1 HSE KPI Data Collection Tool Briefings. 2 Contents Why is Network Rail introducing this system Data Input Levels System and Navigation Help Setting.

Slides:



Advertisements
Similar presentations
11/2/2013 2:02:38 AM 5864_ER_FED 1 Importing Certificates into Lotus Notes R6.
Advertisements

1 CASUS Authoring System 07/2010 E-Learning & E-Teaching Welcome to the CASUS Authoring System!
Page 1 Shipping and Billing for Related (Owned) Factories By MIS Department.
Page 1 Accounts Payable Voucher Entry By MIS Department.
Professional Profiles Module 3 1. Objectives In this module you will learn: Professional Profile basics How to create a Professional Profile How to add.
State of New Jersey Department of Health and Senior Services Patient Safety Reporting System Module 2 – New Event Entry.
Michigan Electronic Grants System Plus
PrevNext | Slide 1 Michigan Electronic Grants System MEGS MEGS Additional Features Last Updated: 2/4/2011.
Michigan Electronic Grants System Plus
Addition Facts
Microsoft Project Tutorial for Chapters 6 & 7
©2010 AECsoft USA Confidential External User Guide AECsoft USA, Inc Yorktown, Suite 435 Houston TX ©2010 AECsoft USA Confidential.
1 NatQuery 3/05 An End-User Perspective On Using NatQuery To Extract Data From ADABAS Presented by Treehouse Software, Inc.
1 SLIDE Insurance Company Regulation Division Insurance Market Regulation Division Medical Professional Liability Insurance Claim Reports Online Claim.
Calculating Quality Reporting Service
Costpoint Credit Card Training Log In
Welcome to Access Online for State of Iowa Cardholders.
“The Honeywell Web-based Corrective Action Solution”
Smart Connect – Supplier Portal Training Module 3 – Creation of Advance Shipment Notification.
iStar How to Create an Amendment
Delegated Admin Tool Edit User Profile Training Module.
1 Welcome to SAPS Webmail. 2 Things we will learn about: 1. Login to mail.
CREATING A PAYMENT REQUEST FOR VENDOR IN SYSTEM
CREATING A PAYMENT REQUEST FOR A NEW VENDOR
Corporate Procurement The New & Improved IM Adhoc Report November 2007.
Industry Outlook The new on-line registration process within EMITS The New Tenderers Presentation for the Industry Space Days.
An Introduction to Secure Access Phase 2 1. Background to Secure Access Secure Access (SA) was introduced on 10 December 2012 to provide Local Authorities.
Creating and Submitting a Necessary Wayleave Application
Getting Started with D2A
Light User Guide BVPortal June 30th, p.m. Charles - Henri Varin KM DTP For the benefit of business and people.
Addition 1’s to 20.
Brief introduction to Secondary Care SOAR users Last updated: 13 th December 2012.
Brief introduction to Primary Care (GP) SOAR users Last updated: 24 th August 2012.
® Microsoft Office 2010 Browser and Basics.
 Departmental Administrative Specialist should verify that the vendor is not an existing vendor using XK03 in IRIS.  All NEW vendors must complete the.
Reporting Serious Incidents in TFACTS
Week 1.
So you want to create a PO Here’s how…. 1.Open RAPS and click the “Create” tab at the bottom of the screen.
SEDDAS SED Delegated Account System Fall 2008 A copy of this presentation can be printed by clicking on the “printer” icon on the tool bar at the top of.
TIDE Presentation Florida Standards Assessments 1 FSA Regional Trainings Updated 02/09/15.
Windfall Web Throughout this slide show there will be hyperlinks (highlighted in blue). Follow the hyperlinks to navigate to the specified Topic or Figure.
Test Administrator Interface & Student Interface
CareCentrix Direct Training.
CIM Student Employment - TimesheetX
GSRS 2.1 Training Module S.2.1 Navigation General
Smart Connect – Supplier Portal Training Module 2 – Creation of Service Confirmation.
Procurement Card Training Strategic Account Management (SAM)
EProcurement Job Aid Requisitions & Receipts. Table of Contents Creating a Requisition Define Requisition Vendor.
PROACTIS: Supplier User Guide Contract Management.
Virtual Health & Safety Management System (VHSMS) A Brief Guide for Head Teachers.
ETID Electronic Turn-in Document
Komen Grants eManagement System GeMS. Why Online Grants  Reduce the amount of administrative paperwork being completed by applicants and grantees. 
CQRS User Story – SERVICE PROVIDER Chris Brown – project manager 05 September 2012 Calculating Quality Reporting Service.
Lead Management Tool Partner User Guide March 15, 2013
1. To start the process, Warehouse Stationery (WSL) will invite you to use The Warehouse Group Supplier Electronic Portal and will send you the link to.
Pack Company Procedures. Accepting a HIP request from a supplier Allocating the Component Providers Sending the instruction through to the Component Providers.
Purchase Order and Invoice Guide
0 eCPIC Admin Training: OMB Submission Packages and Annual Submissions These training materials are owned by the Federal Government. They can be used or.
Office of Housing Choice Voucher Program Voucher Management System – VMS Version Released October 2011.
FHA Training Module 1 This document reflects current policy related to this topic. Its content is approved for use in all external and internal FHA-related.
MS Invoice E-Invoice Solution Overview March 2016.
Editor Guide: Sending Author Revision Reminders in Editorial Manager™ Created by J. Strusz 06/01/2011.
7 Day Self Assessment Tool (7 Day SAT) March 2016 Survey - User Guide v4 (March 2016)
Easy Chair Online Conference Submission, Tracking and Distribution Process: Getting Started AMS WMC and AMS Annual Conferences Click on play to begin show.
myWizard Metrics User Guide For Base Deployed Projects
Compatible with the latest browsers; Chrome, Safari, Firefox, Opera and Internet Explorer 9 and above.
Your Name Proposal Creation Module 5 Your Name
Fraedom Approvals Presentation
Create, Upload and Use Data Extensions (Lists)
Presentation transcript:

1 HSE KPI Data Collection Tool Briefings

2 Contents Why is Network Rail introducing this system Data Input Levels System and Navigation Help Setting PM Delegates and NR Data Inputters Setting Project Data Requirements and Status Setting Data Requirements at Supplier Level Setting Data Requirements at Purchase Order Level Submitting Project Level Data (Method 1 and 2) Appointing a Supplier Manager Approving or Rejecting Data Reports Timelines

3 Why is Network Rail introducing this system Data is not collected at a consistent level of granularity NR Project Managers do not always take ownership of the data Data collection is cumbersome and inefficient Industry criticism that data is manipulated –“Industry regulator, the Office for Rail Regulation (ORR) has described Network Rail's reporting of RIDDOR (Reporting of injuries, diseases and dangerous occurrences regulations) incidents as "obscure and wrong.“ Unite Publication Sep 2010 –“The ORR has confirmed that there had been a pattern of reporting accidents within Network Rail that were simply not credible, with the ratio of major to minor accidents at Network Rail being 1:1.12 compared with the industry template of 1:30”. ORR Statement Sept 2010

4 Data Input Levels There are four data levels of which three are Mandatory. From the lowest level to the highest they are; 1. Purchase Order Level (PO Level) This data is submitted by the Contractor for each PO. Live Purchase Orders are automatically extracted from Oracle Projects. In the case of multiple POs being raised with the same contractor on one project it is permissible to combine them 2. Supplier Level This data is input by the NR project team to reflect the performance of a Supplier. This is not a mandatory level and is only currently required for Crossrail 3. Project Level Is data is input by the Project Manager, his delegate or nominated Data Inputter. It reflects the achievements of the Network Rail delivery team 4. Programme Level This data is input by the Programme Administrator. Typically someone from HSEA or Project Controls

5 System and Navigation System –The system is fed with reference data from Oracle Projects –The data is held external to Network Rail. It is immediately captured by the server as it is input –You are able to close down the application and still be logged in when the application is reopened –You do not access the system through Connect and can therefore access it from any PC Navigation –The back button, usually at the top left of your screen will operate and not freeze the application –There are many hyperlinks and filters to shortcut steps –There is usually more than one way to achieve the desired activity

6 Help For immediate help reference the User Guide attached to the HELP tab on the menu bar Where available, click on the question mark button for further detailed descriptions A FAQ sheet will be attached to the HELP tab. This will be generated as calls for help are received. Contact your Programme Administrators for guidance. Contact details of these will appear on the HELP tab The Application is not supported by Network Rail IM. For system faults the service desk is provided by On-trac

7 Setting PM Delegates and NR Data Inputters 1 of 2 The Project Manager named within Oracle Projects will receive an automated confirming that he has a Project, and/or Purchase Order for which KPI data is likely to be required The Project Manager can delegate his duties which include: –Create one or more Project Manager delegates (They delegate cannot further delegate) –Create one or more Network Rail data inputters –Set the Project and Supplier HSE Data Requirement and Status –Submitting Project Level Data –Submitting Supplier Level Data (Crossrail only at present) –Appoint a Supplier Manager responsible for PO level data submission –Accepting or rejecting PO Level Data from the Contractor The delegate can reject the nomination The PM can nominate a data Inputter who cannot reject the nomination.

8 Setting PM Delegates and NR Data Inputters 2 of 2 1.Select Project 2.Select Filter projects 3.Enter Filter Details 4.Apply Filter 5.Hover over Actions 6.Select “Manage Users Roles” 7.New Window (Not shown) 8.Select the Role you want (Not Shown) 9.Select Existing or Create New User 10.Enter specific details 11.Select Apply

9 Setting Project Data Requirements & Status 1 of 2 HSE Data Requirement –The default set to each project is that HSE Data is required –Some Projects are purely set up for Sponsor Contingency, Capital Payments and for other reasons whereby HSE KPI Data will not be required. The HSE Data Requirement for these projects should be set to not required Project Status –Active (Default) –Inactive e.g. awaiting further financial authority, vacant possession etc –Completed, This allows immediate data submission –Closed i.e. no further KPI data is to be submitted for this Project NBAny Requirement or Status applied at Project Level will automatically be applied to Supplier and PO level beneath it

10 Setting Project Data Requirements & Status 2 of 2 1.Select Project 2.Select Filter projects 3.Enter Filter Details 4.Apply Filter 5.Hover over Actions 6.Select Edit Details 7.Reference Slide 9 and Select appropriate Data Requirement 8.Reference Slide 9 and Select appropriate Status 9.Select Apply

11 Setting Data Requirements at Supplier Level 1.Select Project 2.Select Filter projects 3.Enter Filter Details 4.Apply Filter 5.Click on the Project Name 6.Hover over relevant Actions 7.Select Edit Details 8.Reference Slide 9 and Select appropriate Data Requirement 9.Reference Slide 9 and Select appropriate Status 10.Select Apply NB Setting at Supplier level will affect all POs raised for that supplier

12 Setting Data Requirements at PO Level Follow steps 1 to 5 from the previous slide 6.Click on the Supplier 7.Hover over Actions against the required PO Description 8.Select Edit Details 9.Select the Data Requirement 10.Select Update

13 Submit Project Level Data Method 1 1.Select Project 2.Select Filter projects 3.Enter Filter Details 4.Apply Filter 5.Hover over Actions 6.Select Submit KPI 7.Click on the Project Description 8.New window pops up 9.Either Enter Data or confirm no KPI Data submission required 10.Select Submit Data (Not Shown)

14 Submit Project Level Data Method 2 1.Click on Submissions 2.Click on All Submissions 3.Filter if necessary 4.New Window appears listing all required submissions 5.Choose the submission you wish to complete 6.Enter Data as per slide 13

15 Appointing a Supplier Manager 1 of 3 You can do this at either Supplier or PO level. If you do it at Supplier level that person will be appointed to all the POs raised for that contractor on the project. Appointing at PO level means that you can have multiple Supplier Managers. A Supplier Manager can reject the nomination by the NR PM A Supplier Manager can set up Supplier Data Inputters. They can not reject the nomination Do not set a NR Supplier Data Inputter as the Supplier Manager

16 Appointing a Supplier Manager 2 of 3 At Supplier Level 1.Select Projects 2.Filter if required 3.Select the required project 4.Hover over Actions on the required Supplier 5.Click on Manage User Roles 6.Select Supplier Manager 7.Warning Window pops up 8.Click on Continue 9.Enter Supplier Manager’s details (Not Shown) NB This Supplier Manager will be appointed to all POs raised on this project for this supplier

17 Appointing a Supplier Manager 3 of 3 At PO Level 1.Select Projects 2.Filter if required 3.Select the required project 4.New Window pops up 5.Select the required Supplier 6.New Window pops up 7.Select the required PO by clicking on the description 8.Hover over the Actions 9.Click on Manage User Roles 10.Create the Supplier Manager (Not Shown)

18 Approving or Rejecting Data 1.Select Submissions 2.Select Review Submissions 3.New Window pops up 4.Select Submitted data 5.New Window pops up 6.Accept or reject the KPI data in groups or sub-groups 7.Enter reason for rejection 8.Submit Review (Not Show) NB You can not submit the review unless all the data has been either accepted or rejected NB2 Clicking Actions > Review KPI

19 Reports Data Input Requirements –Click on Reports tab –Select KPI Data Requirements for a complete list of the data requirements. A useful extract to put into your tender requirements. Particularly if combined with the Calendar To view previous submissions –Click on Submissions –Click on Completed Submissions

20 Timelines You can access the system calendar by Clicking on Calendar on the Menu Bar Key Activities –OP Data upload Mon week 4 –Project set up Tues to Fri Week 4 –Early bird data submission Wed week 4 to Sunday week 1 –Latest On Time data submission Mon Week 1 –PM Approval Tues week 1 –Board Report Extract Wed Week 1 –Late submission deadline Sat week 4