G ateway P rogram Off-corridor Habitat Enhancement PMH1 IAERC November 25, 2009.

Slides:



Advertisements
Similar presentations
Kevin L. Hoover Waters Edge Hydrology, Inc. – Wetland Conservation Approaches.
Advertisements

MBTA Groundwater Action Plan Dr. Steve J. Poulos, P.E.
Dulles Corridor Metrorail Project Status Update Fairfax County Transportation Advisory Commission November 16, 2010 Richard Stevens Fairfax County Department.
Sleepy Creek Watershed Association Riparian Planting Project Gale Foulds, Sleepy Creek Watershed Association Barbie Elliott, West Virginia Conservation.
Kitchen Creek CREP & Stream Bank Stabilization Project Project Sponsors: Greenbrier Valley Conservation District West Virginia Conservation Agency U.S.D.A.
Buffalo Lake Dam Project Update date Meeting June 30, 2012.
Assessment of Class S4 Streams in the Central Interior to Evaluate Riparian Practices Implemented under the Forest Practices Code Peter J. Tschaplinski.
Riparian Zone Habitat Assessment Vegetation and More.
Riparian Plants of the Bear Creek Watershed December 2009.
2010 Squak Valley Park Restoration Project City of Issaquah.
Village of Alden Stormwater Pictorial view. Here is a view of rainfall and notice how the water carry’s away from the center of the road to the sides.
Slideshow B6: Human impact on the natural environment.
Whittell Forest. Jeffrey Pine Forest The Jeffrey pine forest is the dominant habitat in the Whittell Forest, covering nearly 1,800 acres and about two-thirds.
Kalispel Tribe Resident Fish Program Hatchery - Wayne Gould Habitat- Michele Andersen.
Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research Program Restoration of Chamberlain Creek Amy Clinefelter Riparian Wetland Research.
Stream Restoration Techniques
Department of Forestry 2004 Stream Habitat Restoration Guidelines
Rinearson Pond A pretty place. This pretty place has been created by the minds and hands of many people. Unfortunately, upon close examination, many plans.
Minnehaha Creek – Reach 14 Streambank Improvement Project.
The Important Thing About Plants
Ecology and environment, inc. International Specialists in the Environment The McKinstry Creek & Riparian Area NYSDOT Rt. 219 Mitigation Project Analysis.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
Clackamas River Basin Council Lower Columbia River Conservation and Recovery Plan Implementer’s Perspective August 19, 2013.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
A VENBURY L AKES 2012 S PRING K ICK O FF Brickman March 2012.
Channel Modification Washington Dept. Forestry, 2004, Channel Modification Techniques Katie Halvorson.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Icicle Creek Salmon Habitat Conditions* Land Development has affected stream channel movement, off channel habitat, and LWD recruitment. Barriers to migration.
Marin Coastal Permit Coordination Program. Why do we need a program? Called for in Watershed Plans: As many as 9 permits to consider for restoration.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Mission, Brender, and Yaksum Creeks Habitat Conditions Low flows and associated high temperatures affect distribution and abundance of native species.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No. 606 Technical Meeting May 16, 2007, 1-4 pm Red Lion Redding, CA.
Understanding Creeks, Rivers, and Riparian Areas.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
Riverside County Flood Control and Water Conservation District Murrieta Creek Flood Control, Environmental Restoration and Recreation Project June 2006.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Fish Habitat Restoration.
Dry Creek Fish Habitat Enhancement Feasibility Study Current Conditions Summary.
PRESENTATION & DISCUSSION Dave Bergen Southold Town Trustee July 18, 2015.
SOIL SUITABILITY AND MANAGEMENT FOR POTATO PRODUCTION NextEnd.
Importance of the Lower Wenatchee River in Salmon Recovery* The Lower Wenatchee is a critical migration corridor for all ESA listed species Of the total.
Coos Watershed Association Watershed Restoration Projects.
NOAA RESTORATION CENTER The NOAA RC seeks to make the process of regulatory review and permitting of environmentally beneficial habitat restoration projects.
Nason Creek Salmon Habitat Conditions* Development, and road building have affected riparian (streamside) habitat, large woody debris and gravel recruitment.
Traders Point Gateway Project Recreating a Natural Landscape around the INDOT Maintenance Unit.
Planning Habitat Restoration for Dredging Projects WEDA Midwest Chapter Conference Green Bay, Wisconsin April 27, 2012 Jack Brunner.
Hangman Creek Fisheries Enhancement BPA Project & Hangman Restoration Project: Wildlife BPA Project
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Clearing and Site Preparation and Site.
The role of woody debris in riparian zones Jon M. Flinders.
Design and Implementation of Large Wood Structures at Twelvemile Creek Prince of Wales Island Tongass National Forest The Nature Conservancy TEAMS Enterprise.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
Apalachicola River, Floodplain and Bay Largest forested floodplain in Florida (112,000 acres) Highest Species Diversity of any River System in North America.
Planning Commission Study Session: Preferred Plan July 23, 2015.
Ad Hoc Fort Ward Management Plan Implementation Monitoring Group Meeting January 21, 2016.
City Council Presentation Progress Report No. 12 For September 2006 November 6, 2006.
Seasons. What do we know about seasons? What is a season? How many season do we have? What season are we in right now?
PNAMP Monitoring Terminology Data Dictionary The meta data file provides a better explanation of the project’s intent. The estuary work group is still.
MASON GULCH LANDSCAPE MANAGEMENT PLAN PUBLIC MEETING August 4, 2016.
Plaistow BOS Meeting 7/24/2017
Black Creek Streambank Stabilization Projects
Department of Forestry 2004 Stream Habitat Restoration Guidelines
Mason Gulch landscape Management plan Public meeting
When should you fix a stream????
NATIVE FORESTS Chapter 14.
This photo was taken in August 2008.
Natural Resource District
Shelterwood and clearcut
Riparian Vegetation.
When should you fix a stream????
Presentation transcript:

G ateway P rogram Off-corridor Habitat Enhancement PMH1 IAERC November 25, 2009

Gateway Program PMH1 Off-Corridor Habitat Enhancement: Review and current status on PMH1 off-corridor habitat works  Brae Slough – Implementation  Mundy Creek – Implementation  Wilson Farm – Concept

Gateway Program Brae Island Implementation – Schedule Overview DateActivity Mid-SeptemberTree removal, brush clearing, wildlife salvage, Glover Road pond excavation, and channel excavation Late SeptemberTemporary gas line crossing Early OctoberExcavation north of gas line, LWD installation, seeding and straw. Mid-OctoberCompletion of channel excavation Late OctoberRiparian planting Early DecemberComplete hydraulic connection Spring 2010Marsh bench planting

Gateway Program Brae Slough Implementation: Straw Placement September 29, 2009: Covering exposed channel slopes with straw

Gateway Program Brae Slough Implementation: Amphibian Salvage October 2, 2009: Long toed salamander salvaged.

Gateway Program Brae Slough Implementation: Glover Pond – Placing root wad October 6, 2009 – Placing cottonwood LWD in Glover Road Pond

Gateway Program Brae Slough Implementation: In-line pond October 8, Completed in-line pond, with LWD complexing.

Gateway Program Brae Slough Implementation: Planting November 3, 2009: Willow cuttings and planted stock along riparian bench

Gateway Program Brae Slough: November 3, 2009 – View of Brae slough enhancement from Glover Road

Gateway Program Mundy Creek Implementation Excavation complete for loop channel. LWD placement on loop channel complete. Riparian planting on north leg of channel loop (primarily hardhack and salmonberry) complete. Excavation of the channel extension has been initiated but not complete pending approval from the utilities and regulatory agencies. Hydraulic connection anticipated for summer 2010.

Gateway Program Mundy Creek - Implementation Excavation has been undertaken to ensure the channel and banks are roughly textured leaving a high proportion of overlying organic soil in place to provide an organic growing medium for plants.

Gateway Program Mundy Creek – LWD Placement Wood debris placement along north arm of channel looking west.

Gateway Program Mundy Creek Implementation: Complexing Tree stem anchoring. Cable attached to eye cemented in to buried boulder

Gateway Program Mundy Creek Implementation: Complexing October 8, 2009: Preparing anchor boulders.

Gateway Program Mundy Creek Implementation: Planting North leg showing planting densities. Planks placed to provide access across channel for planting crew.

Gateway Program Mundy Creek Implementation: Planting North leg of channel looking west showing woody debris placement and riparian planting

Gateway Program Wilson Farm Concept Development – Schedule Overview DateActivity Summer - Fall 2008Fish and amphibian sampling, channel survey Fall 2008–Winter 2009Modeled tidal flap gate on Wilson Farm March 2009Charrette on Colony Farm Parks Sustainability Plan. Early November 2009Preliminary concept, reviewed by Metro Vancouver Parks Late November 2009Met with Colony Farm Park Association Early December 2009Technical Design Team Workshop Winter 2010Refine design March 2010Public consultation on Sustainability Plan

Gateway Program Questions?