Designation Process (EB-2010-0059) and East-West Tie Line (EB-2011-0140) March 23, 2012.

Slides:



Advertisements
Similar presentations
1 CDM Study October 19, 2011 Stan But Manager, Economics & Load Forecasting.
Advertisements

Southwest Rhode Island Transmission Supply Study Long Term Needs and Solutions.
Smart Grid: an Ontario Perspective Brian Hewson, Senior Manager Regulatory Policy Hamilton May 8, 2013.
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
The Western Electricity Coordinating Council Doug Tucker of WECC & Brian Keel of SRP November 16, TRD/TADS Webinar.
Order 2004 Sensitive 1 WECC Phase 1 Rating Process Coordinated Planning and Technical Studies: PCC Presentation on the Avista Interconnection to the PG&E.
NERC Footnote b / 12 – Load Loss
March 2012 Ports and Cities Conference Newcastle Dorte Ekelund, Executive Director Major Cities Unit Department of Infrastructure and Transport
1 Wyoming Infrastructure Authority November 10, 2009 Superconductor Electricity Pipelines.
1. 2 August Recommendation 9.1 of the Strategic Information Technology Advisory Committee (SITAC) report initiated the effort to create an Administrative.
Doug Tucker Associate Staff Engineer TRD/TADS update and Future reporting.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
Development of the Smart Grid Implementation of the Board’s Policies November 8, 2012.
Development of the Smart Grid Implementation of the Board’s Policies November 20, 2012.
Development of the Smart Grid Implementation of the Board’s Policies Smart Grid Working Group November 29, 2012.
Excelsior Energy’s Mesaba Energy Project Update for the NM-SPG August 16, 2006.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
March 6, 2008 Technical Advisory Committee Luminant Energy & Oncor Tyler Grande Autotransformer Addition and 138 kV Line Upgrade Project Jay Teixeira Manager,
1 Transformation Presentation to the Public Sector Management Workshop June 1,
May 2013 Tehachapi Renewable Transmission Project (TRTP)
Ward 21 Reliability Cedarvale and Surrounding Area Prepared for Councillor Mihevc Toronto Hydro System Planning March 25, 2015.
TERRACE TO KITIMAT TRANSMISSION PROJECT UPDATE Feb/March 2015.
IS Theories & Practices Systems Architecture & Infrastructure IS 655: Supplementary Note 1 CSUN Information Systems.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
THE POWER OF POSSIBILITY Electric Transmission System Development in Alberta Neil J. Brausen, P. Eng., Director System Planning APEGGA Calgary Branch Luncheon.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
January 5, 2012 TAC Cross Valley 345 kV Project Jeff Billo Manager, Mid-Term Planning.
Transmission planning in Vermont Past, present and future Docket 7081 workshop By Dean LaForest 9/19/05.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
CITY OF LAKE WORTH, FLORIDA UTILITIES DEPARTMENT A Look at our Electric Utility A Plan For The Future.
Severn Tidal Power Feasibility Study Background to the study Terms of reference announced in January 08 Aim of the study: To enable Government to decide.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
ISO Grid Planning Presentation to CREPC October 1, 2002
Charles Hosken, General Manager Imperial Irrigation District
Report on the NCTPC 2006 Collaborative Transmission Plan Mark Byrd, Manager – Transmission Planning Progress Energy Carolinas, Inc January 25, 2007.
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
Northern California to Pacific Northwest/Canada Transmission Line Steve Metague, PG&E February 29, 2008.
The Need for Electric Transmission Improvements in Dane County.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Lyndonville Electric Department Feasibility Analysis Review December 2,
SETTING PAYMENT AMOUNTS FOR OPG’S PRESCRIBED ASSETS EB Michael Lyle, General Counsel ; fax
1 Distributed Energy Resources: Bringing Energy Closer to Home Presentation by the Industry Task Force on Distributed Generation July 28, 2005.
Renewables Integration Development Project North West of the Island of Ireland Louis Fisher, EirGrid.
Regulatory Planning for Supply to GTA & Toronto Areas Presentation to Regulatory Affairs Standing Committee May 14, 2003.
ATC Planning Zone Meeting Teresa Mogensen Director, Transmission Planning & Service Scott Barnhart Manager, Transmission Planning.
Module 2 Community Energy Planning within the Broader Provincial Energy Planning Framework.
Dale Osborn Midwest ISO October 13, 2008 EE 590 Transmission Planning with Significant Energy Resources.
Draft 2 – Staff Discussion Paper “Regulatory Options for Setting Payments for the Output from OPG’s Prescribed Assets” Presentation to Interested Parties.
Southwest Renewable Energy Transmission Conference May 21, 2010 This report contains transmission planning data that may be conceptual in nature and is.
June 2008 Windsor-Essex Electrical Service Needs and Solutions.
JACKSBORO TO WEST DENTON and WEST LEVEE TO NORWOOD 345-kV PROJECTS April 20, 2004 Transmission Services Operations.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
Distribution Systems-General
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. Southwest Connecticut RFP Markets Committee November 14, 2003.
LCRA TSC/ CPS Energy Transmission System Addition Regional Planning Group Project Jeff Billo Sr. Manager, Transmission Planning TAC ERCOT Public March.
TRANSMISSION INFRASTRUCTURE IMPROVEMENTS — Current Projects — The Center for the New West “ The Sun Valley Energy Roundtables 2006” November 30 – December.
Submitted To:- Submitted By:- Mr.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Presentation to the Ontario Energy Board East – West Tie Line Proposals OEB File No. EB
Houston Area Constraint Mitigation Project ERCOT Board of Directors March 15, 2005.
Sub Station.
SUB-STATIONS.
CLIC Civil Engineering & Infrastructure Working Group Meeting
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
Presenter: Peter Heidrich, FRCC – BES Drafting Team Chair
Windsor-Essex Electrical Service Needs and Solutions
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
HVDC Transmission Systems:
Presentation transcript:

Designation Process (EB ) and East-West Tie Line (EB ) March 23, 2012

2 Transmission Project Development Planning Board Policy –help transmitters to move ahead on development work in a timely manner; –encourage new entrants to transmission in Ontario bringing additional resources for project development; and –support competition in transmission in Ontario to drive economic efficiency for the benefit of ratepayers. Process to designate a transmitter for projects identified in the OPA’s Economic Connection Test.

3 Designation Process – Decision Criteria Organization; Technical capability; Financial capability; Schedule; Costs; Landowner and other consultations; and Other factors based on the evidence of the proceeding and taking into account the individual circumstances of the project.

4 Designation Process – Filing Requirements Preliminary Filing Requirements to solicit the information on the decision criteria were issued. –G Corporate fitness –Financial wherewithal –Technical expertise –Experience Project plan –Budget –Development and construction –Timing (w/milestones) –Consultation with affected parties

5 The East West Tie Expansion OEB Framework for Transmission Project Development –Filing Requirements and Decision Criteria (G ) Minister’s letter suggested designation for E-W tie from the Long-Term Energy Plan OPA’s Long Term Electricity Outlook for the Northwest and Context for the East-West Tie Expansion IESO’s Feasibility Study Board’s Minimum Technical Requirements Board’s announcement of designation process for the East-West Tie Line

6 Current Infrastructure in the East – West Corridor The existing connection between Lakehead TS and Wawa TS consists of a 230kV double circuit line with each circuit having ratings of 365 MVA continuous (at 93ºC) and and 465 MVA limited-time emergency (at 127ºC).

7 East-West Tie Line Project Definitions The OPA and IESO reports are concerning the East-West Tie Expansion. In order to be built and function, the East-West Tie Expansion would include 3 parts: 1.East-West Tie Line – conductors and poles from point to point. It is this portion of the expansion that is the subject of designation. 2.Transformer Station Upgrades to support reactive power requirements of the new line, completed by Hydro One within their existing stations. 3.Connection to the existing system including line disconnect switches.

8 East-West Tie Project Definitions East-West Tie Expansion 2. Transmission Station Upgrades 1. East-West Tie Line 3. Connection Marathon TS Wawa TS Lakehead TS

9 East-West Tie Line Requirements A new line that, in conjunction with the existing line, will provide total eastbound and westbound capabilities in the East-West corridor on the order of 650 MW, while respecting all NERC, NEPCC and IESO reliability standards. Lifetime of at least 50 years. Target in-service date: The East-West Tie Line is to be 2 segments: –Wawa TS to Marathon TS; and –Marathon TS to Lakehead TS. The demarcation points of each segment are the first transmission line structures outside the fence of the Wawa TS, Marathon TS and Lakehead TS, but within 250 metres of that fence. The East-West Tie Line segments will dead-end on the demarcation point structures with a mid-span opener for non-compensated lines. If the proposal involves series compensated AC line or DC lines, the East-West Tie Line will include the protection system, associated communications, and line isolation breaker(s). The project definition for the purposes of designation assumes that the East-West Tie Line between the demarcation points will be owned and operated by the designated transmitter.

10 After Designation After being selected, the designated transmitter will have to co-ordinate with: OPA: to refine the need for the line as part of the development of the line. IESO: to determine reactive power requirements of the new line if proposal different than reference option. Hydro One will develop costs for reference and other options based on information from the IESO. Hydro One: to determine responsibility and costing for connection to the existing system (should be a consistent cost regardless of the proposal).

11 The Reference Option The Reference Option is one possible proposal for the East-West Tie Line. –It is taken from the OPA and IESO reports. –It is not the default position of the Board but is to be used for comparative purposes during the designation process. –The Reference Option specifies that the East-West Tie Line will be a new double-circuit 230 kV overhead transmission line with with each circuit having ratings of 465 MVA continuous (at 93ºC) and and 600 MVA limited-time emergency (at 127ºC). –The East-West Tie Line will be switched at Marathon TS. –Specific conductor size as per the IESO study. –Minimum Technical Requirements and Appendix A apply.

12 Other Technical Solutions Require an IESO feasibility study (or study done to IESO requirements). –May have station upgrade implications. Station requirements will be sent by the IESO to Hydro One for approximate costing. Evidence that solution is equivalent or superior to the Reference Option. Other cost implications should be explained.