Presentation to Radiocommunications Agency 16 June 2000 BFWAtg(00)39.

Slides:



Advertisements
Similar presentations
1. Introduction.
Advertisements

Simulation and Evaluation of Various Block Assignments Evaluation of multiple carriers deployed in a channel block evaluation criteria section.
/4/2010 Box and Whisker Plots Objective: Learn how to read and draw box and whisker plots Starter: Order these numbers.
Regional Workshop on planning of digital terrestrial broadcasting in relation to RRC-06 for CEE, CIS and Baltic States (Moscow, 21 –24 September 2004)
1 Ground Based Meteorological Radars Presented By: David Franc NOAAs National Weather Service September 2005.
Regional Information Meeting and Workshop related to the RRC-06 for the administrations of the Arab countries Damascus, Syria August 2005 Planning.
Michael Neale Brooks Cressman Hau Ho ICAO ACP WG-F/24 March 21, 2011.
FIXED SATELLITE SERVICE and UAS (22 September 2010)
DESIGN OF A SPECIFIC CDMA SYSTEM FOR AIR TRAFFIC CONTROL APPLICATIONS UNIVERSIDAD DE LAS PALMAS DE GRAN CANARIA UNIVERSIDAD POLITÉCNICA DE MADRID.
Lectures 6&7: Variance Reduction Techniques
College of Engineering Capacity Allocation in Multi-cell UMTS Networks for Different Spreading Factors with Perfect and Imperfect Power Control Robert.
Wireless Networks Review Question.
‘Unlocking the Band’ ‘Unlocking the 28GHz Band’ Matt Hobby – System Engineer.
SE19 review, 27 April TTPCom, Harris Systems Limited, Wavtrace Inc. REVIEW OF SE 19 RECOMMENDATIONS FOR COEXISTENCE IN GHz - 2 Agenda:
BFWAtg(00)30 Co-existence of MP- MP and PMP Systems Philip Whitehead Radiant Networks PLC.
Propagation Requirements for Broadband Fixed Wireless Access Dr M.J. Willis Radio Communications Research Unit Rutherford Appleton Laboratory
BFWAtg - BFWA sharing with RAS at 43 GHz Slide 1 Re-examination of the protection requirements for the Radio Astronomy Service in light of the Broadband.
Doc.: IEEE /0645r0 Submission May, 2010 Shuzo Kato, NICT/TUSlide 1 [Intra cluster response model and parameter for the enterprise cubicle environments.
National Weather Service 1 Results of Operational Compatibility Studies between ASR, Meteorological Radars and IMT Systems Operating in the –
BFWAtg - Guard Bands 28GHz Draft 26GHz Recommendation: –Two FDD systems At least one 28MHz “slot” or single polarisation only in adjacent slots. –Two TDD.
11th February 2000 BFWAtg(00)12. Structure of the presentation u Study objective and approach u BFWA characteristics u Interference analysis (worst case)
1 The 2.4 GHz ISM band Paul Hansell CEng MIEE Managing Director, Aegis Systems Ltd.
Altai Super WiFi Training WiFi Network Planning
Base Station Antenna Considerations in Wireless Network Deployment By David Shani V.P. Int’ Sales and Marketing With MTI Wireless Edge.
Chapter 5 The Cellular Concept.
Doc.: IEEE /0229r0 Submission February 2012 Assaf Kasher, IntelSlide 1 Transmit Mask Correction Date: Authors:
1 Channel Assignment Strategies Handoff (Handover) Process Handoff: Changing physical radio channels of network connections involved in a call,
1 HAP Spectrum Sharing Studies in the 28/31 GHz Band Y.H. Kang.
18GHz Band Update Chris Cheeseman Date:10 th Sept 2001Document Reference:prFLCC Meeting:FLCCWorking Paper No:FLCC (02-01) / 006.
A Study into the Theoretical Appraisal of the Highest Usable Frequencies RA Contract AY 4329.
Sharing of FWA with other services in the 5GHz band C MHz Private Business System Unit Radiocommunications Agency.
Using TSB-88 Region MHz Using TSB-88 to insure frequency usage does not cause interference in Region 5.
Frequency Sharing Study between FWA & FSS in the band MHz David Bryant Wireless Networks Presentation to UK W-LAN Advisory Group (Sharing &
Spectrum Management 2002 Marc Goldburg CTO, Internet Products Group ArrayComm, Inc. Adaptive Antennas (or “doing more with less”)
CELLULAR NETWORK. Early mobile system Cellular Network Use of one powerful transmitter located on high location. Range of signals was upto 50km. These.
Project: IEEE P Working Group for Wireless Personal Area Networks(WPANs) Submission Title: Link Budget for m Date Submitted: 5 March 2012.
1 Emerging issues Titus Spoelstra ESF Committee on Radio Astronomy Frequencies P.O.Box 2, 7990AA Dwingeloo, Netherlands
k Submission, Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Preliminary Proposal.
Designing for High Density Wireless LANs Last Update Copyright Kenneth M. Chipps Ph.D.
CELLULAR CONCEPT SHUSHRUTHA K S “Provide additional radio capacity with no additional increase in radio spectrum”
Propagation Models Large scale models predict behavior averaged over distances >>  Function of distance & significant environmental features, roughly.
Test 1: Co-channel interference at the mobile unit
Yschen, CSIE, CCU1 Chapter 5: The Cellular Concept Associate Prof. Yuh-Shyan Chen Dept. of Computer Science and Information Engineering National Chung-Cheng.
Cambium Networks PMP 450i 900MHz
SPECTRUM EFFICIENCY GAINS RESULTING FROM THE IMPLEMENTATION OF ADAPTIVE TRANSMIT POWER CONTROL IN FIXED TERRESTRIAL LINKS AT 38 GHZ S.A. Callaghan (1),
Section 6 Wideband CDMA Radio Network Planning. Radio Network Planning A radio network planning consists of three phases: 1.Network Dimensioning (using.
Coexistence in heterogeneous networks Discuss the interference issue
©Ofcom Spectrum reform in the UK: The development of Spectrum Usage Rights Professor William Webb 2006.
Earth Station on Vessels An Update to the NSMA Spectrum Management 2006 Presented by Ken Ryan, Skjei Telecom May 17, 2006.
Doc.: IEEE RR-02/036 Submission March 2002 Rebecca Chan, Industry CanadaSlide 1 Simulation on Aggregate Interference from Wireless Access Systems.
Doc.:IEEE m Submission January n Spectrum Mask Alignment Date: Slide 1 Authors: Bijoy Bhukania, Broadcom.
Contributions to SE43 Group – 11 th Meeting SE43(11)65 – Reference spatial geometries between WSDs and DTT- Rxs for the calculation of the maximum permitted.
A study on the coexistence between Direct Air to Ground Communication (DA2GC) and Radars in the 5 GHz band Peter Trommelen, Rob van Heijster, Arne Theil.
MCA ECC PT1 Meeting
UAS BLOS (satellite) Control and Non-Payload (CNPC) Communications
Channelization for HRb OFDM
Ultra Wideband UK Test Results Presented by John Mettrop UK CAA
A study on the coexistence between Direct Air to Ground Communication (DA2GC) and Radars in the 5 GHz band Peter Trommelen, Rob van Heijster,
LRTC 3.4 – 3.8 GHz Ericsson input PT1 XO 29 – 31/
Basic examples of setting simulations: A REAL CASE
Evaluation Model for LTE-Advanced
Basic examples of setting simulations: A REAL CASE
Point-to-Multipoint Broadband Opportunities in the MHz Band
5G Micro Cell Deployment in Coexistence with Fixed Service
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Preliminary Proposal for FHSS PHY for k]
GSM Base Station Antennas
Royal Institute of Technology Dept. of Signals, Sensors and Systems
Submission Title: Link Budget for m
Multimedia Training Kit
Inmarsat Position on WRC-19 Agenda Item 9.1 Issue 9.1.1
Presentation transcript:

Presentation to Radiocommunications Agency 16 June 2000 BFWAtg(00)39

Structure of the presentation u Scope and objectives of the study u Interference analysis (worst case) u Statistical modelling and analysis u Conclusions and recommendations

Objective of the Study u To determine co-existence requirements for BWFA services sharing the same spectrum in adjacent geographic areas

Scope u Identify the effect of modified interference criterion on co-ordination requirements –Interference limit 6dB below the noise floor u Identify the effect of applying different downtilts to PMP BSs on interference analysis u Identify the effect of different PMP cell sectorisation on interference analysis

Approach taken u Determine the modified co-ordination distances from the worst case scenarios u Statistical modelling to determine the effect of antenna downtilting on interference analysis u Statistical modelling to determine the effect of cell sectorisation on interference analysis

Interference Scenarios u PMP Base station to PMP base station u PMP Base station to subscriber station u Subscriber station to subscriber station u Subscriber station to PMP base station u Between very high density networks

Base to Base Co-ordination: u For reference base station, PFD limit at the service area boundary should not exceed: –95.5 dBW/MHz/m 2 at 42 GHz –99.5 dBW/MHz/m 2 at 28 GHz u Co-ordination distance from boundary is: –13.5 km at 42 GHz –21 km at 28 GHz

Subscriber station interference u With ATPC, LOS co-ordination distances from the service area boundary are: –7.5 km at 42 GHz –12.5 km at 28 GHz

Interference from very high density networks u Co-ordination distances are smaller due to smaller cells and lower EIRPs u To minimise co-ordination of individual stations, operators should avoid co-channel, co-polar operation within 5 km of adjoining service area boundaries

PMP BS antenna downtilt: 1 u Original analysis performed with downtilt equal to 9 degrees u In this study, the BS antenna downtilt was varied between 0 and 9 degrees u Monte Carlo statistical analysis conducted to determine the impact of different downtilts on interference environment

PMP BS antenna downtilt: 2 u Results of the study show that: –Interference from multiple PMP BS interferers operating in adjacent geographic area will be within the desired limits providing the BS antenna downtilt is not less than 8 degrees u Note: using different antenna RPE may have an impact on the conclusions

PMP cell sectorisation: 1 u Range of PMP cell sector widths modelled –30°, 60°, 90° and 120° sectors investigated u Statistical analysis conducted – Tx power adjusted to maintain EIRP level –Antenna RPE and gain adjusted –Other parameters maintained at the same level

u Statistical analysis has confirmed that: –There is a higher probability of suffering interference from PMP BS in adjacent geographic areas if wider sector cells are deployed –The highest probable interference levels for different sector widths deployed do not differ significantly PMP cell sectorisation: 2

–Providing the co-ordination requirements are satisfied, the interference levels experienced by adjacent geographic region BFWA station will be acceptable regardless of the PMP cell sector width deployed PMP cell sectorisation: 3

Conclusions: 1 u Co-ordination of individual stations required if boundary PFD exceeds: / dBW/MHz/m 2 at 42 GHz / dBW/MHz/m 2 at 28 GHz u Typical Line of Sight co-ordination distances: / 13.5 km at 42 GHz (4.5 km smaller than for the original interference criteria) / 21 km at 28 GHz (6.5km smaller than for the original interference criteria)

Conclusions: 2 u Typical subscriber LoS co-ordination distance, with ATPC: / 7.5 km at 42 GHz (2.5km smaller than for the original interference criteria) / 12.5 km at 28 GHz (3.5km smaller than for the original interference criteria) u Co-channel, co-polar operation should be avoided within 5 km of service boundary

Conclusions: 3 u Monte Carlo analysis has concluded that co-ordination requirements are valid: –If elevated PMP BS antennas are downtilted by 8° or more (providing an antenna complying with ETSI EN standards is used) –Regardless of the PMP cell sector width deployed in the range between 30° and 120°

Aegis Systems Ltd Balfour House Churchfield Road Walton-on-Thames Surrey KT12 2TD Tel: