Generation Use of System Charges Nigel Turvey. Background Regulatory incentive allows: Recovery of a percentage of any reinforcement costs A value per.

Slides:



Advertisements
Similar presentations
Números.
Advertisements

Allocating Capacity and Costs of New Transmission November 7, 2007 Portland, OR.
5.1 Rules for Exponents Review of Bases and Exponents Zero Exponents
PDAs Accept Context-Free Languages
In-Home Pantry Inventory Updated: November Background and Methodology Background In 1996 a National Eating Trends (NET) pantry survey found that.
05 July 2010 EDCM Stakeholder Workshop. © 2007 E.ON Agenda Background and timeline Overview CDCM / EDCM boundary Locational charging and FCP Pricing model.
EuroCondens SGB E.
Worksheets.
Slide 1Fig 25-CO, p.762. Slide 2Fig 25-1, p.765 Slide 3Fig 25-2, p.765.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Add Governors Discretionary (1G) Grants Chapter 6.
CALENDAR.
1 1  1 =.
1  1 =.
CHAPTER 18 The Ankle and Lower Leg
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
2.11.
The 5S numbers game..
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
The basics for simulations
An Introduction to International Economics
Some potential issues with the CDCM Franck Latrémolière CDCM review workshop, 17 May 2011.
Background T&SC V9.0: The Market Operator shall not grant the status of Under Test for the purposes of this Code to Autonomous Generator Units, Pumped.
July 2003 Structure of Electricity Distribution Charges Update and Proposals Martin Crouch Director, Distribution.
The Pecan Market How long will prices stay this high?? Brody Blain Vice – President.
1 Equity in School Lunch Pricing (Section 205) Howard Leikert Supervisor School Nutrition Programs March 22, 2011.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Progressive Aerobic Cardiovascular Endurance Run
Capacity to Customers (C 2 C)- Review of Standards – Accommodating Responsive Demand in ER P2/6 24 th January 2013.
Review of NTS entry charge setting arrangements - IA 1 July 2010.
Generation Dominated Areas Oliver Day 5 April | Energy Networks Association - DCMF.
DCMF Treatment of pre 2005 generation – DNO position Nigel Turvey 29 April | Energy Networks Association.
Energynetworks.org 1 PRESENTED BY MARÍA ISABEL LIENDO, SCOTTISH POWER, ON BEHALF OF WORKSTREAM 2 Cost and Benefit allocation to DG under the CDCM 11 December.
Charging Methodology Development Oliver Day © Copyright EDF Energy plc. All rights reserved. HV/LV Generation Charging April 2008 Oliver Day Distribution.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Facebook Pages 101: Your Organization’s Foothold on the Social Web A Volunteer Leader Webinar Sponsored by CACO December 1, 2010 Andrew Gossen, Senior.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
When you see… Find the zeros You think….
Before Between After.
Electricity distribution and embedded renewable energy generators Martin Scheepers ECN Policy Studies Florence School of Regulation, Workshop,
THE NATIONAL GALLERY STRUCTURE CHART As at 30 JUNE 2010.
3 June 2010 energynetworks.org 1 SPEN Pre 2005 DG Draft Modification Report currently with Ofgem Proposed methodology for charging pre April 2010 EHV generators.
CE Electric UK – Potential developments in long-term charging arrangements and IDNO charging methodologies 1 April 9, 2008 Potential developments in long-term.
EDCM update Mo Sukumaran (on behalf of CMG)
Static Equilibrium; Elasticity and Fracture
Resistência dos Materiais, 5ª ed.
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
A DNO Perspective by Stephen Parker for Structure of Charges Workshop 15 July 2003.
July 2003 Structure of Electricity Distribution Charges Welcome and Introduction Charles Gallacher Deputy Director, Scotland.
Charging Methodology Development Oliver Day © Copyright EDF Energy plc. All rights reserved. Charging Methodology Update April 2008 Oliver Day Distribution.
EDCM submission workshop Andrew Neves CMG Chair 12 May | Energy Networks Association - CMG.
G3 Update to DCMF 22nd November Significant progress made Consultation on common methodology - May Stakeholder workshop - June Summary of responses.
EHV generation charging methodology change Harvey Jones.
19 March 2010 energynetworks.org 1 PRESENTED BY Nigel Turvey Workshop on Distributed Generation Connected pre April March 2010.
1 EHV DG Charging Nigel Turvey. 2 Background Our current EHV charging methodology was not vetoed on 18 th February 2010 with the following treatment of.
ElectraLink Update on DCUSA Activities. Charging Methodology CP Summary StatusCDCMEDCMCCCMBilling WG: Pre Consultation10 (DCP 133, 159, 160, 161, 165,
Delivering Connections and Capacity RIIO-T1 and associated commercial changes - Summary June 7th 2012.
Energynetworks.org 1 PRESENTED BY Andrew Neves, Chair CMG CMG and Workstream Update.
11 December 2008 energynetworks.org 1 Common Methodology Group Work PRESENTED BY GEORGE MORAN, CENTRAL NETWORKS, ON BEHALF OF WORKSTREAM 2 Presentation.
Open letter on Development of the regime ahead of winter 2007/8 Nienke Hendriks Head of Gas Transmission Policy, Enforcement and Compliance 28 June 2007.
The EDCM proposals A summary of Ofgem’s consultation Ynon Gablinger 2 June 2011.
Update from DCUSA Michael Walls DCUSA Secretariat 06 October | Energy Networks Association - DCMF.
EDCM update Andrew Neves CMG Chair 2 June | Energy Networks Association - DCMF.
Estimation of Long Run Capacity Costs Gas TCMF 26 th April 2006.
7th DCMF on 19th June Connection Boundary Review Network charges comprise Connection Charges and ongoing Use of System (UoS) charges. The Connection.
Modification Proposal 0283 Update
Transmission Workgroup 4th October 2012
NTS Entry Charging Review Update
Presentation transcript:

Generation Use of System Charges Nigel Turvey

Background Regulatory incentive allows: Recovery of a percentage of any reinforcement costs A value per kW of generation connected An allowance for the O&M costs on the sole use and reinforcement assets The incentive applies to generation connected post April 2005 or to incremental additions to existing generators made post April 2005 This results in a positive allowed revenue from generation

Existing Position For generators connected at EHV: LRIC methodology applies which can result in positive or negative charges Continue to be cost reflective and do not need further amendment For generators connected at HV/LV: Charges calculated from yardsticks which have characteristics derived from demand data Originally set using cost data used in the last price control settlement Concerns raised whether this approach is cost reflective and whether there are benefits not being reflected in the charges For microgeneration: Charges set to zero At existing low level of activity neither costs nor benefits have been identified and zero charge continue to be appropriate

Proposed method for HV/LV generator charges - Data

Proposed method for HV/LV generator charges - principles Generation tends to be widely dispersed Unlikely that benefits (or cost not recovered in connection charges) will be seen at voltage of connection Some benefit likely at higher voltage levels due to the impact of multiple higher load factor generators For consistency with security standards, benefits will not be applied to intermittent generation Yardstick constructed including: negative coincidences at voltage levels above the voltage of connection (for high load factor generators) zero coincidence at the voltage level of connection Positive service connection costs

Proposed method for HV/LV generator charges - scaling Proposed method will result in negative export yardsticks whilst allowed revenue is positive Whilst scaling to a positive allowed income will reduce the pricing signals it will reflect a recovery of other costs not in DRM yardsticks Scaling by a £/kW adder will be required Scaling to required revenue will result in low load factor generators (generally renewable) having higher UoS charges than at present The only way to prevent this would be to recover some allowed generation revenue from demand – this would require Ofgem’s agreement

Proposed method for HV/LV generator charges – resulting charges South WalesSouth West Existing ChargeProposed ChargeExisting ChargeProposed Charge Microgeneration £0No Change£0No Change Profiles 5 to p/MPAN/day??6.49p/MPAN/day?? LV > 60% Load Factor 2.01p/kVA/day p/kVA/day 1.67p/kVA/day p/kVA/day LV < 60% Load Factor 5.85p/kVA/day4.43p/kVA/day HV > 60% Load Factor 2.49p/kVA/day 0.37p/kVA/day 1.74p/kVA/day -2.68p/kVA/day HV < 60% Load Factor 5.75p/kVA/day4.14p/kVA/day EHV-4.51 to +2.25p/kVA/day No Change to +1.77p/kVA/day No Change

Some examples – low voltage connections South WalesSouth West Existing annual charge Proposed annual Charge Existing annual Charge Proposed annual Charge 250kVA Demand, 30%LF 20% of units at night £11,104No change£9,810No Change 250kVA landfill generator operating at 70% LF £1,834£-10,870£1,524£-11, kVA windfarm operating at 30% LF £1,834£5,340£1,524£4,044

Some examples – high voltage connections South WalesSouth West Existing annual charge Proposed annual Charge Existing annual Charge Proposed annual Charge 1MVA Demand, 30%LF 20% of units at night £25,313No change£22,627No change 1MVA landfill generator operating at 70% LF £9,089£1,340£6,351£-9,794 1MVA windfarm operating at 30% LF £9,089£20,987£6,351£15,117

Proposed method for HV/LV generator charges - timetable Draft modification report prepared Expecting to issue a WPD consultation to get users views shortly Modification request to Ofgem June/July Implementation April 09