Energynetworks.org 1 PRESENTED BY MARÍA ISABEL LIENDO, SCOTTISH POWER, ON BEHALF OF WORKSTREAM 2 Cost and Benefit allocation to DG under the CDCM 11 December.

Slides:



Advertisements
Similar presentations
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
Advertisements

Some potential issues with the CDCM Franck Latrémolière CDCM review workshop, 17 May 2011.
The Tools for Environmental Sustainability in the UK Keith Barnham Physics Department, Imperial College London Oxford Research Group.
Background T&SC V9.0: The Market Operator shall not grant the status of Under Test for the purposes of this Code to Autonomous Generator Units, Pumped.
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
All-Island Energy Market Forum James Hutchinson Head of Electricity Markets Ofreg Drogheda 12 March 2004.
Balancing Update Stakeholder Group Meeting - 4 November 2009.
Generation Dominated Areas Oliver Day 5 April | Energy Networks Association - DCMF.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Charging Methodology Development Oliver Day © Copyright EDF Energy plc. All rights reserved. HV/LV Generation Charging April 2008 Oliver Day Distribution.
Generation Use of System Charges Nigel Turvey. Background Regulatory incentive allows: Recovery of a percentage of any reinforcement costs A value per.
Electricity distribution and embedded renewable energy generators Martin Scheepers ECN Policy Studies Florence School of Regulation, Workshop,
11 December 2008 energynetworks.org 1 PRESENTED BY GEORGE MORAN, CENTRAL NETWORKS, ON BEHALF OF WORKSTREAM 3 Fixed Time Period DUoS Charging 11 December.
3 June 2010 energynetworks.org 1 SPEN Pre 2005 DG Draft Modification Report currently with Ofgem Proposed methodology for charging pre April 2010 EHV generators.
CE Electric UK – Potential developments in long-term charging arrangements and IDNO charging methodologies 1 April 9, 2008 Potential developments in long-term.
Update from DCMF MIG Update from the Distribution Charging Methodologies Forum (DCMF) Methodologies Issue Group (MIG) 3 December | Energy Networks.
EDCM update Mo Sukumaran (on behalf of CMG)
Energy. oil and natural gas  supply 62% all energy consumed worldwide  how to transition to new sources?  use until mc of further use exceeds mc of.
Planning, optimization and regulatory issues
A DNO Perspective by Stephen Parker for Structure of Charges Workshop 15 July 2003.
Update from DCUSA DCUSA Secretariat 16 August | Energy Networks Association - DCMF.
Structure of Distribution Charges A User’s perspective David Tolley Innogy & Npower.
July 2003 Structure of Electricity Distribution Charges Welcome and Introduction Charles Gallacher Deputy Director, Scotland.
Retail Energy Forum Andrew Neves Central Networks - CMG Chair 2 March | Energy Networks Association.
Methodologies for Quantifying Energy Security in the Power Sector William Blyth 24 th April 2005.
Apex Paris - October UK and European Renewable Energy trends and implications for energy markets Philip Wolfe Renewable Energy Association
Utah Schedule 37 Update June 25, Schedule 37 Background Schedule 37 – Published rates for standard power purchase agreements with qualifying facilities.
Charging Methodology Development Oliver Day © Copyright EDF Energy plc. All rights reserved. Charging Methodology Update April 2008 Oliver Day Distribution.
1 Transmission Development at Ameren and in the Midwest ISO Mid-America Regulatory Conference Maureen A. Borkowski June 8, 2010.
Update from DCUSA Elizabeth Lawlor DCUSA Secretariat 01 December | Energy Networks Association - DCMF.
1 Impact of Distributed Generation on Voltage Profile in Deregulated Distribution Systems By: Walid El-Khattam University of Waterloo, Canada
RS 232 Standard Then Signal State Voltage Assignments - Voltages of -3v to -25v with respect to signal ground (pin 7) are considered logic '1' (the marking.
G3 Update to DCMF 22nd November Significant progress made Consultation on common methodology - May Stakeholder workshop - June Summary of responses.
Net Metering Fall 2009 Customer Meetings. What is Net Metering?  Net metering allows the meter to “run backwards” and record generation in excess of.
1 Distributed Energy Resources: Bringing Energy Closer to Home Presentation by the Industry Task Force on Distributed Generation July 28, 2005.
EHV generation charging methodology change Harvey Jones.
19 March 2010 energynetworks.org 1 PRESENTED BY Nigel Turvey Workshop on Distributed Generation Connected pre April March 2010.
Considerations for EHV charges for April 2010 María Isabel Liendo SP Energy Networks DCMF, 04 June 2009.
03 April 2009 energynetworks.org 1 Common Methodology Group Work Presentation from Workstream 4 Review of the Connection Charging Boundary in the CDCM.
1 EHV DG Charging Nigel Turvey. 2 Background Our current EHV charging methodology was not vetoed on 18 th February 2010 with the following treatment of.
17 May 2011 Generation Dominated Areas Oliver Day UK Power Networks (on behalf of DNOs) 1 | Energy Networks Association.
Energy Suppliers Forum CDCM/EDCM - CMG Update Mo Sukumaran – CMG 10 November | Energy Networks Association.
ElectraLink Update on DCUSA Activities. Charging Methodology CP Summary StatusCDCMEDCMCCCMBilling WG: Pre Consultation10 (DCP 133, 159, 160, 161, 165,
Update from DCMF MIG Simon Yeo Chair – DCMF MIG 01 December | Energy Networks Association - DCMF.
Jeroen de Joode (ECN/Delft University of Technology) Michiel van Werven (ECN) An analysis of potential bottlenecks Optimal Design of Future Electricity.
Update from DCUSA Michael Walls DCUSA Secretariat 04 August | Energy Networks Association - DCMF.
Update from DCUSA Michael Walls DCUSA Secretariat 02 February | Energy Networks Association - DCMF.
DCUSA Update ElectraLink. Charging Methodology CP Summary StatusCDCMEDCMCCCMBilling WG: Pre Consultation8 (DCP 133, 158, 159, 160, 161, 163, 165, 168)
September 21, 2005 ICF Consulting RGGI Electricity Sector Modeling Results Updated Reference, RGGI Package and Sensitivities.
DCUSA Update ElectraLink. The following Change Report are due to be presented to the DCUSA Panel at its meeting on Wednesday 16 January 2013: DCP 143.
11 December 2008 energynetworks.org 1 Common Methodology Group Work PRESENTED BY GEORGE MORAN, CENTRAL NETWORKS, ON BEHALF OF WORKSTREAM 2 Presentation.
Structure of Charges Year-end review for DCMF 22 November 2007.
15 February 2006 TPCR second consultation: gas offtake Offtake Arrangements Workstream 15 February 2006.
CDCM Annual Review Workshop Mo Sukumaran SSEPD (on behalf of DNOs) 17 May May | Energy Networks Association - CMG.
Update from DCUSA Michael Walls DCUSA Secretariat 06 October | Energy Networks Association - DCMF.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
EDCM update Andrew Neves CMG Chair 2 June | Energy Networks Association - DCMF.
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
Transmission arrangements for distributed generation DCMF 9 April 2008 Pre consultation document.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Update from DCMF MIG Claire Campbell Chair – DCMF MIG 02 February | Energy Networks Association - DCMF.
4 June 2009 energynetworks.org 1 Common Methodology Group Work PRESENTED BY OLIVER DAY ON BEHALF OF WORKSTREAM 3 Workstream 3 Tariff Application.
Schmitt Trigger Circuits. Op Amps Previously in ET1 we investigated the Operational Amplifier. The Op Amp consisted of V in V out A feedback loop O V.
7th DCMF on 19th June Connection Boundary Review Network charges comprise Connection Charges and ongoing Use of System (UoS) charges. The Connection.
GRID INTEGRATION COST OF PHOTOVOLTAIC POWER GENERATION G. Strbac, D. Pudjianto, P. Djapic, J. Dragovic Energy Futures Lab.
GSR022: Review of Security and Economy Required Transfer Conditions
DISPERSED GENERATION INFLUENCE ON FAULT PASSAGE INDICATOR RESPONSE
G5/4 Sub-group Update.
The Road to Zero: Energy System Challenges and Opportunities
Generation Dominated Areas(GDA)
Presentation transcript:

energynetworks.org 1 PRESENTED BY MARÍA ISABEL LIENDO, SCOTTISH POWER, ON BEHALF OF WORKSTREAM 2 Cost and Benefit allocation to DG under the CDCM 11 December 2008

energynetworks.org 2 Background One of the main drives for the SoC project is to develop cost-reflective charges which recognise the benefits that DG bring to the network. Ofgem’s Appendix 2 guidelines: implementation HV/LV: Assignation of F-factors DG yardsticks Interaction with EHV charging

energynetworks.org 3 Assignation of “F” factors Depends on type of generation: intermittent or non- intermittent For non-intermittent generation, F-factor depends on the number of units For intermittent generation, F-factor depends on the “persistence” time (the period of continuous generation assumed to be needed for system security). ER P2/6 identifies 5 types of non-intermittent generation and 2 types of intermittent generation. Tariff per voltage level  need for a balance between simplicity and cost reflectivity.

energynetworks.org 4 F-factors, non-intermittent generation WS2 initial proposals for non-intermittent generation Group non-CHP generators and assign F-factor of CCGT CHP generators assigned F-factors of gas turbine CHP

energynetworks.org 5 F-factors, intermittent generation WS2 initial proposals for intermittent generation P2/6 demand group thresholds are ignored (para 1.55) Persistence value equivalent to “switching” (3 hours) Tidal, wave, photovoltaic… (?)

energynetworks.org 6 DG yardsticks Under this proposal, generation is considered to offset demand and provide benefits by deferring reinforcements at higher voltage levels Does this apply at the voltage of connection too?

energynetworks.org 7 Consideration to be given to: F-factors. Right balance simplicity (number of tariffs) vs cost- reflectivity? Should the group consider fuel type instead of technology (for non-intermittent generators)? Is the grouping of the technologies correct? For the DG yardsticks, should the benefits at the level of connection be considered too?

energynetworks.org 8 Interaction with EHV charging Application of ER P2/6 at EHV and HV/LV for pricing is different. For EHV, Ofgem’s guidelines specify that “the level of demand expected to contribute to network security as set out in ER P2/6”. For generators in a Demand Group > 12 MW there is no benefit, as no contribution to system security Persistence factor assumed greater than “pricing” assumptions for HV/LV. Whereas for HV/LV, Ofgem’s guidelines specify that any P2/6 thresholds should be ignored.

energynetworks.org 9 Is it acceptable to have potential cross-voltage pricing signals? Possible solutions Consideration to be given to: