Ian Kirkman and Graham Cox July 29 th 2010. EMMA commissioning shifts so far June 21 st, 22 nd, 23 rd and July 12 th, 13 th, 14 th, 15 th “Analogue” BPM.

Slides:



Advertisements
Similar presentations
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 4 Computing Platforms.
Advertisements

1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
XFEL 2D Pixel Clock and Control System Train Builder Meeting, DESY 18 February 2010 Martin Postranecky, Matt Warren, Matthew Wing.
XFEL 2D Pixel Clock and Control System Train Builder Meeting, DESY 22 October 2009 Martin Postranecky, Matt Warren, Matthew Wing.
MMT Primary Mirror Actuator Test Stand Upgrade
Report Card P Only 4 files are exported in SAMS, but there are at least 7 tables could be exported in WebSAMS. Report Card P contains 4 functions: Extract,
HINS BPM Overview N. Eddy For Instrumentation Dept.
Operating Systems Operating Systems - Winter 2010 Chapter 3 – Input/Output Vrije Universiteit Amsterdam.
IK March 1st 2012 Slide 0 EMMA: Update on BPM modelling and mapping March 1 st 2012 Ian Kirkman.
IK Slide 0 First look at the WCM data from July 2012 September 6 th 2012 Ian Kirkman.
QR026 High Sensitivity VME Tuner Performance Data
©2004 Brooks/Cole FIGURES FOR CHAPTER 12 REGISTERS AND COUNTERS Click the mouse to move to the next page. Use the ESC key to exit this chapter. This chapter.
ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
IK/JJ May 6 th 2012 Slide 0 Results from EMMA Injection Line BPM-02 measurements on May 6 th 2012 Ian Kirkman, James Jones.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Testing and Development of Feed-Forward System for ATF2 A. Kalinin Accelerator Science and Technology Centre, Daresbury Laboratory, UK Fifth ATF2 Project.
The EMMA Turn-by-Turn BPM System A. Kalinin ASTeC Daresbury Laboratory STFC EMMA Commissioning Workshop Daresbury Laboratory, 21 May 2009.
EMMA Overview Ben Shepherd Magnetics and Radiation Sources Group ASTeC STFC Daresbury Laboratory.
1 Electrical and Computer Engineering Guitar Virtuos Justin D’Alessandro (EE) Jacob Dionne (CSE) Adam Montalbano (CSE) Jeffrey Newton (EE) Team Kelly Final.
NuMI MINOS The MINOS Far Detector Cosmic Rays and their neutrinos are being collected now. How does this work, and of what use is this data? Alec Habig,
Henrik Loos High Level 17 June 2008 High Level Physics Applications for LCLS Commissioning Henrik Loos.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
Polarized Source Development Run Results Riad Suleiman Injector Group November 18, 2008.
Parity Quality Beam (PQB) Study Injector Group November 10, 2008.
NLC Intra-Pulse Fast Feedback Simon Jolly Oxford University NLC Beam Delivery Meeting July 2001.
Beam phase and intensity measurement Grzegorz Kasprowicz Richard Jacobsson.
Feed forward orbit corrections for the CLIC RTML R. Apsimon, A. Latina.
1 FermiLab Recycler Ring BPM Upgrade Based on Digital Receiver Technology R. Webber, J. Crisp, P. Prieto, D. Voy, C. Breigel, C. McClure, M. Mengel, S.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
1 Online Calibration of Calorimeter Mrinmoy Bhattacharjee SUNY, Stony Brook Thanks to: D. Schamberger, L. Groer, U. Bassler, B. Olivier, M. Thioye Institutions:
BI day 2011 T Bogey CERN BE/BI. Overview to the TTpos system Proposed technical solution Performance of the system Lab test Beam test Planning for 2012.
Marc Ross Saturday, June 5, 2004 nanometer BPM status and plans.
January 19, 2006PEP TFB R.Akre PEP II Transverse Feedback System Ron Akre William Colocho Anatoly Krasnykh Vojtech Pacak Dmitry Teytelman Uli Wienands.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
The Main Injector Beam Position Monitor Front-End Software Luciano Piccoli, Stephen Foulkes, Margaret Votava and Charles Briegel Fermi National Accelerator.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
The ATF Damping Ring BPM Upgrade Nathan Eddy, Eliana Gianfelice-Wendt Fermilab for the ATF Damping Ring BPM Team.
Collimator BPM electronics – Results from the lab, SPS and LHC
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
1 ATF Instrumentation Status and Planning Justin May, Juan Cruz, Doug McCormick, Janice Nelson, Tonee Smith, John Wray 1.
1Ben ConstanceFONT Meeting 1st August 2008 ATF2 digital feedback board 9 channel board with replaceable daughter board (RS232 etc.) − Board will log data.
IMAC 2007BEPCII Timing System Status1 Event timing system for BEPCII storage ring commissioning Presented by G. Lei May 2007.
Intensity measurements using TRIC Juan Carlos Allica On behalf of: M. Andersen, D. Belohrad, L. Jensen, F. Lenardon, A. Monera, L. Søby 1.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
BPM Developments at Daresbury Laboratory A. Kalinin Ultra Bright Electron Sources Workshop The Cockcroft Institute, Daresbury,
Jitter Monitor – Overview and Status Report Glenn Christian, Alexander Kalinin 30 May 2005.
Timing System R+D for the NLC Josef Frisch. NLC and PEPII Phase and Timing Requirements (approximate)
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
Beam time structures 1 At any particular instance of time there will be only one kind of beam in the MI. It will be either protons or anti-protons. The.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
LCLS Commissioning & Operations High Level Software
Charge Measurements on VELA
Steps Towards Beam Commissioning: BPM System
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
The ELENA BPM System. Status and Plans.
Controls CBETA controls will extend existing EPICS control system
LCLS Commissioning & Operations High Level Software
ERL BPM System Mike Billing, Mark Palmer
Beam-Based Alignment Results
Feed forward orbit corrections for the CLIC RTML
A Virtual Implementation of VELA (CLARA)
VELA BPMs Alex Brynes.
High Level Physics Applications for LCLS Commissioning
Breakout Session SC3 – Undulator
Presentation transcript:

Ian Kirkman and Graham Cox July 29 th 2010

EMMA commissioning shifts so far June 21 st, 22 nd, 23 rd and July 12 th, 13 th, 14 th, 15 th “Analogue” BPM measurements taken on all dates using long cables fed from the front ends to the MCR and into an oscilloscope: Each cable provides e.g. L&R or U&D Some testing of reading the BPMs through the EPICS system was carried out on July 15 th Slide 1

Different BPM assemblies Types of pickups: Injection/Extraction Lines: UD/LR, circular/circular D=34mm; Ring: (1) UD/LR, circular/circular D=48mm; (2a) and (2b) UD/LR, circular/taped, two modifications; - UD/LR, taped/volume; - UU/DD, rectangular (77x26 mm) (near Septum & Kicker) [Alex Kalinin] Each assembly has been modelled separately using CST, with some bench testing for confirmation Results from modelling produce a “mapping”, relating the individual button signals to the actual x-y position of the bunch Slide 2

Contributions to errors Random: - Button noise (thermal): 43 µm at 16 pC – ultimate resolution [AK] - analogue: - cable noise - human error reading from an oscilloscope screen - EPICS: - cable noise between front ends and rack room - ADC - clock timing jitter Systematic: - physical/mechanical button offsets – can’t be modelled, must be laser surveyed or otherwise deduced (±250 µm) [INCOMPLETE] Slide 3

Estimation of uncertainty based on repeated measurements Slide 4

Example of x’ uncertainty Slide 5

BPMs through EPICS: tests on Slide 6

EPICS hardware available All required 21-Slot VME Crates + MVME 5500 processors (x7) 3 x Prototype VME interface cards 1 x Hand built production VME interface card Sufficient ADC and clock mezzanine cards to fully populate 4 VME interface cards 1 VME crate currently installed in the EMMA Rack room containing the 4 VME cards fully populated with clock and ADC mezzanine cards for development and testing of the EPICS data acquisition. Master reset timing signal derived from ALICE laser via delay generator feeding EMMA septum & kicker magnets Slide 7

EPICS software vxWorks device driver tested with EMMA beam (13-15 th July 2010) Basic EPICS input/output (raw pickup data) tested with EMMA beam (13-15 th July 2010) ADC clock delay and attenuation tested (13-15 th July 2010) Basic clock delay scanning and signal optimisation tested – MS Excel (13-15 th July 2010) BPM pickup and position calculation from EPICS data tested – MS Excel ( th July) BPM pickup and position calculation within EPICS implemented - to be tested with EMMA beam (29 th July) Full signal optimisation within EPICS to be implemented and tested (TBC) BPM database created - cell, number, type, fitting coefficients, offsets Program will be produced to graphically display x-y position for several BPMs in real time Slide 8

Plans for July 29th This evening (July 29 th ): Start with analogue procedure: - measure again the x,x’ at septum exit (or quad D entrance) with ring BPMs 1 and 2 (quads off), as so far - “parasitic” examination of IL BPMs 1 and 2 can proceed in parallel Ramp down and re-wire analogue cables to study betratron oscillations further down the ring In parallel to this analogue work, use EPICS system to read ring BPMs 1 and 2, and compare with the earlier measurements Slide 9

Continuing work Production VME cards being sent for testing by Wareworks They will set the clock delay (13.8 ns) between the 2 time multiplexed button signals (Alex will tweak these timings with bench tests when he returns) In situ testing/commissioning of production VME cards with EMMA beam Multiple turn EPICS data acquisition and data processing to be tested when EMMA ring complete EPICS automated signal optimisation (clock delay and attenuation) Development of GUI software for visualisation of data from EMMA BPM system Archiving of EPICS BPM data for future analysis Slide 10