 Mod 380 is the long term solution for AQ  Consider options for an interim solution  Investigating 3 options  Analysis will tell us which are feasible.

Slides:



Advertisements
Similar presentations
Presenters:- Steve Nunnington xoserve & Sallyann Blackett E.on Sallyann Blackett E.on Rolling AQ – A Straw Man.
Advertisements

Commercial in confidence Regional Collaboration – Fleet Management Project Progress Summary Duncan Kinnaird Project Lead.
Project Nexus Next Steps Xoserve/Large GT View – 6 December 2011.
PN UNC Workgroup 20/9/11 Requirements Definition to Delivery.
PN UNC Workgroup (AQ topic) Meeting 3, 18 th July 2011.
CFO Model December 2007 Bill Matthews A/Executive Director Government Accounting and Policy Office of the Comptroller General.
1 Project Smart Metering Portfolio Foundation & DCC Day 1 Updates April 2013.
Industry Shipperless & Unregistered Working Group Wednesday 18 th April 2012.
Senior Stakeholder Forum 04/02/2014. Agenda UK-Link Programme Update –Including Data Cleansing Update Nexus Modification Update Faster Switching EU Reform.
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
The AQ Operational Review Group ‘Mid-process’ Forum Via teleconference 4 th September 2014 “Whilst every effort is made to ensure the technical accuracy.
Subtitle etc Modification 0403 EU Third Package: 21 day switching with flexible objection period Anne Jackson October 2011.
Senior Stakeholder Forum Wednesday 19 th June 2013.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
UK Link Programme Dashboard Report Change Overview Board: 13/05/2014 Critical HLD activities complete enabling entry into Detailed Design Detailed Design.
UK Link Programme Update to PNUNC June 17 th 2013.
Generic & Enduring Functionality to Allow Xoserve to Confirm a Supply Point into a Shipper’s Portfolio UK Link Committee – April 2013.
Mod 270 Potential Options Rob Hill 15/02/2009. Six potential options following discussion at last months Development Workgroup OptionNameDescription 1Elective.
Distribution Network Interruption - Initialisation 28 September 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
PNISG Update June Xoserve’s UKLP Assessment Principles 1.Maintain current delivery plans where possible and appropriate e.g. don’t just push all.
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
1 New proposal extending the services created by Modification 279 historic asset and read data Modification 279 created an annual report (on request at.
Impacts of Mod 244 Steve Nunnington xoserve. Background  96.5% of transportation charges based on capacity.  These are dependent on historical throughput.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
CONFIDENTIAL - Mod Initial Business Rules © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Industry Dialogue on xoserve Services 14 th September 2007.
UK Link Technology Refresh
Background - Tolerance Rules
Proposer: BP Gas Marketing Ltd Panel Date: 17 April 2014
Modification th July 2008.
Overview XRN4665 is looking to add new EUC profiles for bands 01B & 02B New EUC profiles will be split based on Market Sector Code & Pre-Payment Meter.
Project Nexus Workgroup
Impacts of Project Nexus Implementation Date to AQ17
COR1072 Enduring Transfer and Trade Arrangements
‘BOAT CHART’ PROJECT WORKPLAN
Smart Metering Portfolio DCC Day 1 UK Link Committee DCC Day 1 Shipper File Format Representation Thursday 08th August 2013.
Potential Minor Release Drop 4 Timeline & Scope
Project Nexus Workgroup
UIG Task Force Progress Report
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
Release 3 Scope Selection and Plans
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
UIG Task Force Progress Report
Deferral of Retrospective Updates Functionality
UIG Task Force Progress Report
Project Nexus Workgroup
AQ BTU Form – Process & Timeline 29th September 2009
DN Interruption Phase II
Recommendations - where we are
AQ Threshold Analysis Steve Taylor Centrica plc.
Review Group 177 Rolling AQ.
CONFIDENTIAL - Inter Shipper Discussion Process Initial Discussions © 24 November 2009 EDF Energy plc. All rights Reserved.
UIG Task Force Progress Report
Modification Proposal 136
Actions Updates Action 0282/006 – Exclude from AQ process
COR3007: UNC MOD 450B – Monthly revision of erroneous SSP AQs outside the User AQ Review Period Implementation UK Link Committee – May 2014.
PN UNC Workgroup (AQ topic)
High Level System Solution Impact Assessment
High Level System Solution Impact Assessment
Shipper MI (Shipper Pack / PARR)– Update
Further Considerations
Change Management Committee
PAC 9th July 2019 Update Shipper MI Delivery Update
Presentation transcript:

 Mod 380 is the long term solution for AQ  Consider options for an interim solution  Investigating 3 options  Analysis will tell us which are feasible  Analysis still being undertaken on these options  Use of extended AQ Appeal Process  New managed AQ Appeal Process  AQ appeal mid year (Apr) Options for mid-year AQ Change

Enhanced AQ Appeals Process Extend appeals process to SSPs Use results of AQ trial Calc as a guide to largest AQ movers Use existing AQ mechanisms including re- confirmation process Need to ration numbers otherwise this would cause system constraints Potential for gaming exists

AQ Correction Process Once again results of Trial calc could be trigger Will apply to SSPs New process to automatically update AQ values rather than reconfirmation. Shippers to specify MPRNs that they wish to amend Xoserve to manage workflow to protect system Potential for gaming exists

Bi-annual AQ Review Undertake additional AQ Review April for LSPs and SSPs Extension of trial Calc May not include an AQ amendment facility therefore could lack control Analysis will take time to complete. Impacts on system capacity Issues with change effort and costs for a timebound solution May compromise delivery of full Mod 380 solution There may be gaming opportunities Value of the change (How much additional benefit from AQ correction process and at what cost?) Stability of SOQ.

What Next? What do Project Nexus stakeholders value? Xoserve will continue to analyse the options BUT – Don’t lose focus on the ‘End game’ We want to deliver Periodic AQ ASAP We will start analysis on Project Nexus requirements as soon as they are defined & signed off