Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.

Slides:



Advertisements
Similar presentations
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Advertisements

Update on EU Tariff Framework Guideline Richard Miller UNC Transmission Workgroup 03/10/2013.
1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
North / North West Region Regional Gas Initiative Regulatory Co-ordination Workshop 8 th February 2007.
European Developments Transmission Workgroup 5 th April 2012.
EU Developments Transmission Workgroup 3rd November 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Framework Guideline on gas capacity allocation Stefanie Neveling, Co-Chair CAM TF 20 th Madrid Forum, 27 September 2011.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
CMP PROPOSAL FOR HARMONISATION 17 th IG meeting Madrid 2 nd November 2011.
TITRE FG Interoperability & Data Exchange Rules Meeting guide 3 rd Ad Hoc Expert Group meeting Vienna, 11 June 2012.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EU Implementation Programme Action TR1003: All to consider how to address EU developments going forward and send any identified issues to:
EU Developments. September Update  ACER Framework Guidelines on interoperability rules  Scoping paper still to be published  Rather than conduct a.
EU Developments Transmission Workgroup 6th October 2011.
European Developments Transmission Workgroup 1 March 2012.
European Developments Transmission Workgroup 2 nd February 2012.
Report on ACER Progress An exchange of views with the Committee on Industry, Energy and Research of the European Parliament Brussels, 11 July 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
European Developments: Capacity Transmission Workgroup 6th October 2011.
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
EU Third Package: background and recent developments 15 th April 2010 UNC Panel European Strategy team.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
EUROPEAN COMMISSION Transparency – Proposal to amend chapter 3 of the Annex of Regulation 1775/2005 EUROPEAN COMMISSION H. Hick, DG TREN C 2 NW GRI 5th.
TSO progress towards ENTSOG IFIEC Energy Forum 22 Sep 2009 Jacques Laurelut GTE President & GTE+ Transition Manager.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Walter Boltz, Chairman ERGEG Gas Working Group 18 th Madrid Forum 28 September 2010 Pilot framework guideline on capacity allocation in natural gas transmission.
Framework Guideline on gas balancing Martin Crouch, Ofgem 20th Madrid Forum September 2011.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
David Halldearn 6 May Background Programme Board initial discussion last year at Stockholm Since then: Further analysis has been undertaken on.
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Gas Roads & GTE Colin Hamilton (European Policy) 2 nd July 2009.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
European Developments Transmission Workgroup 1 st December 2011.
European Developments Transmission Workgroup 3 rd May 2012.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren 20 th Madrid Forum, 26 Sept 2011.
EU Phase 3 Customer communications
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
New transparency guidelines
20th April 2016 Teleconference
EU Implementation Programme
18th July 2016 Teleconference
37th IG Meeting South Gas Regional Initiative
Update on European Network Codes
26th February 2015 Teleconference
37th IG Meeting South Gas Regional Initiative
18th July 2016 Teleconference
Gas balancing – where next
24th January 2017 Teleconference
37th IG Meeting South Gas Regional Initiative
26th February 2015 Teleconference
EUROPEAN TRANSPARENCY UPDATE
EU CAM Network Code and CMP Guideline Proposal Update
Presentation transcript:

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. European Developments Transmission Workgroup 7 th June 2012

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. EU Interoperability & Data Exchange Network Code Transmission Workgroup 7 th June 2012

3 The current position  ACER published Draft Framework Guidelines on 16 March  NG NTS submitted its written response covering all 7 FG themes on 16 May  This presentation provides a summary of that response

Key Messages  Restrict the FG to Interconnection Points only  Minimum harmonisation  Should be a net benefit to industry and consumers  Demanding timescale  Unique GB issues as an island nation

5 1. Interconnection Agreements ACER Proposals  Minimum set of requirements as a mandatory ‘model template’ covering TSO-TSO and TSO-Shipper elements  Standard Agreement as a default should TSOs not agree on content within 12 months  NRA involvement in approval of IAs & dispute resolution NG Response  GB IAs limited to TSO-TSO operational arrangements  TSO-Shipper rules best addressed in national network codes  Minimum list of items has merit but many parameters are IP-specific  NRA involvement should be proportionate and specific

6 2. Harmonisation of Units ACER Proposals  Lack of harmonisation could be a barrier to cross border trade  Harmonised units for energy, volume, pressure and gross Calorific Value NG Response  In general, lack of common units not a barrier to trade  Use of conversion tools is adequate in most cases  Common units may be desirable to support future commercial processes/data publication regarding IPs

7 3. Gas Quality ACER Proposals  Adjacent TSOs agree how to handle gas quality differences at IPs  TSOs to provide Users with ‘pertinent’ gas quality information  10 year Gas Quality Outlook by ENTSOG on possible changes in gas quality NG Response  Stronger role for NRAs in determining which differences require solutions  Provision of information should not be a pan – EU obligation on TSOs  ENTSOG may not have access to future gas quality information

8 4. Odourisation ACER Proposals  Cross border flows of non- odourised gas to be the default rule NG Response  NRAs to work with TSOs to explore options using CBA and safety assessment

9 5. Data Exchange ACER Proposals  Extend harmonisation to all common TSO-TSO, and TSO-counterparty data communications  Common, standardised messaging protocol and standards  Selection of solutions using CBA and following industry consultation NG Response  Gradual approach via ‘roadmap’ towards common solutions  Identify requirements that need to be serviced before solutions  Phased approach to implementation appropriate

10 6. Capacity Calculation ACER Proposals  Discrepancies between maximum capacities either side of an IP may cause barriers to trade  TSOs required to provide detailed description of capacity calculation methods  Adjacent TSOs to cooperate to reduce discrepancies  Code to define a procedure for dealing with discrepancies  ENTSOG to define timeline for discrepancy reduction and reporting role to ACER NG Response  Discrepancies to be expected and not a barrier  TSO incentives the key to maximising capacity

11 7. Cross Border Cooperation ACER Proposals  General obligation on TSOs to cooperate fully to achieve market integration  Regular ENTSOG reviews of TSO practices NG Response  Obligation not needed as already covered by Article 4 of the Gas Regulation

12 Next Steps Impact Assessment delivered to ACER Impact Assessment & final FG provided by ACER to Commission Code development by ENTSOG Mid June End July Sept 2012 – Sept 2013 ACER currently preparing ‘Evaluation of comments’ paper

Gas Balancing Update Transmission Workgroup 7 th June 2012

14 Gas Balancing Code Consultation  Balancing Draft Code and Consultation issued 13 April  The response deadline is 17:00 CET 12 June  The ENTSOG consultation and other documentation can be found at:  ENTSOG have requested that responses are:  Focused and succinct as possible and provide supporting evidence where available  Made via the formal consultation response form

EU CAM Network Code and CMP Guideline Update Transmission Workgroup 7 th June 2012

Capacity Allocation Mechanism (CAM) - Update  According to the 3 rd Package ACER need to provide an opinion on the CAM Code compliance with the Framework Guideline by 6 th June 2012  A number of meetings have been held between ENTSOG and ACER relating to the content of the CAM Code over the last two months  Discussions have been focused on:  Capacity duration of 15 years  How much Capacity is withheld for the medium and short term auctions (quotas)  The sale of unbundled capacity resulting from:  Technical Interconnection point mismatches  More Capacity already sold on one side of an IP  Additional incentive release

Capacity Allocation Mechanism (CAM) - Update  Inclusion of Tariffs in CAM Code  Establishing Virtual Interconnection Points (at two or more adjacent entry exit systems)  ACER’s opinion was discussed by the ACER Board of Regulators at its 22 nd May meeting  ENTSOG is preparing to move quickly on those issues formally raised by ACER.

Congestion Management Procedures (CMP) Guidelines - Update  CMP Guidelines agreed and approved by Member States at the 2 nd Comitology meeting on the 20 th April 2012  Currently undergoing Commission internal processes including the transposition into all Member States languages  Expectation that this will take until Sept 12  GB has to be compliant with the Guidelines by 1 st October 2013  National Grid are in conversation with Ofgem as to National Grids compliance with the CMP Guidelines.

EU Updates Timetable  Timetable aims to highlight the key items (consultations, workshops, decisions, etc.) National Grid NTS expect to cover via this agenda item in the forthcoming months TopicTX Workgroup Output from SJWS on TYNDP / Final ENTSOG TYNDP proposal July 2012