DCMF Treatment of pre 2005 generation – DNO position Nigel Turvey 29 April 2010 1 | Energy Networks Association.

Slides:



Advertisements
Similar presentations
1 ITU Interconnection Workshop 17 August 2001 Role of the Regulator K S Wong Office of the Telecommunications Authority Hong Kong, China.
Advertisements

July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
New EU Rules on Derivatives Trading The EMIR Reporting Technical Standards Victoria Cooley OTC Derivatives & Post Trade Policy Financial Conduct Authority.
11 Ofcom Consumer Switching final statement Next steps for BT Bev Bytheway-Jackson WBC Product Manager 10 th February 2014.
Update on IDNO/DNO working group DCMF 12 November 2009.
Third Energy Package for Change of Supplier 2009/73/EC.
Charging Methodology Development Oliver Day © Copyright EDF Energy plc. All rights reserved. HV/LV Generation Charging April 2008 Oliver Day Distribution.
Generation Use of System Charges Nigel Turvey. Background Regulatory incentive allows: Recovery of a percentage of any reinforcement costs A value per.
1 Attributing the costs of health & social care Research & Development – Understanding AcoRD Trudi Simmons Senior Manager – Research Finance & Programmes.
3 June 2010 energynetworks.org 1 SPEN Pre 2005 DG Draft Modification Report currently with Ofgem Proposed methodology for charging pre April 2010 EHV generators.
CE Electric UK – Potential developments in long-term charging arrangements and IDNO charging methodologies 1 April 9, 2008 Potential developments in long-term.
EDCM update Mo Sukumaran (on behalf of CMG)
A DNO Perspective by Stephen Parker for Structure of Charges Workshop 15 July 2003.
2015/16 changes to the winter time-of-use peak periods and tariff charge name changes.
June 2003 Structure of Electricity Distribution Charges Next Steps Martin Crouch Director, Distribution.
Update from DCUSA DCUSA Secretariat 16 August | Energy Networks Association - DCMF.
July 2003 Structure of Electricity Distribution Charges Welcome and Introduction Charles Gallacher Deputy Director, Scotland.
5 February 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
Retail Energy Forum Andrew Neves Central Networks - CMG Chair 2 March | Energy Networks Association.
Congestion Management by distribution FEBEG POSITION Meeting FEBEG-VREG ( )
John Zammit-Haber National Grid
Towards Regional Independent Operators – a main driver for successful market integration.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Charging Methodology Development Oliver Day © Copyright EDF Energy plc. All rights reserved. Charging Methodology Update April 2008 Oliver Day Distribution.
1 st April 2010 energynetworks.org 1 Common Methodology Group Work PRESENTED BY Tony McEntee, ENW Workstream 4 Update Common Connection Charging Methodology.
18th May 2009 energynetworks.org 1 A PRESENTATION BY ERIKA MELÉN OF THE ENERGY NETWORKS ASSOCIATION Report from the ENA/ERA Theft of Energy Working group.
EHV generation charging methodology change Harvey Jones.
19 March 2010 energynetworks.org 1 PRESENTED BY Nigel Turvey Workshop on Distributed Generation Connected pre April March 2010.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Considerations for EHV charges for April 2010 María Isabel Liendo SP Energy Networks DCMF, 04 June 2009.
03 April 2009 energynetworks.org 1 Common Methodology Group Work Presentation from Workstream 4 Review of the Connection Charging Boundary in the CDCM.
1 EHV DG Charging Nigel Turvey. 2 Background Our current EHV charging methodology was not vetoed on 18 th February 2010 with the following treatment of.
Provision of third party access to licence exempt electricity and gas networks Andy Pace 4 October | Energy Networks Association - DCMF.
Energy Suppliers Forum CDCM/EDCM - CMG Update Mo Sukumaran – CMG 10 November | Energy Networks Association.
Mod 214 – Reservation of firm NTS Exit Capacity at new NTS Exit Points in the transitional period Steve Rose.
ElectraLink Update on DCUSA Activities. Charging Methodology CP Summary StatusCDCMEDCMCCCMBilling WG: Pre Consultation10 (DCP 133, 159, 160, 161, 165,
1 FINANCIAL ACCOUNTING Lecture 3. 2 Learning Outcomes To classified the accruals principles, prepayments and accruals, bad debts, and the provision of.
Update from DCUSA Michael Walls DCUSA Secretariat 04 August | Energy Networks Association - DCMF.
Provision of third party access to licence exempt electricity and gas networks Tony McEntee 5 April | Energy Networks Association - DCMF.
National Grid UK Distribution Update Gas Customer Forum 29 th January 2007 Kerri Matthews.
Energynetworks.org 1 PRESENTED BY Andrew Neves, Chair CMG CMG and Workstream Update.
DCUSA Update ElectraLink. Charging Methodology CP Summary StatusCDCMEDCMCCCMBilling WG: Pre Consultation8 (DCP 133, 158, 159, 160, 161, 163, 165, 168)
DN Interruption Reform Distribution Workstream 23 rd July 2009.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
11 December 2008 energynetworks.org 1 Common Methodology Group Work PRESENTED BY GEORGE MORAN, CENTRAL NETWORKS, ON BEHALF OF WORKSTREAM 2 Presentation.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Managing Exceeded Capacity. 10 September The Issue of Exceeded Capacity DNO Connection Charging Methodologies: customers who increase Maximum Capacity.
EDCM update Mo Sukumaran On behalf of DNOs ( WSB Chair) 1 December | Energy Networks Association - DCMF.
Structure of Charges Year-end review for DCMF 22 November 2007.
Customer Charge On behalf of all DNs 25 October 2010.
Update from DCUSA Michael Walls DCUSA Secretariat 06 October | Energy Networks Association - DCMF.
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
GVC Group Update Andy Pace 6 October | Energy Networks Association - DCMF.
January 24, 2016 energynetworks.org 1 The SoC Project A PRESENTATION BY THE REGULATION GROUP OF THE ENERGY NETWORKS ASSOCIATION PRESENTED BY ANDREW NEVES.
EDCM update Andrew Neves CMG Chair 2 June | Energy Networks Association - DCMF.
DCMF SIG terms of reference Harvey Jones Elizabeth Lawlor 2 December | Energy Networks Association - DCMF.
Structure of Charges: Update and next steps DCMF 10 September 2008.
Industry Dialogue on xoserve Services 14 th September 2007.
Demand Side Management Andy Pace 6 October | Energy Networks Association - DCMF.
CAP169 02/04/09. 2 Today  Agree Terms of Reference  Timetable going forward  Discussion of Part 1 and Part 2 Finalise and agree  Discussion of Part.
12 November energynetworks.org 1 PRESENTED BY MO SUKUMARAN, ON BEHALF OF WSB Presentation from Workstream B Pricing Modelling (EDCM/CDCM) Common.
7th DCMF on 19th June Connection Boundary Review Network charges comprise Connection Charges and ongoing Use of System (UoS) charges. The Connection.
CMG and Workstream Update
Transitional Exit Capacity Proposals -Update
Transmission Workgroup 4th October 2012
Holistic view of Charging Modifications – In flight 11th June 2018
The Necessary Criteria for a UNC Modification Proposal
Ofgem presentation to Gas Transmission Workstream
Modification Proposal 136
Proposer: Steve Mulinganie, Gazprom Energy Panel Date: 20th June 2019
Presentation transcript:

DCMF Treatment of pre 2005 generation – DNO position Nigel Turvey 29 April | Energy Networks Association

Treatment of pre 2005 generation DPCR5 removed the exemption on pre April 2005 DG from paying use of system charges Some DNOs made modification applications earlier this year to integrate pre and post 2005 DG Ofgem requested that these were withdrawn to facilitate an Ofgem consultation on these issues Ofgem consulted on these issues between 21/07/2010 and 01/09/2010 There was a meeting between Ofgem and DNOs to ensure a common understanding of the issues needing decisions/guidance on 7 th September 29 April | Energy Networks Association

Treatment of pre 2005 generation There are three key issues that need decisions/guidance: –Principles that should be followed in deciding whether compensation is due and if so how it should be calculated –If compensation is due, whether this should be an unbundled ‘one-off’ payment to the generator or whether it should be a bundled discount to a use of system charge –From what date should charges apply to pre April 2005 EHV generators Ofgem issued a decision on the second of these on 23 rd August requiring an unbundled solution The third issue was referred to in the decision letter on EDCM timelines issued on 22 nd September which stated ‘Distributed generators (DG) connected at EHV who connected on pre-April 2005 terms will be subject to the arrangements for DG customers that will come into effect on the revised implementation date of 1 April 2012.‘ 29 April | Energy Networks Association

Treatment of pre 2005 generation DNO position on compensation is as follows: Operations and maintenance uplift –Generators connected under pre April 2005 arrangements generally paid a lump sum intended to cover the operations and maintenance overheads in relation to incremental connection equipment –These are costs that are incurred on an ongoing basis rather than one off associated with the connection of the generator –Hence, double charging of these ongoing costs will occur when DUoS charges also recover O&M costs –For this reason we believe that arrangements are needed to refund the unexpired proportion of capitalised O&M charges 29 April | Energy Networks Association

Treatment of pre 2005 generation Connection and reinforcement cost –Different treatment of generators connected under pre April 2005 arrangements and post April 2005 arrangements has occurred –This does not involve discrimination as the charging structure in place at any time treats all generators connected at that time the same –Non discrimination does not require the same charging structure to remain in place indefinitely –Hence there is no discrimination that needs to be addressed for these one-off costs of connection in contrast to the ongoing costs of remaining connected covered by the O&M uplift 29 April | Energy Networks Association

Treatment of pre 2005 generation Proposed DNO position on compensation is as follows: Operations and maintenance uplift –We believe that arrangements are needed to refund the unexpired proportion of capitalised O&M charges Connection and reinforcement cost –There is no discrimination that needs to be addressed for these one-off costs of connection 29 April | Energy Networks Association

Treatment of pre 2005 generation We await Ofgems decisions on what, if anything should be compensated for We also require Ofgem to consider and decide on: –a practicable compensation scheme (e.g. if reinforcement is to be compensated for, how to retro-apply apportionment rules; missing records, etc) –a uniform national basis for compensation (many DG parties are national operators, so should not face widely varying local interpretations) –Clear, definite and secure arrangements for DNOs to recover all compensation paid (in DPCR6 or otherwise) Ofgem are currently seeking further information from DNOs on the detailed arrangements concerning each pre 2005 generator Some DNOs have, where necessary, started to seek changes to contractual arrangements between DNOs and generators to facilitate charging once decisions has been made 29 April | Energy Networks Association