PART B SPACE PRODUCT ASSURANCE esa Soldering Course

Slides:



Advertisements
Similar presentations
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Advertisements

© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
UNITED NATIONS Shipment Details Report – January 2006.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
Document #07-12G 1 RXQ Customer Enrollment Using a Registration Agent Process Flow Diagram (Switch) Customer Supplier Customer authorizes Enrollment.
Document #07-2I RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) (mod 7/25 & clean-up 8/20) Customer Supplier.
FACILITIES & EQUIPMENT
RECORD KEEPING Cooperative Development of Operational
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
for Cabin Safety Inspectors
1 Welcome Safety Regulatory Function Handbook April 2006.
1 Introducing the Specifications of the Metro Ethernet Forum MEF 19 Abstract Test Suite for UNI Type 1 February 2008.
6 December 2006 Design Organisation Approval Workshop DUBLIN
NPA WG : Single and multiple releases
Harmonized implementation of CDM Accreditation CDM-Accreditation Panel.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Exit a Customer Chapter 8. Exit a Customer 8-2 Objectives Perform exit summary process consisting of the following steps: Review service records Close.
Create an Application Title 1A - Adult Chapter 3.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions
Projects in Computing and Information Systems A Student’s Guide
Introduction to Auditing
World Health Organization
Excel Functions. Part 1. Introduction 2 An Excel function is a formula or a procedure that is performed in the Visual Basic environment, outside the.
Site Safety Plans PFN ME 35B.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
EMS Checklist (ISO model)
Effectively applying ISO9001:2000 clauses 6 and 7.
SPACE PRODUCT ASSURANCE
AS9102 First Article Inspection Report
Customer Service.
Dispelling Myths Surrounding ISO/IEC 17020
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Checking & Corrective Action
A Process to Identify the Enduring Skills, Processes, & Concepts for your Content Area 1.
Quality Manual for Interoperability Testing Morten Bruun-Rasmussen Presented by Milan Zoric, ETSI.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
GEtServices Services Training For Suppliers Requests/Proposals.
25 seconds left…...
Januar MDMDFSSMDMDFSSS
Analyzing Genes and Genomes
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
ISO 9001:2000 Documentation Requirements
A lesson approach © 2011 The McGraw-Hill Companies, Inc. All rights reserved. a lesson approach Microsoft® PowerPoint 2010 © 2011 The McGraw-Hill Companies,
MIS (Management Information System)
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
ISO 9000 Certification ISO 9001 and ISO
Presentation transcript:

PART B SPACE PRODUCT ASSURANCE esa Soldering Course based on: EUROPEAN COOPERATION FOR SPACE STANDARDIZATION ECSS-Q-ST-70-18C, 15 November 2008 Preparation, assembly & mounting of RF coaxial cables 20101227 PART B

Process Verification 5.7.1 General a. The supplier shall conduct verification tests to establish confidence in the reliability of solder‐joint configurations and processing methods not shown in this Standard. b. The configuration shall be considered verified if no cracked solder joints or part damage is found after 200 thermal cycles in accordance with the test conditions given in clause 5.7.2 and vibration given in clause 5.7.3 and when the configuration is examined under 15× minimum magnification. c. The supplier shall ascertain the absence of cracks within the interconnection by metallography, microsections being made in the longitudinal mid‐plane of the assembly.

Process Verification (cont’d) 5.7.2 Temperature cycling a. The supplier shall perform the temperature cycling in conformance with the requirements given in clause 13.3 of ECSS‐Q‐ST‐70‐08. NOTE These conditions can be modified by the customer to conform with the particular environmental qualification conditions for the assembly being verified.

Process Verification (cont’d) 5.7.3 Vibration a. After completion of the temperature cycling, the supplier shall subject the test specimen to vibration. b. The supplier shall derive the test levels, frequencies and durations from the system requirements. c. The severity of the vibration tests shall not be inferior to that shown in the following tables of ECSS‐Q‐ST‐70‐08: 1. Sine survey 2. Minimum severity for sine vibration testing 3. Minimum severity for random vibration testing for all applications except launchers 4. Minimum severity for random vibration testing for launchers.

5.8 Quality Assurance 5.8.1 Data The supplier shall retain the quality records for at least ten years, or in accordance with project business agreement requirements. NOTE Example of quality records are logbooks. b. The content of the quality records shall be in conformance with the DRD in Annex A.

5.8 Quality Assurance 5.8.2 Nonconformance a. The supplier shall disposition any nonconformance observed in respect of the soldering process in conformance with quality assurance requirements in ECSS‐Q‐ST‐10‐09. b. If a repair procedure is agreed, the supplier shall perform it in conformance with ECSS‐Q‐ST‐70‐28.

5.8 Quality Assurance 5.8.3 Calibration The supplier shall calibrate any measuring equipment to traceable reference standards. b. The supplier shall record any suspected or actual equipment failure as a project nonconformance report according to ECSS‐Q‐ST‐20. NOTE This is to ensure that previous results can be examined to ascertain whether or not re‐inspection or retesting is required. c. The supplier shall notify the final customer of the nonconformance details. 5.8.4 Traceability a. The supplier shall maintain traceability throughout the process from incoming inspection to final test, including details of test equipment and personnel employed in performing the task.

5.8 Quality Assurance 5.8.5 Workmanship standards a. The supplier shall prepare visual standards consisting of work samples or visual aids that illustrate the quality characteristics of all soldered connections involved. b. The supplier shall make the visual standards specified in 5.8.5a, available to each operator and inspector. c. The supplier shall include the illustrations presented in Annex B of this Standard, supplemented as necessary, as examples.

5.8 Quality Assurance 5.8.6 Inspection a. During all stages of the process, the inspection points shall be observed.

5.8 Quality Assurance 5.8.7 Operator and inspector training and certification a. The supplier shall employ trained and competent personnel for all soldering and crimping operations and inspections. b. The supplier shall develop, maintain and implement a training programme to provide for excellence of workmanship and personnel skills and a thorough knowledge of the requirements detailed in this Standard. c. The supplier shall obtain certificates for trained personnel performing soldering and crimping operations and inspections. d. This certification shall be based upon objective evidence of quality, resulting from test and inspection of completed joints. e. The supplier shall apply retraining or reassessment of personnel in cases of repetitive unacceptable quality levels and changes in soldering or assembly techniques, parameters or required skills. f. The supplier shall maintain records of the training and certification status of operators and inspection personnel. g. All training shall be performed at a school authorized by the final customer.

Annex A (normative) Logbook – DRD A.1 DRD identification A.1.1 Requirement identification and source document This DRD is called from ECSS‐Q‐ST‐70‐18, requirement 5.8.1b. A.1.2 Purpose and objective The purpose of the logbook is to summarize the quality records.

Annex A (normative) Logbook – DRD A.2 Expected response A.2.1 Scope and content The logbook shall contain a copy of the final inspection documentation. b. The logbook shall refer to the non‐conformance report and corrective actions. c. The logbook shall contain a copy of the inspection and test results with reference to the procedure, drawings, personnel, tools, solders, fluxes and solvents utilized. d. The logbook shall contain measurements of the external length of the centre conductor. e. The logbook shall contain records of the training and certification status of operators and inspection personnel. f. The logbook shall contain the finding and related corrective action raised during the audit.

Annex B (normative) Workmanship standards

Workmanship standards Hotbird 8

Workmanship standards Switch matrices

Workmanship standards Cable IDs secured with 2 turns of Kapton tape Grounding straps

Workmanship standards Solithane is applied to threads of a fixing as a screw locker or over damaged insulation as a protective layer. Adding Microballoons according to an approved procedure, makes it become a thick glue.

Workmanship standards Solithane with microballoons for staking. Electrodag 503 62% from http://www.achesonindustries.com/ …said to reduce losses at connectors. Further coated with Urelane.

Workmanship standards Waveguides Heatpipes

Workmanship standards Test unit

Workmanship standards Test unit

Workmanship standards Test unit

Workmanship standards Close-up of Electrodag 503 62% (undercoated with Scotchweld 2216 for staking and overcoated with Arathane to prevent flaking of Electrodag)

Workmanship standards Refer also to IPC/WHMA-A-620 section 13 For characteristics not illustrated in ECSS-Q-ST-70-18, apply Class 3 as a minimum and ensure no conflict with ECSS-Q-ST-70-08 or ST-70-18 The following slides show examples from IPC/WHMA-A-620 with interpretation appropriate to the requirements of ECSS-Q-ST-70-18

Workmanship standards Air gap REJECT Bend radius too small REJECT Above pictures reproduced from IPC/WHMA-A-620 with kind permission of IPC (Jack Crawford, April 2005)

Workmanship standards Contact properly seated ACCEPT Recessed contact REJECT Above pictures reproduced from IPC/WHMA-A-620 with kind permission of IPC (Jack Crawford, April 2005)

Workmanship standards Bent contact Protruding dielectric REJECT Recessed dielectric REJECT Above pictures reproduced from IPC/WHMA-A-620 with kind permission of IPC (Jack Crawford, April 2005)

Workmanship standards Copper filings on dielectric REJECT Flange roll-over reducing clearance between centre and outer conductors REJECT Above pictures reproduced from IPC/WHMA-A-620 with kind permission of IPC (Jack Crawford, April 2005)

Workmanship standards Insufficient solder REJECT Excess solder REJECT Above pictures reproduced from IPC/WHMA-A-620 with kind permission of IPC (Jack Crawford, April 2005)

Workmanship standards Swage-type connector with swage ferrule properly inserted ACCEPT Swage-type connector with swage ferrule incompletely inserted REJECT Above pictures reproduced from IPC/WHMA-A-620 with kind permission of IPC (Jack Crawford, April 2005)

 END OF INSPECTION SLIDES http://www.peigenesis.com/en/connectors/by-series--type/space-grade-connectors.html

Tuning Cable clamps in place Cable clamps in stretcher tool

Tuning Cable stretching

References: T.C. Edwards, Foundations for Microstrip Circuit Design, John Wiley & Sons Ltd., 1981. ISBN 0 471 27944 7 Thomas S. Laverghetta Microwave Measurements and Techniques ISBN-10: 0890060533 http://www.peigenesis.com/en/connectors/by-series--type/space-grade-connectors.html

 END OF PRESENTATION