Project Management Information Systems and Management.

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT TOOLS AND TECHNIQUES
Advertisements

CP Chapter 4 Schedule Planning.
Chapter 17 Project Management McGraw-Hill/Irwin
Project Management Information Systems and Management.
Project Management Process. Managing the Information Systems Project Focus of project management To ensure that information system projects meet customer.
 Chapter 6: Activity Planning – Part 1 NET481: Project Management Afnan Albahli.
Chapter 3 Managing the Information Systems Project
3-1 © Prentice Hall, 2004 Chapter 3: Managing the Object-Oriented Information Systems Project Object-Oriented Systems Analysis and Design Joey F. George,
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Scheduling the Project
© 2005 by Prentice Hall Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition Jeffrey A. Hoffer Joey F.
Scheduling The Project  Scheduling Planning, budgeting and scheduling are all part of the same process Planning a project, developing a budget for it,
Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Sixth Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
Chapter 3 Managing the Information Systems Project
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
© 2008 by Prentice Hall 3-1 ITCS311 Systems Analysis and Design Dr. Taher Homeed Feb 2010 Department of Computer Science College of IT University of Bahrain.
MGMT 483 Week 8 Scheduling.
Systems Analysis and Design 9th Edition
Project Management: A Managerial Approach
Copyright 2012 John Wiley & Sons, Inc. Chapter 8 Scheduling.
Importance of Project Schedules
Modern Systems Analysis and Design Third Edition
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Chapter 3 Managing the Information Systems Project
Chapter 3 Managing the Information Systems Project
Workshop-3 Gantt and Pert Chart.
HIT241 - TIME MANAGEMENT Introduction
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Chapter 3 : Managing the Information Systems Project.
Time Management Week 7 - Learning Objectives You should be able to: n List and describe the processes, activities, inputs, and outputs in time management.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
© 2005 by Prentice Hall 3-1 Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition.
Appendix A Project Management: Process, Techniques, and Tools.
Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Seventh Edition Jeffrey A. Hoffer Joey F. George Joseph S. Valacich.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
Project Management: A Managerial Approach
Project Management: A Managerial Approach
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
Project Scheduling Project Management 517 Chapter 8 Prof. M. Anvari
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
Work Systems and the Methods, Measurement, and Management of Work by Mikell P. Groover, ISBN ©2007 Pearson Education, Inc., Upper Saddle.
Managing the Information System Project Dr. Dania Bilal IS 592 Spring 2005.
Managing Resources Program Evaluation and Review Technique (PERT) Production Process.
Chapter 8 Scheduling © 2012 John Wiley & Sons Inc.
PROJECT MANAGEMENT Approaches
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Lecture 61 Project planning tool Lecture 62 Objectives Understand the reasons why projects sometimes fail Describe the different scheduling tools, including.
Chapter 3 Managing the Information Systems Project
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Project Time Management Ashima Wadhwa. Schedule Development – Determining start and finish dates for project activities – Without realistic dates, project.
© 2006 John Wiley and Sons, Inc. Project Management: A Managerial Approach Chapter 8 – Scheduling.
Project Time Management
Lecture 3 Part 1 Managing the Information Systems Project.
PROJECT MANAGEMENT TOOLS AND TECHNIQUES SEMINAR December 2003.
Project Management Planning and Scheduling. “Failing to plan is planning to fail” by J. Hinze, Construction Planning and Scheduling Planning: “what” is.
Chapter 3 Managing the Information Systems Project
PROJECT MANAGEMENT.
Project Management Systems
Managing the Information Systems Project
Chapter 17 Project Management McGraw-Hill/Irwin
Project Scheduling
Project Planning & Scheduling
Project scheduling Chapter 10 Copyright ©2016 Pearson Education, Inc.
Modern Systems Analysis and Design Third Edition
Importance of Project Schedules
Project Management Project management is the discipline of organizing and managing resources in such a way that these resources deliver all the work required.
Modern Systems Analysis and Design Third Edition
Scheduling.
Presentation transcript:

Project Management Information Systems and Management

Project A planned undertaking of a series of related activities to reach an objective that has a beginning and an end. Versus Process on going and repetitive

Systems Development Projects are undertaken for Two Primary Reasons 1.Take advantage of a business opportunity 2.To solve a business problem

Project Management 1.Project Initiation Assess the size, scope, and complexity 2.Project Planning Define clear, discrete activities and the work needed to complete each activity

Project Management Work Breakdown Structure (WBS) The process of dividing the project into manageable tasks and logically ordering them to ensure a smooth evolution between tasks *Estimating

Project Management 3. Project Execution –Plans are put into action I.Execute Baseline Plan II.Monitor Progress III.Manage Changes to Baseline A.Re-do activities B.Revise Completion Dates C.Modify functionality

Project Management 4. Project Close –Bring project to an end –Successful or not –Starvation: Cut budget

The Mythical Man-Month by Brooks When working with an intellectual medium that has few physical elements, such as I.S., we are highly optimistic and foolishly assume that all will go well. PM’s may assume that workers and time are interchangeable. More workers will require more communication which will not directly off-set time.

Brooks’ Law Adding manpower to a late software project makes it later.

Parkinson’s Law The work done on project elements is almost certain to “expand to fill the additional time”.

Project Control The process of monitoring the actual project to see whether it is meeting the objectives detailed in the project plan. Analysts must continue to monitor a project throughout its lifespan Slippage – falling behind schedule –Add more resources –Allow more time (admit estimates were wrong –Trim tasks Scope Creep – expanding commitments

Portfolio Analysis High Low High Project Risk Potential benefits to Firm

Bar Charts

GANTT Charts Henry L.Gantt – 1917 Show planned and actual progress Advantages –Easy to understand –Easy to maintain –Provides a clear picture of the project’s current status.

Network Techniques Program Evaluation and Review Technique (PERT) Critical Path Method (CPM) The two methods are quite similar and are often combined

PERT Projects can be described in a very formal way by structuring them as a network of activities Activities: Basic jobs, tasks, or operations that must be performed –May be sequential or parallel –Represent the passage of time Events: Mark the beginning or end of an activity, represents points in time Activity:Event:

PERT Notation Activity Event

PERT - Example

A B (5,9) [0,5] (O,5) [9,13] [12,21] [5,12] E (12,21)C (5,12) [13,21] [21,25] D (9,17) F (21,25)

What is the Critical Path? Slack Time Critical Path A-C-E-F

Dummy Activities Used whenever two or more activities have some but not all of their immediate predecessors in common

A F C D B E

Dummy Activity Takes zero time Used to maintain correct relationships Used to diagram concurrent examples

Two Network Conventions Activity on Arrow (AOA) Activity on Node (AON)

Estimating in PERT PERT suggests developing three time estimate for each activity 1.Optimistic 2.Most likely 3.Pessimistic Then apply formula Te = To + 4Tm + Tp 6 Te = expected time To = optimistic time Tm = most likely time Tp = pessimistic time

PERT Estimate Example

Project Management Information Systems and Management