2009 Annual Meeting ● Assemblée annuelle 2009 Halifax, Nova Scotia ● Halifax (Nouvelle-Écosse) 2009 Annual Meeting ● Assemblée annuelle 2009 Halifax, Nova.

Slides:



Advertisements
Similar presentations
Números.
Advertisements

Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
1 Oregon Short-Term Fund 2008 OMFOA Spring Conference March 11, 2008 Linda Haglund – Deputy State Treasurer Perrin Lim – Sr. Fixed Income Investment Officer.
Real GDP USs Real GDP EUs Real GDP Japans Real GDP.
1 Private & Confidential A Growing, Broad, Global Market Institutional Clients: Pension Funds, Endowments & Insurance Cos. Central Banks and Social Security.
Analysis of Financial Statements
Fill in missing numbers or operations
Reflection nurulquran.com.
EuroCondens SGB E.
Worksheets.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Addition and Subtraction Equations
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
1 Changing Profile of Household Sector Credit and Deposits in Indian Banking System -Deepak Mathur November 30, 2010.
1 Comments on Capital Control Jorge Arbache Brazilian Development Bank and University of Brasilia This presentation does not reflect the views of the Brazilian.
1 When you see… Find the zeros You think…. 2 To find the zeros...
Performance of Hedges & Long Futures Positions in CBOT Corn Goodland, Kansas March 2, 2009 Daniel OBrien, Extension Ag Economist K-State Research and Extension.
CALENDAR.
New England Pension Consultants. 1 Table of Contents > Market Environment > Asset Allocation / Investment Policy Targets > Performance Summary > Performance.
One Main Street, Cambridge, Massachusetts (617) ; F: (617) Fourth Quarter 2006 Investment Performance Analysis.
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
The 5S numbers game..
Copyright © Cengage Learning. All rights reserved.
PSU Study Session Fall 2010 Dan Sprik
突破信息检索壁垒 -SciFinder Scholar 介绍
Asset Liability Management is a procedure which allows us to gain an understanding whether the companys assets would be sufficient to meet the companys.
A Fractional Order (Proportional and Derivative) Motion Controller Design for A Class of Second-order Systems Center for Self-Organizing Intelligent.
Break Time Remaining 10:00.
The basics for simulations
Historical Perspective on British Columbias Credit Rating Presentation to Financial Management Institute June 18, 2008.
Enrolling in your group program with Standard Life Express TM Plan for life TM.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
The Pecan Market How long will prices stay this high?? Brody Blain Vice – President.
BUS422 (Ch 1& 2) 1 Bond Market Overview and Bond Pricing 1. Overview of Bond Market 2. Basics of Bond Pricing 3. Complications 4. Pricing Floater and Inverse.
MCQ Chapter 07.
Measuring the Economy’s Performance
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
1 Prediction of electrical energy by photovoltaic devices in urban situations By. R.C. Ott July 2011.
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Progressive Aerobic Cardiovascular Endurance Run
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
When you see… Find the zeros You think….
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
ST/PRM3-EU | | © Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying.
Foundation Stage Results CLL (6 or above) 79% 73.5%79.4%86.5% M (6 or above) 91%99%97%99% PSE (6 or above) 96%84%100%91.2%97.3% CLL.
Subtraction: Adding UP
Chapter 13 Equity Valuation 1.
1 Non Deterministic Automata. 2 Alphabet = Nondeterministic Finite Accepter (NFA)
Static Equilibrium; Elasticity and Fracture
Resistência dos Materiais, 5ª ed.
Clock will move after 1 minute
Copyright © 2007 Prentice-Hall. All rights reserved 1 Long-Term Liabilities Chapter 15.
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
Analyzing Financial Statements
INVESTMENTS | BODIE, KANE, MARCUS Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin CHAPTER 14 Bond Prices and.
Select a time to count down from the clock above
Saunders & Cornett, Financial Institutions Management, 4th ed.
2007 Annual Meeting ● Assemblée annuelle 2007 Vancouver 2007 Annual Meeting ● Assemblée annuelle 2007 Vancouver Canadian Institute of Actuaries Canadian.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
2009 Annual Meeting ● Assemblée annuelle 2009 Halifax, Nova Scotia ● Halifax (Nouvelle-Écosse) 2009 Annual Meeting ● Assemblée annuelle 2009 Halifax, Nova.
2008 General Meeting Assemblée générale 2008 Toronto, Ontario 2008 General Meeting Assemblée générale 2008 Toronto, Ontario Canadian Institute of Actuaries.
2009 Annual Meeting ● Assemblée annuelle 2009 Halifax, Nova Scotia ● Halifax (Nouvelle-Écosse) 2009 Annual Meeting ● Assemblée annuelle 2009 Halifax, Nova.
2009 Annual Meeting ● Assemblée annuelle 2009 Halifax, Nova Scotia ● Halifax (Nouvelle-Écosse) 2009 Annual Meeting ● Assemblée annuelle 2009 Halifax, Nova.
Presentation transcript:

2009 Annual Meeting ● Assemblée annuelle 2009 Halifax, Nova Scotia ● Halifax (Nouvelle-Écosse) 2009 Annual Meeting ● Assemblée annuelle 2009 Halifax, Nova Scotia ● Halifax (Nouvelle-Écosse) Canadian Institute of Actuaries Canadian Institute of Actuaries L’Institut canadien des actuaires L’Institut canadien des actuaires

Christian-Marc Panneton WS-30 LDI for Pension Plans: Moving from Theory to Practice AT-30 Les placements fondés sur les passifs pour les régimes de retraite: de la théorie à la pratique WS-30 LDI for Pension Plans: Moving from Theory to Practice AT-30 Les placements fondés sur les passifs pour les régimes de retraite: de la théorie à la pratique 2009 Annual Meeting Assemblée annuelle

LDI for Pension Plans Agenda Liabilities Interest Rate Risk Credit Spread Risk Risks Management Process Conclusion 2009 Annual Meeting Assemblée annuelle Annual Meeting Assemblée annuelle

Interest Rate Risk Objective: Mitigate interest rate risk 1 st Step: Determine risk exposure – Duration is a simple metric A single number indicating sensitivity to interest rate changes Duration gap between assets and liabilities 2009 Annual Meeting Assemblée annuelle Annual Meeting Assemblée annuelle

Interest Rate Risk – Need liability characteristics – Typically monthly expected CF – Must be updated regularly Adjust for actual vs expected – Case Study: retirees 2009 Annual Meeting Assemblée annuelle Annual Meeting Assemblée annuelle % = 106,63 millionsDuration = 8.50

Duration – rule of thumb –Given a duration of D, a variation of  y in yields will change the value by  D  y Duration = 8.5, y increases by 1% => decrease of 8.5% Interest Rate Risk 2009 Annual Meeting Assemblée annuelle % = millions 5.50% = millions  = 7.88%

Duration metric is not precise –PV is not a linear function Convexity –Indicates Duration sensitivity to interest rate changes Interest Rate Risk 2009 Annual Meeting Assemblée annuelle % = % = % = –Expected change in PV –with duration only:- 8.50% –With duration and convexity: % –Actual change:- 7.88%

Assumptions Liability duration:8.50 Funded ratio:100% Traditional 60-40% Mix Equities Duration:0 DEX Universe Duration:6.57 ( ) 60%-40% Mix Duration:2.63 –Impact of a decrease in yield of +50bps Assets increase by 1.32% Liabilities increase by 4.25% Funded ratio decreases to 97.07% Case Study 2009 Annual Meeting Assemblée annuelle Material interest rate risk with Traditional 60-40% Mix

Using Long-Term Bonds Equities Duration: 0 DEX Long-term Duration:12.61 ( ) 33%-67% Mix Duration: 8.45 –Impact of a decrease in yield of +50bps Assets increase by 4.23% Liabilities increase by 4.25% Funded ratio almost unchanged! (99.98%) Case Study 2009 Annual Meeting Assemblée annuelle Taking into account the liability’s CF duration in selecting assets can reduce exposure to interest rate changes.

Not So Easy! –From Dec. 31, 2008 to March 31, 2009 TSX Total return:  2.0% DEX Universe:+ 1.5% DEX Long-term:+ 0.3% Solvency liability:  1.5% Liability valued with Canada yield curve:  0.3% CF Matching Liability (AA yield curve):+ 4.4% –From Sep. 30, 2008 to Dec. 31, 2008 TSX Total return:  22.7% DEX Universe:+ 4.5% DEX Long-term:+ 5.2% Solvency liability:+ 3.2% Liability valued with Canada yield curve:+ 8.9% CF Matching Liability (AA yield curve):  4.8% Case Study 2009 Annual Meeting Assemblée annuelle

Case Study 2009 Annual Meeting Assemblée annuelle Assets (at market) Stocks TSX Total Return Bonds DEX Universe DEX Long-term Solvency Liability Funded Ratio Sep 30, ‘ % Dec 31 ‘ % Mar 31 ‘ % Sep 30, ‘ % Dec 31 ‘ % Mar 31 ‘ % 60-40% Traditional Asset Mix33-67% Alternative Asset Mix Taking into account the liability’s CF duration in selecting assets did reduce exposure to interest rate changes!

Case Study Solvency Liability – Based on a single rate: Canada over 10-years bond + spread – Doesn’t capture full yield curve dynamic Better Approach to Risk Management – Consider the complete yield curve Start with the Canada Bond yield curve Bootstrap to get spot curve… 2009 Annual Meeting Assemblée annuelle Annual Meeting Assemblée annuelle

Case Study Partial Duration – Measure the sensitivity of change in yield for a given maturity – Sums to duration ( ) 2009 Annual Meeting Assemblée annuelle Annual Meeting Assemblée annuelle Low sensitivity to short-term rates High sensitivity to long-term rates

Case Study Evolution Canada Yield Curve 2009 Annual Meeting Assemblée annuelle Annual Meeting Assemblée annuelle From Dec 07 to Sep 08 Large short-term rates decrease dominates => +0.3% From Dec 08 to March 09 Long-term rates increase dominates =>  0.3%

Case Study Yield Curve for Liabilities – Investment Policy: Assets allowed – Based on Target or Benchmark portfolio – Provincial spreads vs Canada Ontario spreads increased by 47bps in Q Annual Meeting Assemblée annuelle Annual Meeting Assemblée annuelle

Case Study Yield Curve for Liabilities – Spreads on Corporate raised even more in 2008 Ontario spreads increased by 93 bps A-rated Corporate spreads increased by 305 bps 2009 Annual Meeting Assemblée annuelle Annual Meeting Assemblée annuelle

Case Study Credit Spread Risk – Can be more material than interest rate risk – From Sep ‘08 to Dec ’08 Canada curve decreased => + 8.9% Ontario curve decreased by smaller amount => + 4.2% A-rated Corp. curve increased =>  5.5% 2009 Annual Meeting Assemblée annuelle Annual Meeting Assemblée annuelle Liability

Case Study Credit Spread Risk – From Dec ‘08 to March ’09 Canada almost unchanged =>  0.3% Ontario stepped lightly =>  0.2 % A-rated Corp. curve decreased => + 5.8% 2009 Annual Meeting Assemblée annuelle Annual Meeting Assemblée annuelle Liability Type of Bonds in portfolio can make a huge difference!

Risks Financial Risks – Interest rates – Credit spread – Liquidity – Inflation – Market risk –…–… Non-financial Risks – Mortality – New entrants / Turnover –…–… 2009 Annual Meeting Assemblée annuelle Annual Meeting Assemblée annuelle

Portfolio construction Development of an investment policy Analysis of client’s needs Optimization Reports to clients Portfolio rebalancing Follow-up of matching LDI - ALM Process 20

Portfolio Management Not “Active” in traditional sense, Not “Buy-and-Hold” either! Decision-making process – Continuous process – Close collaboration between Team members – Assumption testing – Portfolio Decision – Validation 2009 Annual Meeting Assemblée annuelle Annual Meeting Assemblée annuelle

Portfolio Management Yield curve analysis and bond pricing – Internal and External sources – Securities allowed in portfolio: detached coupons, asset-backed securities, asset-backed mortgages, synthetic bonds, corporations (public and private), derivative products, RRB, … Buy and Sell decision – Portfolio Rebalancing – Opportunities – Market Events 2009 Annual Meeting Assemblée annuelle Annual Meeting Assemblée annuelle

Portfolio Management Portfolio Construction Process – Objective: Ensure matching of liabilities according to risk metrics defined in investment policy. – Steps: Replication of the benchmark portfolio with a portfolio of zero coupons and/or bonds, Diversification of fixed income securities (issuers, activity sectors, geographic regions,…), Credit risk limited (e.g., maximum concentration rules by asset item class, sub-class, activity sector, issuer), Currency risk must be managed if allowed, Counterparty risk limited by concentration rules, Portfolio optimization, Final portfolio construction Annual Meeting Assemblée annuelle Annual Meeting Assemblée annuelle

Conclusion Managing the Financial Risks associated with a Pension Liability Requires: – A very good understanding of the liability financial characteristics. – Risk tolerance limits which reflect the risk appetite of the Pension Plan. – Tools to measure and assess current risk position. – Portfolio managers which can generate added- value within pension plan risk appetite Annual Meeting Assemblée annuelle Annual Meeting Assemblée annuelle

Thank You! 2009 Annual Meeting Assemblée annuelle Annual Meeting Assemblée annuelle