CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc. All rights Reserved. 1.

Slides:



Advertisements
Similar presentations
PN UNC Workgroup (AQ topic)
Advertisements

Project Nexus (AMR) Workgroup – 7 th July 2010 Response to Transporter action.
PN UNC Workgroup 20/9/11 Requirements Definition to Delivery.
© 2007 E.ON Nexus AQ Requirements To support the current business processes We need to maintain performance and enable market operation as is using current.
PN UNC Workgroup (AQ topic) Meeting 3, 18 th July 2011.
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
AQ Appeals and the BTU form Chris Warner. 2 AQ Appeals and the BTU form  Presentation reflects NGD’s view of UNC regime as drafted and is intended to.
SPA Enquiry Process - Additional Requirements for AMR sites ICoSS Presentation.
21 May 2015 GAZ DE FRANCE ESS Mod 115 An alternative view Phil Broom Gaz de France ESS.
1 Project Nexus Market Differentiation Topic Workgroup 14 th & 15 th July 2009.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Project Nexus Workgroup Unique Sites 4 th November 2014.
CSEP Transportation Charges 11 th August Background Action NEX0604 from 18 th June PN UNC requested Xoserve to provide a presentation on how Supply.
Mod 0445 – Amendment to the Arrangements for Daily Metered Supply Point Capacity Ofgem Direction to Provide Further Evidence National Grid Distribution.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Project Nexus Workgroup AQ Backstop Date Options 7 th October 2014.
UNC G7.3.7 Invoicing Read Estimation Proposal Requirement for Read Estimation & Proposed Methodology Dean Johnson Distribution Workstream – 25 th August.
Project Nexus Workgroup Read Validation following Transfer of Ownership 13 th October
Performance Assurance 21 st May Value Chain. Value Chain Xoserve would like to propose an approach to further aid the development of the Performance Assurance.
11 User Pays User Committee 12th November Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Meter Read Validation 11 th August Background The meter read validation principles were developed under ‘The Settlement’ BRD and formed part of.
Mod 270 Potential Options Rob Hill 15/02/2009. Six potential options following discussion at last months Development Workgroup OptionNameDescription 1Elective.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Billing Operations Forum 24 July 2007 RbD Overview Billing Operations Forum 24 July 2007 RbD Overview Fiona Cottam.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Gas Distribution Transportation Charging What are the Risks to Pricing predictability? Stephen Marland Pricing Manager
1 Mod Review Group 126 Mar 2007 slides 126 Review Group – Restriction of Invoice Billing Period  The review proposal is primarily concerned with restricting.
PN UNC Workgroup Read Validation 4 th October 2011.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
Version PNUNC AQ Principles Workgroup Mod 0209 – Rolling AQ Presenter: Steve Nunnington 23 rd March 2010.
Replacement of Any Read – Initial views. 2 Assumptions  Can’t re-open NDM Allocation or Energy Balancing after D+5  Can’t go back to a read before prevailing.
Impacts of Mod 244 Steve Nunnington xoserve. Background  96.5% of transportation charges based on capacity.  These are dependent on historical throughput.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
UNC Modification Proposal 0380 Periodic Annual Quantity Calculation Calculation of Daily Supply Point Capacity Alan Raper – DNCMF 26 th September 2011.
CONFIDENTIAL - Mod Initial Business Rules © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Customer Treatment in project Nexus Presentation on behalf of GDF Suez By Gareth Evans.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
Project Nexus UNC Workstream Consolidation of High-Level Principles Fiona Cottam 19 May 2010.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
CONFIDENTIAL - Modification Proposal 0395 © 24 November 2009 EDF Energy plc. All rights Reserved. 1.
FGO: ASA Service Line Review
UNC Modification Proposal 0202 National Grid Distribution
Options for Mod 640 Replacement
Background - Tolerance Rules
Nexus Meter Read Performance April 2018
Rolling AQ Review Group 177.
UNC Mod Retrospective Invoice Limitation © 24 November 2009 EDF Energy plc. All rights Reserved.
Project Nexus Workgroup
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc
Demand Estimation - Non Loggable Meters: Issue
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
Actions for Mod209 Workgroup
Project Nexus Workgroup
Modification proposal 330
CONFIDENTIAL - Review Group 272 © 24 November 2009 EDF Energy plc
PN UNC AMR Topic Workgroup
MOD 640 INVOICING VALIDATION RULES
Modification 421 – Updates and Benefits Case
GT Response to Action AMR014 Project Nexus AMR Workgroup 20th July | Energy Networks Association.
Overview of RbD Risk Modelling 31 March 2008
Project Nexus Workgroup
Review Group 177 Rolling AQ.
CONFIDENTIAL - Inter Shipper Discussion Process Initial Discussions © 24 November 2009 EDF Energy plc. All rights Reserved.
Meter Reads.
PN UNC Workgroup (AQ topic)
Presentation transcript:

CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc. All rights Reserved. 1

2 Nexus AQ Options

CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc. All rights Reserved. 3 Allocation Outcomes 1.Allocation on D+1 meter readings -No need for an AQ from Shipper perspective -Estimated readings could be based on D+1 readings from other sites in same customer class -SOQ required for transportation charging purposes – could be based on weather corrected peak demand 2.Current Allocation process Improved -AQ could continue to form basis of estimation and allocation process -AQ should represent most up to date view of consumption

CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc. All rights Reserved. 4 Nexus AQ Requirements Transition Arrangements -Need to maintain arrangements for dumb meters -Ensure changes in consumption reflected in AQ -Rolling AQ as developed in 209 would facilitate this Enduring Arrangements (if AQ required) -CCP will deliver additional volumes of data -This should be used to ensure that AQ is as accurate as possible -Rolling AQ would facilitate this and improve initial energy allocation

CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc. All rights Reserved. 5