 LAG /09/19 20: ( 5 ) 3.1 ( 2.5 ) 2 0 / 13 LAG /09/19 23: ( 6 ) ( ) 8 0 / 3 LAG /09/20 00: ( 3 ) 6.0 ( 4.6 ) 2 0 / 8

(b) Constant - Pattern 2 : Time Bias # # 8834 = WETTZELL # sat site date time dur rb mm error tb us error prec bad total STRL /07/30 05: ( 6 ) 0.1 ( 1.4 ) 8 0 / 9 STRL /07/30 07: ( 13 ) 4.8 ( 3.0 ) 4 0 / 9 AJI /07/31 22: ( 4 ) ( 1.7 ) 1 0 / 11 AJI /08/01 00: ( 21 ) ( 6.3 ) 10 0 / 26 ETA /08/01 01: ( 44 ) ( 66.9 ) 7 0 / 9 STRL /08/01 02: ( 27 ) ( 6.1 ) 5 0 / 6 AJI /08/01 02: ( 10 ) ( 7.4 ) 3 0 / 12 STEL /08/01 04: ( 10 ) ( 2.2 ) 3 0 / 14 STRL /08/01 04: ( 8 ) ( 1.8 ) 3 0 / 11 STRL /08/01 06: ( 12 ) ( 2.5 ) 3 0 / 10 STRL /08/01 07: ( 11 ) ( 2.4 ) 4 0 / 16 LAG /08/01 09: ( 8 ) ( 5.9 ) 2 0 / 13 ERS /08/01 10: ( 46 ) ( 11.6 ) 9 0 / 6 LAG /08/01 13: ( 9 ) 4.0 ( 5.2 ) 6 0 / 11 STEL /08/01 15: ( 6 ) 2.7 ( 1.3 ) 4 0 / 13

(b) Constant - Pattern 2 : Time Bias # # 7811 = BOROWIEC # sat site date time dur rb mm error tb us error prec bad total LAG /08/30 23: ( 8 ) 1.2 ( 6.1 ) 8 0 / 14 LAG /08/31 02: ( 8 ) -3.4 ( 7.0 ) 4 0 / 12 LAG /08/31 21: ( 16 ) ( 10.5 ) 6 1 / 15 LAG /09/01 20: ( 9 ) 4.7 ( 6.3 ) 5 0 / 13 STRL /09/01 22: ( 5 ) 0.5 ( 2.0 ) 6 0 / 12

(c) Wrong sat? Wrong date?

(d) Unexplainable

Discussions (a) Spikes 1-return NP: Handle with care (how did NASA overcame this?) Don’t jump to a conclusion that all 1-return NPs should be rejected. Reconsider the fitting function? (b) Constant RB/TB Some stations tend to repeat this. Needs self QC? (c) Wrong Sat, Wrong Date/Time and LeapSec Wrong year: seen in January. Leap Second on 1 Jan 2006! (d) Unexplainable??? Much improvement, compared to 90’s. Little harm to analysts, for densely tracked satellites. Hidden 3 cm error is more guilty than 3 m error.