Tony Doyle - University of Glasgow PPARC Review Timeline 0. PPARC Call (February 2003) 1.GridPP2 Proposal (30/5/03) 2. Feedback from Reviewers 3. Responses.

Slides:



Advertisements
Similar presentations
S.L.LloydATSE e-Science Visit April 2004Slide 1 GridPP – A UK Computing Grid for Particle Physics GridPP 19 UK Universities, CCLRC (RAL & Daresbury) and.
Advertisements

Tony Doyle GridPP – From Prototype To Production, HEPiX Meeting, Edinburgh, 25 May 2004.
S.L.LloydGridPP Collaboration Meeting Introduction Slide 1 GridPP - Introduction Welcome to the First GridPP Collaboration Meeting Introduction A brief.
Tony Doyle GridPP2 Proposal and Responses to Questions, Grid Steering Committee, Coseners, 28 July 2003.
GridPP9 – 5 February 2004 – Data Management DataGrid is a project funded by the European Union GridPP is funded by PPARC GridPP2: Data and Storage Management.
GridPP4 – Revised Plan Implementing the PPAN recommendations.
Tony Doyle - University of Glasgow GridPP EDG - UK Contributions Architecture Testbed-1 Network Monitoring Certificates & Security Storage Element R-GMA.
Tony Doyle GridPP2 – Project Specification, GridPP9 Collaboration Meeting, Edinburgh, 4 February 2004.
Tony Doyle Executive Summary, PPARC, MRC London, 15 May 2003.
Welcome to the 12 th GridPP Collaboration Meeting Introduction Steve Lloyd, Chair of the GridPP Collaboration Board Report on recent meetings of: PPARC.
Your university or experiment logo here What is it? What is it for? The Grid.
Partner Logo Tier1/A and Tier2 in GridPP2 John Gordon GridPP6 31 January 2003.
Tony Doyle GridPP2 Specification Process Grid Steering Committee Meeting, MRC, London, 18 February 2004.
Partner Logo UK GridPP Testbed Rollout John Gordon GridPP 3rd Collaboration Meeting Cambridge 15th February 2002.
S.L.LloydGridPP Collaboration Meeting IC Sept 2002Slide 1 Introduction Welcome to the 5 th GridPP Collaboration Meeting Steve Lloyd, Chair of GridPP.
1Oxford eSc – 1 st July03 GridPP2: Application Requirement & Developments Nick Brook University of Bristol ALICE Hardware Projections Applications Programme.
S.L.LloydGridPP9 IntroductionSlide 1 Introduction Welcome to the 9 th GridPP Collaboration Meeting Dissemination Officer GridPP2 Posts Tier-2 Centres Steve.
UK Agency for the support of: High Energy Physics - the nature of matter and mass Particle Astrophysics - laws from natural phenomena Astronomy - the.
GridPP Presentation to PPARC Grid Steering Committee 26 July 2001 Steve Lloyd Tony Doyle John Gordon.
Tony Doyle Overview of UK Development and Deployment Programme, LCG PEB Meeting, CERN, 16 September 2003.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP24 Collaboration Meeting.
Tony Doyle GridPP2 Proposal, BT Meeting, Imperial, 23 July 2003.
GridPP From Prototype to Production David Britton 21/Sep/06 1.Context – Introduction to GridPP 2.Performance of the GridPP/EGEE/wLCG Grid 3.Some Successes.
S.L.LloydGridPP CB 4 December 2003Slide 1 Agenda 1.Minutes of Previous Meeting (19 Feb 2003) 2.Matters Arising 3.Announcements (Steve) 4.GridPP2 Proposal.
15 May 2006Collaboration Board GridPP3 Planning Executive Summary Steve Lloyd.
18 th Mar’03Nick Brook – University of Bristol1 GridPP2 bid Nick Brook University of Bristol Timescales Draft outline Envelope What is expected from expts.
Nick Brook University of Bristol The LHC Experiments & Lattice EB News Brief overview of the expts  ATLAS  CMS  LHCb  Lattice.
Deployment Board Introduction David Kelsey 29 Oct 2004
EGEE statement EU and EU member states major investment in Grid Technology Several good prototype results Next Step: –Leverage current and planned national.
D. Britton Preliminary Project Plan for GridPP3 David Britton 15/May/06.
2 GridPP2 Budget David Britton, 4/12/03 Imperial College.
Tony Doyle “GridPP2 Proposal”, GridPP7 Collab. Meeting, Oxford, 1 July 2003.
S.L.LloydGridPP CB 29 Oct 2002Slide 1 Agenda 1.Introduction – Steve Lloyd 2.Minutes of Previous Meeting (23 Oct 2001) 3.Matters Arising 4.Project Leader's.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP Vendor Day 30 th April.
GridPP Steve Lloyd, Chair of the GridPP Collaboration Board.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
GridPP9 – 5 February 2004 – Data Management DataGrid is a project funded by the European Union GridPP is funded by PPARC WP2+5: Data and Storage Management.
CMS Report – GridPP Collaboration Meeting VI Peter Hobson, Brunel University30/1/2003 CMS Status and Plans Progress towards GridPP milestones Workload.
D. Britton Collaboration Board Meeting David Britton 16/Jul/07.
D. Britton GridPP Status - ProjectMap 22/Feb/06. D. Britton22/Feb/2006GridPP Status GridPP2 ProjectMap.
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
Tony Doyle GridPP – From Prototype To Production, GridPP10 Meeting, CERN, 2 June 2004.
INFSO-RI Enabling Grids for E-sciencE SA1: Cookbook (DSA1.7) Ian Bird CERN 18 January 2006.
LCG and HEPiX Ian Bird LCG Project - CERN HEPiX - FNAL 25-Oct-2002.
12th November 2003LHCb Software Week1 UK Computing Glenn Patrick Rutherford Appleton Laboratory.
1 st EGEE Conference – April UK and Ireland Partner Dave Kant Deputy ROC Manager.
3 June 2004GridPP10Slide 1 GridPP Dissemination Sarah Pearce Dissemination Officer
Organisation Management and Policy Group (MPG): Responsible for setting and policy decisions and resolving any issues concerning fractional usage, acceptable.
John Gordon CCLRC e-Science Centre LCG Deployment in the UK John Gordon GridPP10.
SouthGrid SouthGrid SouthGrid is a distributed Tier 2 centre, one of four setup in the UK as part of the GridPP project. SouthGrid.
GridPP Deployment & Operations GridPP has built a Computing Grid of more than 5,000 CPUs, with equipment based at many of the particle physics centres.
Tony Doyle - University of GlasgowOutline EDG LCG GSC UK Core Grid GridPP2 EGEE Where do we go from here? Operations.
InterGrid Meeting 7 Oct 2001 Tony Doyle. Tony Doyle - University of Glasgow GridPP Status  Financial Background  Deliverables  Recruitment  Regional.
Bob Jones Technical Director CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
GridPP Presentation to AstroGrid 13 December 2001 Steve Lloyd Queen Mary University of London.
GridPP Building a UK Computing Grid for Particle Physics Professor Steve Lloyd, Queen Mary, University of London Chair of the GridPP Collaboration Board.
GRID IIII D UK Particle Physics Tony Doyle - University of Glasgow GridPP Status Report  Executive Summary  News  “Unfunded” EU DataGrid Posts  Shadow.
Tony Doyle - University of Glasgow 8 July 2005Collaboration Board Meeting GridPP Report Tony Doyle.
E-Science Research Councils awarded e-Science funds ” science increasingly done through distributed global collaborations enabled by the Internet, using.
LHC Computing, SPC-FC-CC-C; H F Hoffmann1 CERN/2379/Rev: Proposal for building the LHC computing environment at CERN (Phase 1) Goals of Phase.
J Jensen/J Gordon RAL Storage Storage at RAL Service Challenge Meeting 27 Jan 2005.
Slide § David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP delivering The UK Grid.
18/12/03PPD Christmas Lectures 2003 Grid in the Department A Guide for the Uninvolved PPD Computing Group Christmas Lecture 2003 Chris Brew.
Bob Jones EGEE Technical Director
Regional Operations Centres Core infrastructure Centres
SA1 Execution Plan Status and Issues
Ian Bird GDB Meeting CERN 9 September 2003
Collaboration Board Meeting
LHC Computing, RRB; H F Hoffmann
Presentation transcript:

Tony Doyle - University of Glasgow PPARC Review Timeline 0. PPARC Call (February 2003) 1.GridPP2 Proposal (30/5/03) 2. Feedback from Reviewers 3. Responses from the PMB See 4. Projects Peer Review Panel (14-15/7/03) 5. Grid Steering Committee (28-29/7/03) See 6. Tender Document (11/11/03) See 7. Science Committee (17-18/11/03) 8. PPARC (25/11/03) 9. CB (4/12/03)

Tony Doyle “GridPP – Internal Tender Process”, Collaboration Board, London, 4 December 2003

Tony Doyle - University of GlasgowOutline Context: –GridPP Status –Testbed –GridPP2 Operations Tendering: –Introduction –Areas –Proforma –Allocations –EGEE –General Points –Procedure –Outcomes

Tony Doyle - University of Glasgow GridPP Status Report: The Project Map (v 18)

Tony Doyle - University of Glasgow GridPP Status: Summary GridPP1 has now completed 2 ex 3 years 42 of 44 metrics are currently satisfied 126 of 182 tasks are complete Reflects many successes.. 3 tasks are currently overdue: –LCG test suite completion (confirmation required) –BaBar use of Tier-A (3 month delay) –UK infrastructure (test of a heterogeneous testbed) 2 dissemination metrics are not OK: –Dissemination of GridPP work via demonstrations (7 ex 8 target workshops) –e-Science interactions (17 ex 20 recorded interactions)

Tony Doyle - University of Glasgow Testbed Status (3/12/03) UK-wide development using EU-DataGrid tools (v1.4x). Deployed during Sept Currently being upgraded to v2: IC and RAL via RB OK See

Tony Doyle - University of Glasgow GridPP2 Operations To move from testbed to production, GridPP plans a bigger team with a full- time Production Manager Manpower will be from the Tier-1 and Tier-2 Centres who will contribute to the Production Team The team will run a UK Grid which will be part of EGEE/LCG and also support other experiments Tagged release selected for certification Certified release selected for deployment Tagged package Problem reports add unit tested code to repository Run nightly build & auto. tests Grid certification Fix problems Application Certification Build System Certification Testbed ~40CPU Production Testbed ~1000CPU Certified public release for use by apps. 24x7 Build system Test Group WPs Unit Test Bui ld Certificati on Producti on Users Development Testbed ~15CPU Individual WP tests Integratio n Team Integration Overall release tests Releases candidate Tagged Releases Releases candidate Certified Releases Apps. Representative s

Tony Doyle - University of Glasgow Conclusions from GridPP8 Meeting Visible progress this year in GridPP1 Management via the Project Map and Project Plan High level tasks and metrics: under control Major component is LCG –We contribute significantly to LCG and our success depends critically on LCG Middleware components on critical path w.r.t. LCG adoption Deployment – high and low level perspectives merge via monitoring/accounting Resource centre and experiment accounting are both important Today’s operations in the UK are built around a small team Future operations planning expands this team: Production Manager being appointed Middleware deployment focus on Information Service performance Security (deployment and policy) is emphasised “Production Grid” will be difficult to realise: need to start GridPP2 planning now (already underway) GridPP2 proposal: formal feedback in November Transition period for: –Middleware/Security/Networking Groups –Experiments Phase II –Production Grid Planning

Tony Doyle - University of GlasgowIntroduction Funding for the GridPP2 project is now known (see Dave’s slides) We need to develop a detailed plan To avoid a period of uncertainty we have released the GridPP2 Tender Document Post priorities were discussed within the PMB and were presented to PPARC for various funding scenarios Science Committee and PPARC have now approved GridPP2 - sufficient to fund the “regained programme” The funding is conditional upon our engagement in the EGEE/LCG programmes The PMB requests approval for the following internal tender process from the CB

Tony Doyle - University of Glasgow Four Tendering Areas The document contains tables that show the PMB- approved allocation of effort in four areas: 1.Application Interfaces 2.Middleware/Security/Networking 3.Tier-2 centres 4.Tier-1/A Centre Internal deadlines such that outcomes are known in Jan- February These deadlines were agreed for all areas except for: –hardware support for the Tier-2 centres where a date in ~March is foreseen (see Steve’s talk) –UK’s contribution to LCG since LCG started later than GridPP1 Note that the Tier-1/A Centre planning also refers to EGEE Production across the UK EGEE starts in April 2004

Tony Doyle - University of Glasgow Four Proforma 1.Review of existing posts: to be completed by all Principal Investigators examining the post(s) effectiveness (A requirement of the original grants) 2.Project definition: the project deliverables are to be confirmed or updated by the area contacts (This defines the programme of work planned in the 3-year period from September 04) 3.Tender: describes how effort at a given institute can meet these (updated) project deliverables 4.Assessment: input from the PMB to the PRSC

Tony Doyle - University of Glasgow Application Interfaces [FTE] Applications –18 FTEs: ongoing programme of work can continue –Difficult to involve experiment activity not already engaged within GridPP Project needs to build on cross- experiment collaboration GridPP1 already has experience –GANGA: ATLAS & LHCb –SAM: CDF & D0 –Persistency: CMS & BaBar Encourage new joint developments across experiments

Tony Doyle - University of Glasgow Middleware, Security and Network [FTE] Information Services [4+4 FTE] and Networking [ FTE]: strategic roles within EGEE Security expands to meet reqts. Data and Workload Management continue No further configuration management development programme defined by –mission criticality (experiment requirements driven) –International/UK-wide lead –leverage of EGEE, UK core and LCG developments Redefine (EDG-based) UK Work Packages into five Development Groups ActivityCurrent Planning Security3.5 Info-Mon.4.0 Data & Storage4.0 Workload1.5 Networking3.0 TOTAL16.0 Security Middleware Networking

Tony Doyle - University of Glasgow Tier-2 Services [FTE] Four Regional Tier-2 Centres London: Brunel, Imperial College, QMUL, RHUL, UCL. SouthGrid: Birmingham, Bristol, Cambridge, Oxford, RAL PPD. NorthGrid: CCLRC Daresbury, Lancaster, Liverpool, Manchester, Sheffield. ScotGrid: Durham, Edinburgh, Glasgow. Hardware provided by Institutes GridPP provides added manpower Current Planning Y 1Y 2Y 3 Hardware Support Core Services4.0 User Support Specialist Services Security1.0 Resource Broker1.0 Network0.5 Data Management2.0 VO Management Existing Staff-4.0 GridPP Total SY 40.0

Tony Doyle - University of Glasgow Tier-1/A Services [FTE] High quality data services National and International Role UK Focus for International Grid development Highest single priority within GridPP2 Current Planning CPU 2.0 Disk 1.5 AFS 0.0 Tape 2.5 Core Services 2.0 Operations 2.5 Networking 0.5 Security 0.0 Deployment 2.0 Experiments 2.0 Management 1.5 Total 16.5

Tony Doyle - University of GlasgowEGEE An additional 9.5 FTEs for Operations and Support will be funded via EGEE to establish a Production Grid across the UK This area is being led by RAL (as agreed at the CB) Note EGEE will also fund: –Information Services (RAL) [4+4FTE] –Training (Edinburgh) [4+4] –Networking (UCL) [ ] {with linked funding from elsewhere} Core Infrastructure Centre and Regional Operations Centre for the UK and Ireland: includes Operations and Support 4 FTEs for EGEE Tier-2 Coordinators reporting to the Production Manager (joint appointments funded via CCLRC)

Tony Doyle - University of Glasgow Operational Roles Core Infrastructure Services (CIC) –Grid information services –Monitoring services –Resource brokering –Allocation and scheduling services –Replica data catalogues –Authorisation services –Accounting services Still to be defined fully in EGEE Core Operational Tasks (ROC) –Monitor infrastructure, components and services –Troubleshooting –Verification of new sites joining Grid –Acceptance tests of new middleware releases –Verify suppliers are meeting SLA –Performance tuning and optimisation –Publishing use figures and accounts

Tony Doyle - University of Glasgow RAL has led project to develop LCG Operations… –Monitoring –Contacts –SLAs –Security Policy –LCG Security Coordinator

Tony Doyle - University of Glasgow Tier 0 and LCG: Foundation Programme Aim: retain UK influence Ensure development programmes are linked Project management: GridPPLCG Shared expertise: LCG establishes the global computing infrastructure Allows all participating physicists to exploit LHC data Proposed funding determined based on: –Recently increased funding at CERN supporting LCG (recognition of Grid importance within the LHC programme) –Appropriate share for the UK –Requirements of LCG Phase 2 –Past GridPP1 contribution Required Foundation: LCG Fabric, Technology and Deployment

Tony Doyle - University of Glasgow General Points 1.All post-holders must report back at 3-monthly intervals (using similar reporting mechanisms to those used for the majority of GridPP posts). 2.All GridPP2 posts will end on Aug 31st Existing posts that are renewed will commence at the end-date of the present grant. Thus, many GridPP2 posts will run for less than three full years. This should be anticipated in the work programmes described. 3.A review of posts will be made prior to this end point, in order to determine their effectiveness within the GridPP2 programme.

Tony Doyle - University of Glasgow Procedure for Internal Tendering I We ask you to respond [via to Steve Lloyd] according to the proforma with deadlines of 12 noon on the dates noted below. 1.Current Principal Investigators: the deadline for submission of completed Proforma-1 is Friday 12th December. 2.Contact People: the deadline for submission of completed Proforma-2 is Wednesday 17th December. These will be made available via the web by Friday 19th December. 3.Proposed Principal Investigators: the deadline for submission of completed Proforma-3 is Friday 9th January. 4.PMB Members: the deadline for submission of completed Proforma-1 Evaluation Reports is Friday 9th January.

Tony Doyle - University of Glasgow Accelerated Procedure for Internal Tendering An accelerated procedure is necessary for Information Services in order for a CCLRC recruitment process to be initiated in time for EGEE start-up on 1 st April Completed drafts of two proforma have been received by the PMB, with the third received in confidence by DB, TD, NG and SL. Based on next week’s PMB assessment of this input, a letter will be sent to enable CCLRC recruitment prior to the meeting of the PRSC Further feedback on the input will be included as part the PRSC process We request CB approval for this accelerated procedure

Tony Doyle - University of Glasgow Procedure for Internal Tendering II The GridPP Peer Review Selection Committee (PRSC) will meet after Monday January 12th and determine priorities and allocations according to this input. The recommendations of the PRSC will be subject to approval by the PPARC e-Science Director. Results will be communicated to all Institutes as soon as possible after the PRSC meeting. For approved posts at Universities, a JES form should be submitted directly to Guy Rickett at PPARC with an agreed specific spine point for current staff or for a spine point 11 post with end point August 31st For approved posts at CCLRC, funding will be via the PPARC-CCLRC Service Level Agreement, referring to the agreed GridPP2 deliverables and services. Posts will be renewed or appointed within an agreed pay band with end point August 31st 2007.

Tony Doyle - University of Glasgow Proforma-1: GridPP1 Review Note that this information will be extracted prior to evaluation by the PMB

Tony Doyle - University of Glasgow Proforma-2: Future Plans The contact persons should circulate drafts based upon the proposal and subsequently submit: 1.a brief (1-2 pages) overview of the work you envisage in the GridPP2 period including any connection to work done in GridPP1; 2.explicitly defined deliverables, including dates, for the GridPP2 period; This should be based on the input you gave to the GridPP2 proposal but you have the freedom to change plans at this point. The granularity of these deliverables should be roughly one or two every 6 months per FTE of effort 3.if applicable, the proposed arrangements for leading the area and meeting the deliverables agreed between a consortium of institutes.

Tony Doyle - University of Glasgow Proforma-3: Bid from Institutes 8

Tony Doyle - University of Glasgow Proforma-4: Proforma-1 Evaluation Report

Tony Doyle - University of GlasgowOutcome By the end of this process we will be able to: –Continue the work started in GridPP1 (by many people) –Define the GridPP2 Project Map tasks and metrics –Appoint additional staff in recognised areas to contribute to agreed tasks –Contribute fully to EGEE –Start to go from Prototype to Production Beyond this, we anticipate a transition after GridPP2 in the PPARC Road Map where these areas are supported within the Particle Physics Programme