Update on IDNO/DNO working group DCMF 12 November 2009.

Slides:



Advertisements
Similar presentations
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
Advertisements

DCMF Treatment of pre 2005 generation – DNO position Nigel Turvey 29 April | Energy Networks Association.
Charging Methodology Development Oliver Day © Copyright EDF Energy plc. All rights reserved. HV/LV Generation Charging April 2008 Oliver Day Distribution.
Update from DCMF MIG Claire Campbell Chair – DCMF MIG 05 April | Energy Networks Association - DCMF.
12 November 2009 energynetworks.org 1 PRESENTED BY SIMON BROOKE Stakeholder Communications for Price Control information and proposed Tariff Change information.
CE Electric UK – Potential developments in long-term charging arrangements and IDNO charging methodologies 1 April 9, 2008 Potential developments in long-term.
Update from DCMF MIG Update from the Distribution Charging Methodologies Forum (DCMF) Methodologies Issue Group (MIG) 3 December | Energy Networks.
EDCM update Mo Sukumaran (on behalf of CMG)
© Grant Thornton UK LLP. All rights reserved. Review of Partnership Working: Follow Up Review Vale of Glamorgan Council Final Report- November 2009.
June 2003 Structure of Electricity Distribution Charges Next Steps Martin Crouch Director, Distribution.
July 2003 Structure of Electricity Distribution Charges Welcome and Introduction Charles Gallacher Deputy Director, Scotland.
5 February 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
KEY CONSULTATIONS an overview Louise Masters InnogyOne, Innogy UK Offshore Wind 2003.
Retail Energy Forum Andrew Neves Central Networks - CMG Chair 2 March | Energy Networks Association.
Charging Methodology Development Oliver Day © Copyright EDF Energy plc. All rights reserved. Charging Methodology Update April 2008 Oliver Day Distribution.
EDCM submission workshop Andrew Neves CMG Chair 12 May | Energy Networks Association - CMG.
Smart Grid Forum - Update DCMF Meeting – 7 February 2013 Gareth Evans Head of Profession – Engineering Ofgem.
1 st April 2010 energynetworks.org 1 Common Methodology Group Work PRESENTED BY Tony McEntee, ENW Workstream 4 Update Common Connection Charging Methodology.
EHV generation charging methodology change Harvey Jones.
19 March 2010 energynetworks.org 1 PRESENTED BY Nigel Turvey Workshop on Distributed Generation Connected pre April March 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Update from DCMF MIG Update from the Distribution Charging Methodologies Forum (DCMF) Methodologies Issue Group (MIG) 14 June | Energy Networks.
15 January 2010 energynetworks.org 1 PRESENTED BY SIMON BROOKE Revised DCMF Terms of Reference Distribution Charging Methodology Forum.
12 November 2009 energynetworks.org 1 PRESENTED BY SIMON BROOKE, ON BEHALF OF CMG Amending the DCMF Terms of Reference Distribution Charging Methodology.
1 EHV DG Charging Nigel Turvey. 2 Background Our current EHV charging methodology was not vetoed on 18 th February 2010 with the following treatment of.
Provision of third party access to licence exempt electricity and gas networks Andy Pace 4 October | Energy Networks Association - DCMF.
17 May 2011 Generation Dominated Areas Oliver Day UK Power Networks (on behalf of DNOs) 1 | Energy Networks Association.
Energy Suppliers Forum CDCM/EDCM - CMG Update Mo Sukumaran – CMG 10 November | Energy Networks Association.
10 September 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY Common Distribution Charging Methodology Impact Analysis.
12 November 2009 energynetworks.org 1 PRESENTED BY SIMON BROOKE, ON BEHALF OF WSA Presentation from Workstream A looking at the Network Modelling aspects.
Update from DCUSA Michael Walls DCUSA Secretariat 04 August | Energy Networks Association - DCMF.
Provision of third party access to licence exempt electricity and gas networks Tony McEntee 5 April | Energy Networks Association - DCMF.
CDCM Training Session Introduction to producing DUoS Tariffs using CDCM Models Julia Haughey (EDF Energy) Binoy Dharsi (IPM Energy Retail Ltd) 20 December.
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Energynetworks.org 1 PRESENTED BY Andrew Neves, Chair CMG CMG and Workstream Update.
Update from DCMF MIG Michael Walls MIG Technical Secretary 04 August | Energy Networks Association - DCMF.
DCUSA Update ElectraLink. Charging Methodology CP Summary StatusCDCMEDCMCCCMBilling WG: Pre Consultation8 (DCP 133, 158, 159, 160, 161, 163, 165, 168)
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
The EDCM proposals A summary of Ofgem’s consultation Ynon Gablinger 2 June 2011.
Moving the QSEC and AMSEC Auctions Update. 2  Presented proposal at October Workstream  Questions / suggestions received, mainly around  Over & Under.
Managing Exceeded Capacity. 10 September The Issue of Exceeded Capacity DNO Connection Charging Methodologies: customers who increase Maximum Capacity.
EDCM update Mo Sukumaran On behalf of DNOs ( WSB Chair) 1 December | Energy Networks Association - DCMF.
Structure of Charges Year-end review for DCMF 22 November 2007.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
CDCM Annual Review Workshop Mo Sukumaran SSEPD (on behalf of DNOs) 17 May May | Energy Networks Association - CMG.
Update from DCUSA Michael Walls DCUSA Secretariat 06 October | Energy Networks Association - DCMF.
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
January 24, 2016 energynetworks.org 1 The SoC Project A PRESENTATION BY THE REGULATION GROUP OF THE ENERGY NETWORKS ASSOCIATION PRESENTED BY ANDREW NEVES.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Project Nexus : Funding Arrangements Joel Martin - 30 April 2009.
EDCM update Andrew Neves CMG Chair 2 June | Energy Networks Association - DCMF.
DCMF SIG terms of reference Harvey Jones Elizabeth Lawlor 2 December | Energy Networks Association - DCMF.
Update from DCMF MIG Claire Campbell Chair – DCMF MIG 02 February | Energy Networks Association - DCMF.
Structure of Charges: Update and next steps DCMF 10 September 2008.
4 June 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
LC14 Statement Oliver Day UKPN (on behalf of DNOs) 1 | Energy Networks Association 1 December 2011.
Proposal to modify Standard Special Conditions A4, A5 and D11 of the Gas Transporter licence Distribution Charging Methodology Forum (DCMF) 13 August 2007.
12 November energynetworks.org 1 PRESENTED BY MO SUKUMARAN, ON BEHALF OF WSB Presentation from Workstream B Pricing Modelling (EDCM/CDCM) Common.
7th DCMF on 19th June Connection Boundary Review Network charges comprise Connection Charges and ongoing Use of System (UoS) charges. The Connection.
CMG and Workstream Update
Code Governance Review UNC Modification Proposals
Transmission Workstream 4th July 2007
Holistic view of Charging Modifications – In flight 11th June 2018
Code Governance Review UNC Modification Proposals
DSC ChMC CSS update 8th August 2018
UNC Mod Retrospective Invoice Limitation © 24 November 2009 EDF Energy plc. All rights Reserved.
Exit Capacity Substitution and Revision
Generation Dominated Areas(GDA)
Gas Customer Forum 28 July 2008
DCMF STANDING ISSUES GROUP
Presentation transcript:

Update on IDNO/DNO working group DCMF 12 November 2009

2 Background Working group established in July 2008 to provide a forum for IDNOs and DNOs to talk openly about charging arrangements and facilitate the development of new charges for IDNOs capable of facilitating greater competition in distribution Specific terms of reference included: 1.Delivery of interim capacity ramping modifications 2.Delivery of interim UoS charging modifications for April April Development and delivery of IDNO CDCM for April To monitor the commercial arrangements surrounding boundary metering

3 Progress to date After almost 18 months we consider that many of these issues have been progressed: All DNOs have capacity ramping mods in place All DNOs have now submitted interim mods (EDF about to resubmit) DNOs have submitted CDCM Ofgem consulting on boundary metering Not suggesting that the group has been plain sailing; Severe delays in implementation of interim mods Still issues in CDCM which need addressing Still awaiting final decision on boundary metering But... Group seems to have finally achieved many of its initial aims

4 New format of working group Ofgem to take a step back from Chairing, overseeing and directing the working group. List of issues still to progress: HV split Generation tariffs Portfolio billing EDCM But in line with other charging forums, we consider that industry should now lead these debates with Ofgem in attendance not directing. Keen that the group continues and understand that they are looking towards appointing an independent chair to help address remaining issues prior to open governance and implementation of EDCM Does not mean that pressure is off DNOs to deliver. We will closely monitor progress and ultimately DNOs have to satisfy the licence conditions placed upon them by CDCM & EDCM.

5