WG1: High Power Targets PASI 2013 Working Group Sessions Introduction Convened by: Dr. C. Densham (STFC/RAL), Mr. P. Hurh (FNAL)

Slides:



Advertisements
Similar presentations
EuroNu CERN February 5, 2008 Marco Zito Super-Beam work package Marco Zito Dapnia-Saclay On behalf of the SB w2 team EuroNu 5/2/2008 Thanks to M. Dracos.
Advertisements

WG 4: High Power Proton Accelerators S. Holmes, J. Thomason PASI Collaboration Meeting April 3-5, 2013.
HiRadMat Beryllium thermal shock test Kavin Ammigan PASI 2 nd Annual Meeting RAL, UK April 2013 Contributors: P. Hurh, B. Hartsell.
Project X Experimental Facilities Target Facilities PASI 2013 WG1 P. Hurh (FNAL)/D. Asner (PNNL) w/ several slides stolen from R. Tschirhart (FNAL)
Fluidised powder target research A potential target technology for both a Superbeam and a neutrino factory CJ Densham, O Caretta, P Loveridge STFC Rutherford.
A Neutrino Factory Target Station Design based on Solid Targets J. R. J. Bennett STFC, Rutherford Appleton Laboratory, Harwell Science.
Advanced Energy Systems, Inc. FY 09 AES Phase I Crab Cavity SBIRs Michael Cole, Doug Holmes.
K. McDonald Muon Collaboration Meeting 19 Mar 2008 Future Target System R&D Analysis (and simulation) of MERIT data is ongoing, but the success of the.
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
Outline agenda for 2 nd RaDIATE Collaboration Meeting (Draft 2) C. Densham P.Hurh.
RaDIATE Meeting February /21/14P. Hurh RaDIATE Feb 2014 Meeting 1.
FETS-HIPSTER (Front End Test Stand – High Intensity Proton Source for Testing Effects of Radiation) Proposal for a new high-intensity proton irradiation.
FNAL Target Related Capabilities PASI 2013 Working Group 1 P. Hurh (FNAL)
EURISOL DS Target Meeting, CERN, CHY.KADIMarch 10-11, EURISOL DS PROJECT Task#2: MULTI-MW TARGET 1st year planning Y. Kadi (AB/ATB) European Organization.
M W PooleJoint DL-RAL Accelerator Workshop Jan 09 Introduction to ASTeC Programmes M W Poole Director.
Initiatives in the Target Sector J. R. J. Bennett CCLRC, Rutherford Appleton Laboratory, Chilton, Didcot, Oxon. OX11 0QX, UK.
Potential Portuguese Contributions to the ESS Project Areas and topics of interest for the ITN Pedro Vaz (ITN) Workshop “Towards a Portuguese Participation.
Isotope R&D Facility A proposed addition to the HRIBF driver upgrade Mike Saltmarsh HRIBF Users’ Meeting Nov 13 th 2009.
RaDIATE 1 st Annual Collaboration Meeting May Welcome and News & Notes Radiation Damage In Accelerator Target Environments.
Lessons learnt at 5 th High-Power Targetry Workshop Fermilab, May 2015 Federico Carra EN-MME ColUSM
1US-UK Workshop, Jan 12-14, 2012 Working Group 4 - High Power Proton Accelerators: Achievements and Plans for Second PASI Workshop John Thomason & Steve.
RaDIATE Meeting December /13/12P. Hurh RaDIATE December 2012 Meeting 1.
EUROTeV WP4 Report Polarised Positron Source Jim Clarke, on behalf of the WP4 team DESY Zeuthen STFC (Daresbury and RAL) University of Durham University.
Peter McIntosh (STFC Daresbury Laboratory) Jim Clarke (STFC Daresbury Laboratory) Camille Ginsburg (FNAL) 2 nd PASI Workshop, RAL April 3 - 5, 2013.
HK Secondary Beam Issues Chris Densham STFC Rutherford Appleton Laboratory.
RaDIATE October Technical MeetingOctober BLIP Irradiation Planning Radiation Damage In Accelerator Target Environments.
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
RaDIATE March 2015 Admin Meeting P. Hurh Fermilab 20 March 2015.
FP6 Design study "DIRAC secondary beams" Project "NUSTAR":Experiments with stored radioactive beams Super-FRS high-power production target has to cover.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
FP6 Design study "DIRACsecondary Beams" "NUSTAR":Experiments with stored radioactive beams Goals of Task 6: Research and development to handle the energy.
ILC/CLIC e + generation working group Jim Clarke, STFC Daresbury Laboratory and Louis Rinolfi, CERN.
RaDIATE Meeting September /22/13P. Hurh RaDIATE July 2013 Meeting 1.
RaDIATE Meeting July /22/13P. Hurh RaDIATE July 2013 Meeting 1.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
Collaboration between University- National Lab-Industry It is in the national interest to foster and support a vibrant and dynamic research infrastructure.
RaDIATE Meeting February /20/13P. Hurh RaDIATE February 2013 Meeting 1.
RaDIATE Admin Meeting October /09/14P. Hurh RaDIATE Oct 2014 Admin Meeting 1.
RaDIATE Meeting March /20/13P. Hurh RaDIATE March 2013 Meeting 1.
RaDIATE Meeting May /28/13P. Hurh RaDIATE May 2013 Meeting 1.
Harold G. Kirk Brookhaven National Laboratory The E951 Targetry Program Targetry Meeting CERN September 19, 2003.
October 9th, 2007 Daresbury – Positron Kick-Off Meeting Slide 1 Remote Handling Vinod K. Bharadwaj SLAC October 9th, 2007.
SLHC-PP WP7 8 April 2008 Structure SLHC- PP WP7 SLHC-PP Steering Group SPL Study Group DESY Peters INFN ? CERN Scrivens / Hofle STFC- RAL Faircloth CEA.
JINR-CERN 5-years Partnership Program N.Russakovich 103-rd session of theJINR Scientific Council meeting JINR, Dubna, 21 February 2008.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
FETS-HIPSTER A High-Flux Proton Irradiation Facility Steve Roberts (University of Oxford) Chris Densham (RAL), Alan Letchford (RAL), Juergen Pozimski (Imperial.
HIGH POWER TARGETS AND MACHINE/DETECTOR INTERFACE WORKING GROUP SUMMARY REPORT PASI 2012 Workshop, 1/14/12 Co-conveners: C. Densham, P. Hurh, J. Thomas,
STFC’s National Laboratories Round Table on Synergies and Complementarity among Laboratories John Womersley Chief Executive, STFC 13 th Pisa meeting on.
US Accelerator Industry- Small Business Perspective April 30,2013 US-Japan Advance Science and Technology Symposium Science Projects Homeland Security.
Target Proposal Feb. 15, 2000 S. Childress Target Proposal Considerations: –For low z target, much less power is deposited in the target for the same pion.
ORNL is managed by UT-Battelle for the US Department of Energy High Power Targets for Accelerator Based Research Facilities Bernard Riemer Spallation Neutron.
Thanks to all members of organisation committee for the preparation of this event Thanks to all participants for their interest R.Schmidt Introduction.
HPT & M/D I WG DISCUSSION SLIDES PASI 2012 Hurh et al.
INTRODUCTION PASI 2015 Swapan Chattopadhyay. ACKNOWLEDGMENT Steve Geer Steve Holmes Ken Long Peter McIntosh Sergei Nagaitsev Vladimir Shiltsev Alexander.
HIGH POWER TARGET DEVELOPMENT AT FERMILAB Accelerator Sector Planning and Strategy Workshop P. Hurh.
November 12, 2007 J.C. Sheppard/SLAC Slide 1 Thoughts on Remote Handling (taken largely [almost entirely] from Vinod Bharadwaj) (also a RIA movie from.
WP9 updated Upgrade of SPARC test facility for high gradient acceleration of electron beams for SuperB collider and FEL projects WP number9Start month1End.
EURISOL: European Collaboration towards the ultimate ISOL facility Yorick Blumenfeld IPN – Orsay We acknowledge the financial support of the European Community.
Registered participants participants from outside Cern.
Irradiated T2K Ti alloy materials test plans
Targets Neutrino Factory J. R. J. Bennett
Overview of radiation damage studies and the RaDIATE Collaboration
Introduction to ASTeC Programmes
“hot spots” SIS100 internal beam dump Super-FRS production target
NuFact2016 WG3 Program (for SPC meeting April 22)
NuFact2016 WG3 Program (for ???)
Targets & conversion to secondary radiation summary
Summary for the Sources working group
W. T. Weng Brookhaven National Laboratory
EPIC UK funding situation
Presentation transcript:

WG1: High Power Targets PASI 2013 Working Group Sessions Introduction Convened by: Dr. C. Densham (STFC/RAL), Mr. P. Hurh (FNAL)

2012 PASI Workshop Report “The working group has identified common goals in high power target systems.” “The leading cross-cutting concerns that emerged from the metric analysis are: furthering our understanding of radiation damage mechanisms, high power density heat transfer and the associated engineering challenges.” “Several notable specialized areas in need of development were identified. These include thermal shock in liquids & solids and damage mechanisms to superconductors in target radiation fields.”

2012 PASI Workshop: 12 Month Deliverables “Form an inter-disciplinary team between STFC, Fermilab and allied institutions to foster long term expertise in understanding the response of materials to radiation damage in the high energy proton regime.” “Participate in conceptual design and review activities of potential facilities” “Design of single pulse tests to explore failure modes for solid target materials at suitable facilities”

Did we deliver? RaDIATE- Radiation Damage In Accelerator Target Environments (FNAL, STFC/RAL, Oxford MFFP, BNL, PNNL NOvA Target Design Optimization and Construction (STFC/RAL) Mu2e Target Conceptual Design, Prototyping and Testing (STFC/RAL) Starting on design/analysis of a high intensity beam pulse test of Be at CERN (HiRadMat)

2012 PASI Workshop: 5 Year Goal “Build a cohesive and coherent target systems team allowing complementarity of facilities and personnel working towards the design of next generation projects.” So focus in this workshop is on capabilities and specific collaborative opportunities

Working Group 1 Charge Review the target facility related capabilities (both existing and near-future) of participating institutions. Identify institutions currently not participating in PASI with capabilities likely to complement the existing PASI target related capabilities. Review ongoing PASI-initiated, target related work with a focus on opportunities for extension of or additional collaborative activities. Review plans for next generation target facilities with a focus on opportunities for new collaborative activities. Identify where collaborative opportunities overlap capabilities. Recommend, and initiate where possible, new or extended collaborative work that benefits current and future target facilities as well as supporting the 5 year goal.

2013 WG 1 Goal Identify and launch specific collaborative activities to start within the next year Expressed as “12-month deliverables” in the closing Working Group Report (Session 6)

Capabilities Matrix Existing and Near Future Capabilities Potential or Available Target Test AreasMaterials Science Remote Handling/ Hot Cell Design/ Analysis/ SimulationManufacturing Facility Sum (6 max)Sum (12 max) Fermilab********************** Harwell/RAL/ISIS Culham NNUF Oxford MFFP DL UK University? NCSL/FRIB PNNL ORNL LANL BNL SLAC INL ANL LBL US University? CERN PSI Julich J-PARC GSI