CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE.

Slides:



Advertisements
Similar presentations
1 MICE Target Status Chris Booth 3 rd March 2004.
Advertisements

1 A first design of the PEP-N Calorimeter A first design of the PEP-N Calorimeter Presented by P. Patteri Laboratori Nazionali di Frascati INFN for PEP-N.
Slide 1 Insert your own content. Slide 2 Insert your own content.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
SUBTRACTING INTEGERS 1. CHANGE THE SUBTRACTION SIGN TO ADDITION
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
PPRP September 2002 UK CMS 1 CMS Endcap Electromagnetic Calorimeter and Global Calorimeter Trigger, Physics & Computing Presented by Peter Hobson, Brunel.
US CMS Collaboration Meeting, May 19, Ren-yuan Zhu, Caltech PWO Crystal ECAL Ren-yuan Zhu California Institute of Technology May 19 th 2001.
Experimental Particle Physics
2002 LHC Days at Split, Split, October 2002 D J A Cockerill - RAL 1 The ECAL Endcap Calorimeter for CMS D J A Cockerill RAL - UK 2002 LHC Days at Split.
The Lead Tungstate Calorimeter for CMS
Vacuum Phototriodes for the CMS Electromagnetic Calorimeter Endcap
CMS ECAL Annual Review - CERN Sept 2001 R M Brown - RAL 1 Test results from 500 preproduction VPTs R M Brown RAL - UK CERN 19 September 2001.
STFC RAL EE at SLHC CERN 15/04/08 R M Brown - RAL 1 EE at SLHC What do we expect at SLHC? EE Layout VPT vulnerability to radiation - Faceplate darkening.
Prototype sPHENIX Calorimeters
1 Challenge the future 1 1 Structural control method research for MAV application Yao Lu Chairman : Prof. Dr. Fred van Keulen Supervisor: Dr. Hans Goosen,
YES New Mexico Enterprise Eligibility System
ECAL End Cap Schedule issues Justin Greenhalgh This presentation will be at under EE356.
CMS-UK Oversight Committee 17/5/04 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE EE crystals.
MICE RF Cavities and RFCC Module Update Derun Li Lawrence Berkeley National Laboratory MICE RF Workshop Daresbury Laboratory, UK April 17, 2012 April 17,
Crystals into Alveolar from BACK of assembly jig Face B Face A Interface plate Type 1 (0-TB H) Holes for Housing NOTCH Fibre optic.
2006 USL Load Data Study Presentation to EB Unmetered Load Working Group Stan But January 18,
CMS ECAL Meeting Ecole Polytechnique June 2005 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Trigger Meeting. Meeting held 29 th - 30 th June.
D Cockerill, RAL, 8 June 2005 Dee in testbeam ProposalP Bloch, C Seez, Y Sirois Dee calibration in test beam Last period of 2006, November Heavy ions,
LHCC Comprehensive Review 26/6/06 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps LHCC Comprehensive Review, June 2006 D Cockerill EE  EE large.
CMS Week March presented by John Coughlan RAL FED Hardware Status Pre-Series Manufacture Final Production Plans.
Past Tense Probe. Past Tense Probe Past Tense Probe – Practice 1.
Superconducting Magnet Program S. Gourlay CERN March 11-12, Lawrence Berkeley National Laboratory IR Quad R&D Program LHC IR Upgrade Stephen A.
Chapter 5 Test Review Sections 5-1 through 5-4.
Addition 1’s to 20.
ECAL FB Meeting, D Cockerill (RAL)1 Large EE Mechanics update.
25 seconds left…...
Test B, 100 Subtraction Facts
Week 1.
We will resume in: 25 Minutes.
Production and Operations Management
PPD CMS Away Day, Cosenors House, 29/9/05 D.J.A. Cockerill 1 DJAC: PPD CMS ECAL Hardware Tasks (i) The next 2.5 years (ii) The following 2.5 years To March.
B W Kennedy, CCLRC Rutherford Appleton Laboratory VPTs for the CMS experiment B W Kennedy CCLRC Rutherford Appleton Laboratory St Petersburg, 26 April.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
US CMS Collaboration Meeting, May 19, PWO Crystal ECAL Ren-yuan Zhu California Institute of Technology May 19 th 2001.
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
CMS Week, CERN, 2002 R M Brown - RAL 1 Performance Characteristics of Production VPTs R M Brown, B W Kennedy, P R Hobson (with crucial input from D J A.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
PSD8 September 2008, Glasgow.P R Hobson, Brunel University 1 Avalanche Photodiodes and Vacuum Phototriodes for the Electromagnetic Calorimeter of the CMS.
CMS SLHC workshop, D.J.A. Cockerill (RAL)1 CMS SLHC Workshop The CMS ECAL Detector at SLHC D Cockerill RAL
CMS ECAL Elba May 2006 R M Brown - RAL 1 The Status of the CMS Electromagnetic Calorimeter R M Brown On behalf of the CMS ECAL Group.
ECAL – EE Design Status Presentation 19/7/06 D.J.A. Cockerill - RAL 1 EE Design Status D Cockerill CERN 19 July 2006.
The CMS Electromagnetic Calorimeter at the LHC
B W Kennedy, CCLRC Rutherford Appleton Laboratory Vacuum Phototriodes for the CMS Electromagnetic Calorimeter Endcaps K.W.Bell, R.M.Brown, D.J.A.Cockerill,
All CMS 30 May07 TSV1 All CMS 3 30 May 2007 LHC machine CMS Progress Overall Schedule.
CMS ECAL End Cap WACH4, 28 Nov 2002 D Cockerill - RAL (1) - Yield, e/MeV with production crystals and production VPTs - Pre-calibration precision using.
CMS-UK Oversight Committee 18/11/03 R M Brown - RAL 1 Exploded view of CMS ECAL Tracker HCAL 4T solenoid Muon chambers Total weight: 12,500 t Overall diameter:
First CMS Results with LHC Beam
High Voltage Cards & 2000 Electronic/Thermal Model. CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000A.B.Lodge - RAL -1 ECAL End Cap 1 EE End Cap Engineering.
Geant4 Tutorial, Oct28 th 2003V. Daniel Elvira Geant4 Simulation of the CMS 2002 Hcal Test Beam V. Daniel Elvira Geant4 Tutorial.
Calorimeters Design Issues and Simulation Needs C.Woody Physics Department Brookhaven National Lab EIC Simulation Workshop Oct 9, 2012.
ECAL Plenary 27/2/07 D.J.A. Cockerill - RAL 1 Status of the CMS ECAL Endcaps ECAL Plenary, 27 Feb 2007 D Cockerill  VPTs  Electronics and Integration.
CMS-UK Oversight Committee 17/11/06 D.J.A. Cockerill - RAL 1 The CMS Electromagnetic Calorimeter UK Responsibilities Procurement and testing of VPTs Design.
CMS ELECTROMAGNETIC CALORIMETER Jean-Pierre Ernenwein OVERVIEW 6th international conference on advanced technology and particle physics Villa Olmo, Como,
HEP2001, Budapest, July 2001 R M Brown - RAL 1 The Vacuum Phototriodes for the CMS Electromagnetic Calorimeter P R Hobson, D C Imrie, O Sharif Brunel University,
HEP2001, Budapest, July R M Brown - RAL
The Status of the CMS Electromagnetic Calorimeter
UK CMS Oversight Committee Mtg
PROGRESS on EE VPTs, Dees D Cockerill
ELECTROMAGNETIC CALORIMETER
Presentation transcript:

CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 1 The CMS ECAL Endcaps Crystal ECAL Endcap Calorimeter (EE) Preshower EE

CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 2 CMS ECAL Endcap, EE UK Involvement Design and assembly of the EE The UK has led the EE project since its inception: - detailed Monte Carlo simulations - optimisation of the physics performance - research and development of Vacuum Photo-Triodes (VPTs) - detailed mechanical design and systems integration - testing of Supercrystals (SCs) in beams at CERN The UK is responsible for - completing the detailed design and systems integration - procurement and testing of VPTs - design and procurement of the VPT HV system - procurement of the mechanical structures for the detector - assembly of 50% of the SCs

CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 3 Vacuum Photo-triodes (VPTs) 25.4 mm Testing 1.8T at RAL 4T at Brunel Production proceeding to schedule 4000 devices per annum Last delivery Q Concerns: anomalous devices, 6% of production.

CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 4 EE Crystals EE crystals larger than the barrel crystals Shallower taper- different light collection - no depolishing 100 prototype crystals evaluated in results fed back to producer 100 pre-production crystals received in under evaluation at Imperial and Brunel Aim to place order for EE crystals by end of this year Crystals on critical path

CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 5 EE SC mechanics Design complete Contract 15,000 inserts 600 interface plates 600 housings Completed by Electro-Mec (Reading) Ltd in Oct 03. Interface plate and housing Concerns Late EE crystal delivery SC mass production not before Q Inserts

CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 6 EE large mechanics progress Design complete for Backplate Ring flange Positional spacers Contract signed with TM Engineering, UK Phase 1 test pieces successfully completed at TM to specification Nov Positional spacers Sample backplate Dummy SCs

CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 7 EE electronics integration Remaining major design task Detailed design for the integration of electronics and services on the back of EE Concerns: Complex area Requires input from other sectors of ECAL Need to pre-order cable looms etc well before parallel Dee assembly in 2006

CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 8 EE Calibration at test beam UK has demonstrated that the design meets the performance specifications of CMS Combined crystal plus preshower response to electrons at 180 GeV Resolution 0.62%

CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 9 EE planning

CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 10 EE planning Complete EE-1 in Q with reduced testing/calibration on Dee4

CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 11 CMS EE Conclusions Design for EE system integration and preparation for mass production top priorities. The mass production of SCs and the assembly of 4 Dees in 2006 will require a smooth transition from ECAL Barrel to ECAL Endcap production. UK seeking and encouraging other CMS ECAL institutes to participate in the mass production and assembly. Uncertainty on EE crystal delivery THE major concern UK successfully undertaking its deliverables to CMS - VPT procurement, test and appraisal - SC and large mechanics design and procurement - HV system design

CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 12 Additional info follows, next slide

CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 13 VPT response in magnetic field Characteristic response of VPT –vs angle at B = 1.8T –vs magnetic field at angle of 15  –nb: flat response v field above 1T 8  -24  in CMS

CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 14 Measured yield in 1.8T field Measured yield –In 1.8T field –Mean over 8  -24  –Converted to electrons/MeV VPTs meet CMS requirements Good correlation with measurements at 0T and 4T

CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 15 Measurements in different B fields Manufacturers measure p & g at 0T –pg well correlated with yield at 1.8T Sample testing at 4T using Brunel Univ superconducting solenoid –Good correlation with 1.8T data

CMS-UK Oversight Committee 18/11/03 D.J.A. Cockerill - RAL 16 Relative gain at 4T