Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:

Slides:



Advertisements
Similar presentations
AIRWORTHINESS ASPECTS OF AIRCRAFT LEASING
Advertisements

August 28, 2009 Federal Emergency Management Agency Public Assistance Arbitration Process.
ODOT Structure Project Management Seminar Bridge Preliminary Design Report.
Barhale Procedure for Site Establishment
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Background Presenters Work done in preparation for WHS changes
Drawings of Sufficient Detail
Introduction to EIS/EA Managing the Environmental & Project Development Process Presented by the Ohio Dept. of Transportation.
Utility Course Case Studies CEA and Road Builders Workshop Joe Mah, M.Eng.P.Eng.
Environmental Project Commitments The Alberta Experience
FOIA and NEPA Federal Highway Administration Environmental Conference June 2006.
Chapter 3 Project Initiation
Cairo 2 November Agenda  Guidebook overview  Supporting and explanatory materials  Guidebook Module detail  Probable timelines 2.
Learn. Perform. Succeed. Protest, Claims, Disputes and Appeals Chapter 7.
The Federal Regulator’s Perspective Industrial Railway Safety Conference Fort Saskatchewan, Alberta April 28, 2015.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
Release & Deployment ITIL Version 3
Environmental Impact Assessment Prepared by: Miss Syazwani Mahmad Puzi School of Bioprocess Engineering UniMAP.
Standards experts. Accreditation solutions. Andrea Spencer Coordinator, WTO/NAFTA Enquiry Point (Canada) TBT Special Meeting on Procedures for Information.
1 Brace Centre for Water Resources Management McGill University, Sept. 25 François Boulanger, Regional Director The New Canadian Environmental Assessment.
VIRGINIA PUBLIC-PRIVATE EDUCATION FACILITIES AND INFRASTRUCURE ACT OF 2002 (PPEA) Augusta County Board of Supervisors Wednesday, January 6, 2009.
Old Policy – which no one ever seem to have heard of.
THE FOUR STEP SECTION 106 PROCESS: AN INTRODUCTION TENNESSEE STATE HISTORIC PRESERVATION OFFICE REVIEW AND COMPLIANCE SECTION All reproduction rights reserved.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
 Do you have an Interest in Math and Science?  Do you have good problem solving skills?  Do you approach problems in an analytical manner?  Can.
Module 10 Session 10.4 Visual 1 Module 10 Organizing Procurement Session 10.4 Procurement of Services: Use of Consultants and Developing Terms of Reference.
CHAPTER 3 SCOPING AND AGENCY COORDINATION. Scoping - the procedure for determining the appropriate level of study of a proposed project/activity - process.
Productive SB 18 Consultation Michelle LaPena, Esq. LaPena Law Corporation 2001 N Street, Suite 100 Sacramento, CA (916)
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
Public-Private Education Facilities and Infrastructure Act 2002 (PPEA) Joe Damico.
2010 CDBG Recipients’ Workshop The Housing Rehabilitation and Reconstruction Monitoring Reviews… How to Successfully Pass.
Positive Train Control Infrastructure: Section 106 Review Process under the Advisory Council on Historic Preservation’s May 2014 Program Comment For More.
August 28, 2009 Federal Emergency Management Agency Public Assistance Arbitration Process.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Superstructure and Bridge Replacements in Regions 2 & 9 Design-Build Project (PIN , D900022) Herkimer,
MODU Safety Committee Objective The objective of this Procedure is to establish the terms of reference for the Safety Committee on board the MODU.
Developing Plans and Procedures
Avoid Disputes, Not Complaints Presented by: Stuart Ayres and Derek Pullen Stuart Ayres, Scheme Manager Derek Pullen, Scheme Adjudicator.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
Kentucky Transportation Cabinet
Federal Energy Regulatory Commission The Pre-Filing Process IRWA/AI January 13-14, 2009 IRWA/AI.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
Applicant: eThekwini Transport Authority Environmental Consultants Engineers Pravin Amar Development Planners Iliso Consulting.
1. 2 Background Bill C-3, International Bridges and Tunnels Act: –introduced in the House of Commons on April 24, 2006 –received Royal Assent on February.
Interim Alternate Route Adjustment Process Joint Training INTERIM ALTERNATE ROUTE ADJUSTMENT PROCESS Joint Training October 31, 2008 INTERIM ALTERNATE.
BENEFICIAL USE Declarations & Apportionment Water Rights Addenda Passed in 2010; effective Applies to deeds that – Convey fee simple.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
Specific Safety Requirements on Safety Assessment and Safety Cases for Predisposal Management of Radioactive Waste – GSR Part 5.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Budget Formulation 2017/2018 A review of the 2017 process and the 2018 process. Office of Budget and Performance Management November 2015.
Mackenzie Valley Environmental Impact Review Board Presentation of Technical Submission Avalon Rare Metals Inc. Thor Lake Rare Earth Element Project February.
CLOSE PROJECT OR PHASE CLOSING PROCESS GROUP PROJECT INTEGRATION MANAGEMENT.
Texas Department of Transportation Corpus Christi District U.S. 181 (Harbor Bridge) Environmental Documentation and Schematic Development Citizens’ Advisory.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Public.
Incorporating Road Safety Audit into Development Control Kevin Nicholson Principal Consultant.
PURPOSE & NEED Categorical Exclusion Training Class.
The Housing Rehabilitation and Reconstruction Monitoring Reviews… How to Successfully Pass.
ISO Session 3 Environmental Management and Ethics in Management.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
AEMCPresentation to GWCFPAGE 1 AEMC and Rule changes Presentation to AEMO Gas Wholesale Consultative Forum Kamlesh Khelawan Director This presentation.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
An Overview of Stakeholder Roles and Federal Legislation at Grade Crossings May 18, 2016 presentation to CPWA Saskatchewan Chapter, Saskatoon Railway Safety.
Dispute Resolution Between ICT Service Providers in Saudi Arabia
Inspector's Role and Responsibilities
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
GMP Inspection Process
Supporting SEACs across the Province:
Presidential Permits Implementing EO 13337
FIRE UPGRADES OF EXISTING BUILDINGS
Presentation transcript:

Railway Grade Separations Issues

Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations: Must have good working knowledge of geometric design of roadway facilities. Must have good working knowledge of the TAC and AT’s guidelines.

Railway Grade Separations Must have good working knowledge of bridge planning with regard to undertaking life cycle costs, bridge assessments, written reports, among other things. Must have a good working knowledge of the different structure types and must be able to work out preliminary structure cost estimates.

Railway Grade Separations Must be able to communicate with the Agency, Transport Canada and the Railway companies both verbally and in written form. Must be aware of the environmental requirements that are associated with a grade separation approval.

Railway Grade Separations Must have a good working knowledge of assembling Design Data drawings and structure outline drawings.

Railway Grade Separations Under the Canadian Transportation Act (CTA), which came into effect on July 1, 1996, the Railway and Road Authorities are expected to reach an agreement between themselves on crossing matters. If a mutually acceptable agreement is not possible or if either party needs to have the matter resolved in no more than 120 days, an application may be made to the Agency.

Railway Grade Separations Definitions a)An established crossing b)Seniority/new route c)A grade separation d)A basic grade separation/future facilities e)An overhead bridge f)A subway g)A road authority

Railway Grade Separations Definitions Cont’d. h)A railway company (CNR, CPR and Shortline) i)Canadian Transportation Agency (Agency) j)Transport Canada (TC) k)The Guidelines on Apportionment of costs of Grade Separations

Railway Grade Separations Definitions Cont’d. l)Cross-product m)New construction/reconstruction

Railway Grade Separations 2.Project Initiation and Preliminary Assessment Road Authority identifies project and places it on their current program Project is classified as being associated with either road construction or spot improvement

Railway Grade Separations All previous files, reports, approvals, agreements, Board Orders, etc. are reviewed to determine the background of the crossing. Previous Orders, Decisions and Agreements can be obtained from the Agency in Ottawa. The cross-product between vehicles and trains is also determined at this stage.

Railway Grade Separations The feasibility of constructing a grade separation vs. an at-grade crossing is assessed and a decision made on the best course of action for the site. A site inspection is encouraged during the preliminary assessment stage.

Railway Grade Separations The Railway is contacted to determine their requirements in writing. –Clearance box, number of tracks required, ditch section, track superelevation if on curve, etc. Determine what constitutes the Basic Grade Separation. –Review the proposed structure types selected for the site to determine their acceptability.

Railway Grade Separations Upon receiving the Railway’s input, various structure alternatives are produced. Life cycle costing is undertaken where applicable. In summary, a complete functional planning study is undertaken to establish the alignment, over vs. under, standards, preliminary costs, life cycle costs, and recommendations.

Railway Grade Separations A report is produced that summarizes all the findings. The bridge planner is involved in carrying out the analysis and producing the final report.

Railway Grade Separations 3.Preliminary Engineering and Preparation of Design Data (DD) Drawings Survey and geotechnical information, environmental studies, historical impact overview, etc. are gathered.

Railway Grade Separations A determination is made as to who is senior at the crossing, i.e. who has responsibility at the crossing with respect to cost apportionment. A position is developed for the crossing with respect to the clearance box and cost apportionment.

Railway Grade Separations The Railways are again contacted at this stage to determine if the previous information that they supplied is still current. It is desirable at this stage to select the best grade separation option for the crossing. It may be necessary to discuss the different options with the Railway, if required.

Railway Grade Separations When a final recommended grade separation alternative has been selected, DD drawings are produced. The DD drawings are in accordance with Alberta Transportation’s Engineering Consultant Guidelines for Highway and Bridge projects.

Railway Grade Separations At this stage, a structure outline drawing is also produced that indicates the type of structure.

Railway Grade Separations 4.Negotiation of an Agreement with the Railway Upon Completion of the Design Data and structure outline drawings, negotiations are commenced with the Railway to produce an agreement to carry out the work. The agreement, when completed, is forwarded to the Agency for their files and records. The agreement becomes an Order of the Agency.

Railway Grade Separations In the event that an agreement cannot be reached with the Railway due to issues with dispute, an application is submitted to the Agency requesting them to arbitrate the issues.

Railway Grade Separations The Agency issues a Decision with regard to the issues in dispute which enables the Road Authority and the Railway to complete their agreement allowing construction to proceed.

Railway Grade Separations 5.Submission of the “Notice of Works” Upon completion of the Design Data (DD) drawings, a “Notice of Works” is also forwarded to the landowners, located in the four adjacent quadrants of the project.

Railway Grade Separations A copy of the “Notice of Works” is also forwarded to Transport Canada, the Railway, and the Agency for their comments. Transport Canada is involved if there is a safety issue arising from the Notice. In this case, approval must be received from Transport Canada before construction of the project commences.

Railway Grade Separations 6.Preparation of a CTA Submission CTA’s application procedure Preparation of the environmental assessment Cost apportionment guidelines

Railway Grade Separations Determination of the basic grade separation and future facilities Determination of the grade separation costs Determination of maintenance responsibility

Railway Grade Separations 7.Approval of Detail Structure Drawings In the case of an overhead bridge, the Road Authority must provide the Railway with a set of detailed structure drawings for their review. Similarly, if a subway is involved the Railway must submit a set of their detailed structure drawings to the Road Authority for their review.

Railway Grade Separations The Agency should receive a copy of the correspondence that this review has taken place. The Agency does not review the drawings for detail or content and no longer approves the drawings.

Railway Grade Separations 8.Summary It is essential that the proper procedures are followed at the at-grade stage, for example transfer of seniority, in order to establish the responsibilities of each party involved. These responsibilities are carried forth for many years and are normally a factor in establishing cost apportionment for future upgrades including construction of grade separations, if required.

Railway Grade Separations An Interprovincial committee, the Railways, and the Federal Government negotiated for almost 20 years to develop a new guideline that addressed the cost apportionment issues associated with grade separations. It is, therefore, important for Road Authorities to maintain a certain amount of control in the area of cost apportionment of grade separations.

Railway Grade Separations This will ensure that the present guidelines are not abandoned by precedent setting cases and ensure that the public interest is protected.