ExoMars UV Laser diode thermal vacuum test Alex Rousseau.

Slides:



Advertisements
Similar presentations
Solar Thermal Install …KR Construction Arroyo Grande Central Coast KR & Hayward Lumber Install.
Advertisements

ERA SOLAR PRODUCTS ERA Renewable Energy. Solar energy is the ultimate source of energy from millions of years and it is a renewable energy. This energy.
PX volt / 330 amp Alternator
Electrical and thermal testing at Glasgow and Liverpool.
Generic Cold box for ATLAS Upgrade Tracker Sensors Richard French 17/04/08 11:00ish ? My brain dump of stuff!
Ultra-Stable Lasers Supervisor Dr Randy Bartels Team Members Steven Dorlac, Andrew Wiersma, Daxsamuel Chitechi, Derrick Bernallie.
Palestine TV Test Jason Link University of Hawaii ANITA Collaboration Meeting at UCI 4/7/05 – 4/9/05.
Hot Embossing Microfabrication Hot Embossing is a technique of imprinting microstructures on a substrate (polymer) using a master mold (silicon tool).
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
Russ Rucinski, Fermilab, March 29, Commissioning is underway! –2 Cassettes installed on 3/18. –Sensors and control heater mounted. –Multi-layer.
Thermo-Cooler Controller Kiefer, Mary, Molly, Sam.
Molly, Gwyn, Sam, and Eric.  Fixed temperature sensor circuit- it works!  Successfully soldered a surface mount current sensor and tested it on a breadboard.
PRR TRD COOLING A. Marín (GSI) 7/01/2004 ALICE PRR TRD COOLING P.Glässel, A.Marín, V.Petracek, J.Stachel, M.R.Stockmeier, J.P.Wessels ALICE PRR TRD COOLING.
Status on the VELO sensors in the vacuum chamber Gwen & Ray 08/14/2007.
MUPUS Team Meeting, Graz, Oct-2013 A. Schaffer, G. Kargl, N. Kömle Space Research Institute Austrian Academy of Sciences Calibration strategy for.
Hydronic Mechanical Controls
Pump is Blue part (right) - timer is black (left side) New Electrical Outlet This Photo shows where the Re-Cir pump is installed on the Output line on.
DKTCOMEGA EDFA Product Line Jesper Broszka, Product Manager.
High Sensitivity Smoke Detection
Dogleg Thermal Tests : Configuration 7 6 AiN plate side Jan SM+LB 8 Dogleg side Heater (0.4W) flow 2 Temperature sensors located.
In-situ cryogenic nano-mechanical tests LN 2 or LHe in 77 K4 K Temperature controller (PID) : heater control Cold finger Indenter tip sample electron gun.
Engineer Training Cooler TJ8300 / TJ8500 Cooler. Engineer Training Cooler TJ8300 / TJ8500 Confidential 2 Introduction.
Scope To develop a interactive electronics control system and fabrication support to design a next Constant Climate Chambers. Existing product with heater,
Vacuum Workshop on Vacuum Systems for Synchrotron Light Sources, Barcelona, Installation and vacuum conditioning, 12 th and 13 th September 2005 L. Schulz.
FEE + ROC cooling S. Popescu CERN, U. Frankenfeld, H.R. Schmidt GSI.
Instrumentation and Controls Test Plan Review 17 th February 2012 Roy Preece (STFC RAL)
4/12/2011Controller Cooling Test1 Array Controller Cooling Test Bill Hoffmann April 12, 2011 This is a report on a test of the chilled water-to-air heat.
Tbilisi, 10/07/2014V. Carassiti, P. Lenisa 1. Tbilisi, 10/07/2014V. Carassiti, P. Lenisa2.
R&D activities in Florence Geppo Cagnoli INFN and U. of Glasgow WG2 & WG3 Meeting – 27 th Apr Firenze.
Hydrogen Pre-Operation Safety Review 4 th October 2011 Results from Helium Commissioning M Hills.
Nanonics CryoView 2000™ CryoView 2000™ Product Presentation.
Design and fabrication of electrical measurement system for microchannel plates (LAPD weekly group meeting) Feb Anil Mane, Qing Peng, Jeffrey Elam.
1 H. Pernegger/CERNIBL cooling review 15/5/2012 IBL Cooling Requirements H. Pernegger.
Eco-Winter Installation. – Step 1 – Mount Eco-bypass to water heater.
TEST PROCEDURE Testing the Controller Board, Power Supply Board, and Unit as a Whole.
System A collection of parts that perform a function.
Evaporation vs. Condensation, energy flow, Warming vs. Cooling
More Graphing Problems Soil vs. Water … then I will turn off the lights and measure how each one cools.
Modification of the 11T Dipole impregnation mould Impact on impregnation parameters Remy Gauthier,
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
RESEARCH AND DEVELOPMENT FOR FUTURE LHC SUPERCONDUCTING MAGNETS POINT SUR LA STATION D’ESSAIS préparé par Jean-Marc Gheller Steering committee –September.
RF-FOIL MOUNTING SCENARIO CHEMICAL ATTACK TOOLING PVC FLANGE - THE PVC FLANGE UPSIDE DOWN ON “TABLE”
Pierre Barroca ITK LAPP – Goals 2.Simulation 3.Prototype measurements 4.Setup 5.Results 6.Conclusions 1.Goals 2.Simulation 3.Prototype measurements.
Copyright © 2005 Heathkit Company, Inc. All Rights Reserved Automating and Integrating Residential Systems Presentation 7 – Closed Loop Control.
1 HMPID Project Assembly & Tests of CsI QE monitors: VUV-scanner and ASSET Milestone: December 2002.
Status of Vertical Test Stand at RRCAT P Shrivastava, P Mohania,D.Baxy, Vikas Rajput S C Joshi, S Raghavendra,S K Suhane RRCAT, Indore November 26, 2012.
Mitglied der Helmholtz-Gemeinschaft Status of day-one experiment commissioning at COSY Huagen Xu Goa, Mar
Group Status Report 2 MIDTERM Waste Heat Recovery from PV Panels.
New single-chip “box” to test laser soldering in vacuum WP6 meeting, 16/01/14.
S A Griffiths CM42 June 2015 Electrical & Control.
FIELDS MEP Thermal Vacuum Cycling iPER
Plans for this week Preparation of Master course ...
Gayle K. Martin November 14, 2016
General overview Place : Institue of Space Astrophysic (IAS, Orsay)
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
SPP FIELDS V1234 Thermal PSR
FIELDS SCM Thermal iPER
Development of the pellet target in ITEP
TEMPERATURE SENSOR LOCATIONS
Jason Link University of Hawaii
Technical Summary - ANL
November technical stop activities:
Input-Output-Process Demo
SNS PPU Cryomodule Instrumentation
Gattini Detector Installation
Primary Spectrometer & Sample Environment
Liquid Silicone Rubber Basics
SNS PPU Cryomodule Instrumentation
Diode Laser Experiment
Presentation transcript:

ExoMars UV Laser diode thermal vacuum test Alex Rousseau

Test setup Used ExoMars CCD test vacuum chamber. LN2 cooling with heaters backing off LN2. Fully automated thermal control system. Rotary vacuum pumped chamber (5x10 -3 mBar). Photodiode fixed to chamber viewport to measure UV laser diode output. Temperatures and photodiode output logged at 1 minute intervals.

Test equipment

Test setup (Cont.) UV laser diode assembly installed between two cold fingers and PID closed control loop temperature sensor installed on the laser diode mount (as close as possible to diode). Two temperature logging sensor installed on laser diode mount. Bench PSU connected through vacuum feed through for PCB V & I supply.

Laser diode installation in TV chamber

Test profile Cold non operational T: -150°C Hot non operational T: +50°C Hot operational T: +25°C Cold operational T: ≥60°C

Test results – thermal profile

Test results – UV Laser diode output vs temperature

Test results – UV Laser diode output at test points

Test results – UV Laser diode temperature transition rates