Energy Balancing Credit Proposal MOD 315 Energy Balancing Credit Proposal MOD 315 To Enhance Section X of the UNC Transportation Principal Document to.

Slides:



Advertisements
Similar presentations
CWG Process Overview 5/08CWG formed to investigate comp issues – Philosophy: Small, intentioned group = more progress 10/08CWG Draft report to BoD – Next.
Advertisements

1 Overview of the 2011 Programme Budget Resolution Nicola Virgill-Rolle Alternate Representative Bahamas Chair Working Group on the Draft 2011 Programme.
Code Governance Review: WWU views on potential changes to UNC and the Modification Panel Simon Trivella – 30 th March 2010 Governance Workstream.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Review of NTS entry charge setting arrangements - IA 1 July 2010.
European Commission, DG Energy Ewout Deurwaarder 29/06/2010 Biofuels in the EU Renewable Energy Directive - Update Energy crops advisory group EF/010/077.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Long Term Entry Capacity & User Commitment Transmission Workstream 7 th August 2008.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
Energy Balancing Credit Proposals Transmission Work Stream 6th November 2008 Mark Cockayne.
Industry Dialogue on xoserve Services Progress Report for Ofgem 5 th December 2006.
Long Term Entry Capacity & User Commitment Review Group th September 2008.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Further consultation on NTS entry baselines Nienke Hendriks Head of Gas Transmission Policy, Compliance and Enforcement 14 August 2007.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
MOD506 – Gas Performance Assurance Framework and Governance Arrangements.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Credit Arrangements During a Prolonged Emergency Mark Cockayne and Jayne McGlone 11 December 2006 Whilst all reasonable efforts have been made to verify.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Modification Proposal 0246: Quarterly NTS Entry Capacity User Commitment Chris Shanley.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
Proposer: Hayley Burden Panel Date: 17th April : Mod Title: Imbalance Charge amendments required to align the UNC with the Network Code on Gas.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
Modification proposal 0073 ‘Revision to the Notice Period regarding the implementation of changes to Transportation charges’ Transmission Workstream, 2.
1 Transmission Work Group 1 st November 2012 Gas Security of Supply SCR Proposals Credit Implications for GB Gas Market EBCC Response Summary Mark Cockayne.
Modification Proposal 0395 & 0398 – Limitation on Retrospective Invoicing and Invoice Correction 1 st December 2011.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
PN UNC Workgroup Read Validation 4 th October 2011.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
Facilitating Release of Non-obligated Entry Capacity Draft – for discussion purposes only 22 November 2007.
Proposed Further Security Request Process. Contents  Introduction Page 2  Illustrative example of Request to Provide Further Security Request Following.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
Performance Assurance 21st May Incentives. USRV’s – Incentive Regime Charges are based on a range of standards USRV Period runs from 21 st of one month.
Energy Balancing Credit Proposals Transmission Work Stream 7th October 2010 Loraine O'Shaughnessy.
Energy Balancing Credit Variation Proposal Modification 0233 Transmission Work Stream 5th March 2009 Mark Cockayne.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Review of the UNC Post-emergency Claims Arrangements Strawman February 2009.
IGT and Shipper Workgroup meeting 28 th February 2011.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
Exit Capacity User Commitment – Transmission Workstream update
Introduction of Code Contingency Guidelines Document
PN UNC Workgroup Invoicing 4th October 2011.
PRIDe in Gas Model workshop
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Incentives 26 September 2018.
UNC Modification – Non Effective Days
Transmission Workgroup June 7th 2012
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Introduction of Code Contingency Guidelines Document
Draft Mod: Update of default System Marginal Prices
Transmission Workstream 2nd December 2010
Entry Overrun Calculation
Options for the Development of a Demand Side Response Mechanism
MOD_03_19 Amended application of the Market Back Up Price if an Imbalance Price(s) fail to calculate Energia.
Code Modification Proposal No 0315
Gemini Code Contingency Review
Draft Modification To Enhance Section X of the UNC to improve the Energy Balancing Further Security Process 25th June 2010.
Recovery of Costs due to Invalid Ex-Ante Contracted Quantities in Imbalance Settlement 25th January 2018.
Modification Proposal 136
Mod 209 – Rolling AQ.
Joint Office UNC Elections
Joint Office UNC Elections
Joint Office UNC Elections
Presentation transcript:

Energy Balancing Credit Proposal MOD 315 Energy Balancing Credit Proposal MOD 315 To Enhance Section X of the UNC Transportation Principal Document to improve the Energy Balancing Further Security Process UNC Panel Meeting 21st October 2010 Loraine O'Shaughnessy

Background  Following failure of Lehman’s and unprecedented economic factors in financial markets EBCC carried out review of the UNC section X and the Energy Balancing Credit Rules.  This Proposal is one of several modification requirements that were identified:  Implemented :  To Correct Drafting Inconsistencies between Sections X and V of the UNC in Respect of User Default and Termination  Recovery of Debt and Smearing of Revenues via Energy Balancing Neutrality  In progress:  0233V - Changes to Outstanding Energy Balancing Indebtedness Calculation: working with EBCC to develop alternative proposal  To Enhance Section X of the UNC Transportation Principal Document to improve the Energy Balancing Further Security Process : Panel recommendation 21 st Oct

Proposal  The aim of this proposal is to enhance the Further Security Process to minimise the potential risk to the community where Users have insufficient Security in place for their Energy Balancing Activities. It aims to:-  Extend the provisions under Section X2.10 to make provision for the utilised value (Cash Call Limit) of the User’s existing Security held to be scaled back by a percentage. (initially proposed to be 20% ) note that it is proposed that EBCC will review this % on a regular basis  It is further proposed that the provisions of Section X2.4 and X2.2 be amended to provide for the relationship between the User’s Cash Call Limit and Secured Credit Limit to be revised to facilitate such scale back.  To act as an adequate Incentive for Users to maintain the correct level of Security to accommodate the level of their Energy Balancing Activities and provides additional protection to all members of the Community of bearing the costs of any mutualised debt.

Drivers  Following failure of Lehman’s and the unprecedented financial climate change. The total number of Further Security Requests rose quite significantly in 2008 bringing more into the spotlight Users who had insufficient Security in place.  Proposal aims to minimise the potential risk of avoidable financial exposure to other Users who have sufficient Security in place.

Benefits  Minimises financial exposure of mutualised debt to Community.  Incentivises Users to ensure adequate Security is in place to accommodate their Energy Balancing Activities.  Opens lines of communication to the Energy Balancing Credit Committee earlier.  Maintains Users confidence that risk of default is being managed effectively.

Evidence to support the Materiality of the Issues and Questions raised at the UNC Modification Panel on 16 th September  How often does a Further Security Request happen?  What Values are involved?  What is the overall risk? This is difficult to quantify. The values detailed in the following slides represent the behaviour experienced by a small User however it highlights the risk that a large User could operate in the same way. This in mind the financial risk could be significant e.g. Communities exposure to Lehman’s debt > £5m a day.  There appears to be no value placed on a new entrant to the market?

How often does it Happen – Analysis 2008

How Often does it happen? – Analysis 2009

How often does it happen? – Analysis 2010

What Values are involved?  Analysis Financial value highlights the potential risk to Community and is the main driver to the Mod - significant increase in Further Security Requests issued. £11,533,  Analysis Although financial figure significantly reduced, highlights during Winter months an increase in Further Security Requests issued. £ 420,  Analysis 2010 – Demonstrates financial figure has already significantly rose from 2009 and approaching the winter period which will only increase risk to Community further. £ 563,000.00

What is the overall risk?  The overall risk to the Community would be reduced if Users had adequate Security in place to accommodate their Energy Balancing Activities.  The risk to an individual User receiving Further Security Requests increases if:-  Users do not balance daily.  If Users do not react proactively following repeated Cash Calls and Further Security Requests.  If Users have insufficient Security in place to accommodate Energy Balancing Activities.  This proposal would only come into force if the user has failed to react appropriately in the aforementioned circumstances  Mod aims to address:-  Repeated behaviours of Users using the Further Security Request process as a means to putting in Security  Financial risk to the Shipping Community.

There appears to be no value placed on a new entrant to the market?  Users who enter the Market must have Security in place to meet their Energy Balancing Activities. Therefore, the Mod would not cause any barrier to entry as it is currently a requirement and has not changed.  Security requirements for new users: - is based on 3 days non-deliverability at 12 months average SAP price to give a figure which represents 85% of the Secured Credit limit – based on an estimate of projected annual throughput.  Security for existing Users:- is based on 75% utilisation of peak indebtedness over last months to give a figure which represents 85% of the Secured Credit limit.  In any event:- Users will be required to maintain a minimum level of security at all times which is currently set at £10,000.

Next Steps  Review Energy Balancing Credit Rules with revisions to support Mod.  Issue proposal to go to consultation.