Third Energy Package for Change of Supplier 2009/73/EC.

Slides:



Advertisements
Similar presentations
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
Advertisements

Code Governance Review: WWU views on potential changes to UNC and the Modification Panel Simon Trivella – 30 th March 2010 Governance Workstream.
Review of NTS entry charge setting arrangements - IA 1 July 2010.
Presenters:- Steve Nunnington xoserve & Sallyann Blackett E.on Sallyann Blackett E.on Rolling AQ – A Straw Man.
EU 3 rd Package Clarification of points raised at Transmission Workstream 3/12/2009.
Project Nexus Next Steps Xoserve/Large GT View – 6 December 2011.
12/10/20141 Project Nexus Workgroup Settlement Issues 15 th May 2012.
PN UNC Workgroup 20/9/11 Requirements Definition to Delivery.
Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
Proposal to Change the UNC AQ ‘Backstop Date’ to accommodate the 2010 Seasonal Normal Review DESC – 2nd October 2009 NOTE: Instances where TBC is stated.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
1 Project Smart Metering Portfolio Foundation Updates June 2013.
Implementation of Non Effective Days Nexus Workgroup – March
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
Project Nexus Workgroup Unique Sites 4 th November 2014.
Subtitle etc Modification 0403 EU Third Package: 21 day switching with flexible objection period Anne Jackson October 2011.
Capacity trade and transfer mechanism and the next AMSEC auction Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 9 May 2007.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Provision of third party access to licence exempt electricity and gas networks Andy Pace 4 October | Energy Networks Association - DCMF.
EU 21 Day Switching. Contents Bank Holiday Challenge for 21 Day Switching Objection Window –Fixed Reduction –Variable Reduction Confirmation Window Reduction.
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Provision of third party access to licence exempt electricity and gas networks Tony McEntee 5 April | Energy Networks Association - DCMF.
CSEPs Reconciliation “Read Window” proposal. 2 Background  I&C CSEPs (supply point AQ >73,200) are subject to reconciliation  IGTs are obliged to provide.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –25 th February 2010 Distribution Workstream.
Code Governance Review UNC Modification Proposals Beverley Viney - National Grid NTS.
Agency Charging Statement Overview of Consultation 11 th February 2008.
ScottishPower, Energy Retail MOD 282 – Introduction of a process to manage Long Term Vacant Sites May 2010 Elaine Carr ScottishPower.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Datalogger / DMV Modification Proposals - Summary Simon Trivella – 26 th August 2010 Distribution Workstream - Elexon U P D A T E.
1 Smart Metering Foundation Stage February Agenda File Format Changes for Effective Switching Back Population Approach for Effective Switching.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights.
Industry Dialogue on xoserve Services 14 th September 2007.
PN UNC Workgroup Invoicing 10 th January Objectives of the Workgroups To determine business principles for future Invoicing processes –Consider/review.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Draft Modification Proposal: Population and Maintenance of Market Sector Code within Sites & Meters Simon Trivella –26 th November 2009 Distribution Workstream.
Stuart Forrest, Network Planning Manager, Scotia Gas Networks 19 th October 2010 MOD Review of Industry Charging & Contractual Arrangements in Relation.
User Pays User Committee 12th November 2013
Supply Point Register 7th December 2011
Supply Point Register 10th January 2012
Distribution Workgroup 24/11/16
ESB Networks AIP Programme
Code Governance Review UNC Modification Proposals
CSEP NExA Update Marie Clark ScottishPower 28th September 2006.
Must Read Process Guide For Shippers
DSC ChMC CSS update 7th November 2018
Amendment Invoice Task Force Progress Report
Project Nexus Workgroup
CSS Update for CoMC 19th September 2018
Exit Capacity Substitution and Revision
Joint Office Presentation for Modification 0678
CONFIDENTIAL - Title of presentation © 24 November 2009 EDF Energy plc
Project Nexus Workgroup
Meter Read Rejections ..
Transmission Workstream 05 November 2009
DSG Governance Group Recommendations.
Customer Issue Management Dashboard CoMC - July 2019
Customer Issue Management Dashboard CoMC - July 2019
DSC ChMC Switching Programme Update 11th September 2019
DSC CoMC Switching Programme Update September 2019
XRN Enabling large scale utilisation of Class 3 – MOD0700
Customer Issue Management Dashboard CoMC
Presentation transcript:

Third Energy Package for Change of Supplier 2009/73/EC

The requirement  European directive to ensure that customers can switch their gas supply within 3 weeks.  In the majority of cases, current industry processes allow transfer for all customers within 3 weeks

Work to date  A number of options have been proposed to facilitate a 3 week switch for all customers.  ‘Option 8’ suggested that if Bank Holidays were treated as business days then 3 weeks would always be achievable.  At the last Workstream meeting (5th January 2011) xoserve were tasked to look further at the potential impacts of Option 8:  “SPA non-business-days not recorded in xoserve systems" and UNC changed to permit all consequences.

Option Impact Analysis so far Numerous processes use the SPA non-business-days. Analysis to date has demonstrated that 85 processes would be affected by removal of this data. The consequences of these impacts are a mix of both “desired impacts ”, i.e. required for, or consistent with, implementation of the EU directive, and “undesired impacts”, i.e. not required to implement the EU directive. Many non-SPA impacted processes have not been analysed yet. Notable potential side affects / “undesired” impacts identified so far are…  OPNT estimate generated too early (M.3.8.5)  OPNT reads rejected incorrectly that are within the UNC window (M.3.8.2, M.3.8.3, M.3.8.4)  Network / xoserve Query performance will be calculated incorrectly.  Reduced timescales for manual management of reads  Reduced timescales for Shippers to submit reads to avoid Must Read charges  Reduced timescales to record asset changes, risking payment of excess liabilities

Option Implementation Analysis so far  Impact on exceptional processing normally run on Bank Holidays.  Analysis incomplete, but key finding so far is that AQ Review process schedule relies on system availability on the August Bank Holiday  Feasibility of backing out the system changes already made to include Bank Holidays for 2011  Currently we believe that 1 week plus 30 business days lead-time is required ahead of the earliest bank holiday that needs removing from xoserve systems  The Project timeline to implement is…  Complete detailed impact analysis of Option 8  Industry confirmation of Option 8  Drafting, review and approval of MOD for Option 8  Implementation of Option 8, including project governance, mobilisation, test case definition and test case execution. Timescales for implementation will be subject to…  Priorities and resource availability and the time the change order is received  Magnitude of process impact identified by the detailed impact analysis  No changes are required to existing processes apart from their scheduling

EU directive / UNC issues When does “three weeks” end?  Option 8 assumes that current minimum UNC transfer period meets the EU Directive  UNC transfer period of 15 business days means the transfer effective date is the day following the end of the three week period  Is this acceptable? Weekends - when does “three weeks” start?  DECC documents suggest that the 3 week period begins the day after the cooling off period concludes.  Currently, if a shipper submits a confirmation on a Saturday or Sunday, D-15 is the following Monday  In this scenario, Option 8 would not provide compliance.

The following demonstrates these issues CC – End of Cooling off 3WS – 3 week start RQ – Confirmation requested CO – Confirmation confirmed 3WE – 3 week end LI – Confirmation live

DECC Documents  Documents published 14th January 2011 gave some further clarity on expectations of the 3 week switching timescales.  DECC state that the requirement is for as many customers as possible to be able to switch within 3 weeks.  They state that suppliers and other market participants need to be involved to achieve this goal.  Ofgem are to lead a piece of work to put together a programme of proportionate change with a view to increasing the number of customers able to switch supplier within 3 weeks.

DECC document references The statements on the previous slide are supported by the following quotes from recently issued DECC documents DECC – Government Response  1.4 “Suppliers will need to make adjustments to their systems to ensure that as many customers as possible are able to switch within three weeks (after the end of any cooling-off period for domestic consumers). In doing so, we would expect the suppliers to work proactively with other suppliers and market participants and their customers…”  1.5 “Ofgem will be leading work with the suppliers in the next few months to put together a programme of proportionate changes with a view to increasing the number of customers who are switched within three weeks. “  1.10 “A licence requirement on all suppliers to take reasonable steps to improve their systems and processes so as to increase the speed at which customers switch. An obligation on the incumbent supplier and Gas Transporter to co- operate with the new supplier to enable the transfer.”  1.12 “Ofgem will lead a programme of work to provide the industry with guidance on the steps needed to improve their systems and processes so that more customers are able to switch within the new timescales” DECC - Impact Assessment  Description: “Suppliers to be required to make improvements to their systems and processes to ensure that as many people as possible are able to switch within these timescales”  Total Transition: “1 year”

DECC Documents - 2 Detailed Business Rule clarification From DECC – Government Response  Introduction: “The requirements of the Directives must be transposed into domestic legislation by 3 March 2011”  5.22  “The obligation to switch customers within 3 weeks will start the day after the contract is entered into, unless a cooling-off period applies, in which case it starts after the cooling- off period expires (provided this does not exceed 14 calendar days).  To enable a new supplier to comply with the obligation to switch the customer within 3 weeks, operators of exempt distribution networks will be expected to take all reasonable steps to ensure that the new supplier is able to start supplying the customer within the relevant period.”

Options identified to date…  Treat Bank Holidays as working days*  Reduce the 7 day “objection window”*  Remove the “objection” process from supply point confirmation process.*  Reduce “confirmation” window.*  Confirm the supply point during 14 day cooling off period.*  Incumbent shipper to withdraw – allowing confirmation to take place in D-8.  Suppliers using same shipper organisation can update Transporter systems via “SUN” file within D+1. * System changes required.