2008 Bridge Planning Seminar Design Data Drawing Layout.

Slides:



Advertisements
Similar presentations
Railway Grade Separations Issues. Railway Grade Separations 1.Introduction Qualifications/experience to undertake bridge planning for railway grade separations:
Advertisements

Chapter 3 Topographic Maps
Chapter 3 Topographic Maps
Site Grading Site Grading Civil Engineering and Architecture
1 CTC 261 Hydraulics Culvert Design. 2 Objectives  Know the factors associated with culvert design  Know what a skewed culvert is.
Summary of Conceptual Design Site 3 Causeway Landfill Culvert Stabilization Marine Corps Recruit Depot Parris Island (CTO JM38) 19 August 2014.
CE / AL Geography Map Reading Skills and Techniques.
Plot Plans & Legal Descriptions. Site or Plot Plans  A plot or site is an area of land generally one lot or construction site in size  The term plot.
Measuring Sitework, Excavation, and Piling
Bridge Engineering (7) Superstructure – Reinforced Concrete Bridges
AUTOCAD CIVIL3D 2013.
Design of Culverts. Culvert Design - Basics Top of culvert not used as pavement surface (unlike bridge), usually less than 7 m.
Design of Open Channels and Culverts
Profile Leveling.
1 Automated Machine Guidance: Electronic Files and Design Data AASHTO Subcommittee on Construction Meeting August 18, 2010 – Burlington, VT Mark Taylor.
PSC 121 Prince George's Community College
Chapter 13 Site Plan Layout.
ENGINEERING SURVEYING & PHOTOGRAMMETRY CVE 314
Profile elevations Sometimes the profile is too steep to illustrate on our profile sheet so we have to break the profile. This partial profile illustrates.
Hydrotechnical Considerations
Chapter 18 Working Drawings.
EQ: How are elevation, relief and slope shown on a topographic map?
E4014 Construction Surveying Route Location Surveys Reconnaissance Survey Investigation Survey Working Survey Construction Survey.
Project Manager: Tim Brown Project Editor: Tabatha Doughty Project Engineer: Drew Furry Project Engineer: Jim Walter.
Contour lines. Contour lines: curved lines drawn on the map, connecting points having the same elevation.
TOPOGRAPHIC MAP.
2013 Section Engineer’s Meeting.  Correct Type, Gauge, and Coating (Standard Drawings)  Based on Pipe Diameter, Fill Height & Soil pH  Obtain copy.
1 Introduction to QA/QC Process. 2 CHECKLISTS SheetsItems to CheckGeneral Reference YesYes NoNo N/AN/A General General Plan Content DM=Design Manual General.
ES050 – Introductory Engineering Design and Innovation Studio Civil Engineering Design Prof. Jon Southen November 12, 2008.
© 2011 Autodesk CI3865-Incredible AutoCAD® Civil 3D® Users: Prove your Credibility with Civil 3D Certification, Part 2 Michelle Rasmussen Training Manager.
Prepared for: NEW YORK STATE PLANNING FEDERATION April 14, 2015 Prepared by: BME ASSOCIATES Peter G. Vars, P.E. Essential Skills: Reading and Interpreting.
Map Reading and Interpretation Symbols and Color Coding.
Location Surveys I. Traditional Highway Location: 1. field-oriented work 2. *Procedures 1) The first step: Reconnaissance of the area using available topographic.
Topographic Maps Forget what you know about degrees and minutes.
Roadway Preservation Intranet Page. Location: Intranet/Roadway-Preservation.aspx.
St. Croix River Crossing S.P Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction.
CE303: Introduction to Construction Blueprint Lab.
Chapter 15 Site Plan Layout. Introduction Site plans can be drawn on media ranging in size from 8 ½" × 11" up to 34" × 44" –Depends on purpose –Many local.
Map Skills 3 ‘OS Symbols’  To understand how we use map symbols to identify different places on a map. 1. Explain the terms ‘Symbols’ and ‘Key’. What.
Uniform Open Channel Flow
IRWA Educational Mini Conference IRWA Educational Mini Conference Chapter 26 Presenter: Richard Diaz, Jr. P.E. September 16-17, 2010  Reading Right-of-Way.
CE303: Introduction to Construction Blueprint Lab.
Chapter 16 Site Preparation. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify tasks required.
Recent Guideline Changes 1 Recent AT Guideline Changes Existing Documents New Technical Documents Bridge Structure Design Criteria Bridge Design Bulletins.
AT FPS Bridge Planning Expectations 1 Bridge Planning Seminar 2008.
HIGHWAY DESIGN PROCESS & ROUTE LOCATION Spring 2016.
Bridge Hydraulics and Geotechnical. BRIDGE HYDRAULICS AND GEOTECHNICAL TECHNICAL STANDARDS BRANCH INTRODUCTION TO BRIDGES TRANSPORTATION Slide 2 The Hydrological.
SEMBODAI RUKMANI VARATHARAJAN ENGINEERING COLLEGE DEPARTMENT OF CIVIL ENGINEERING FOUNDATION ENGINEERING BY KARTHIVELU.
Seventh Edition By David A. Madsen, Terence M. Shumaker, and David P. Madsen Civil Drafting Technology Chapter 12 Earthwork.
How do I use map symbols to find landmarks in my local area?
Civil Engineering Surveying Roy Frank. Basic Route Survey and Design 1.Concept for Route 2.Reconnaissance Study 1.Small scale mapping of region (1”-500’
Gujarat Institute of Technical Studies name: Patel Savan Vasudevbhai Semester: 3 st Sem. Branch: Civil Engineering Enrollment No. : Sub: surveying.
What does a Civil Engineer do?
Required Drawings and Info for Formwork or Scaffold Design
Bridges Reach analysis Fundamental tool for design
AUTOCAD CIVIL3D 2013.
LEVELLING This deals with the determination of the relative heights of points on the earth’s surface. The process of this determination is either direct.
Bridge engineering.
PSC 121 Prince George's Community College
Course Contents Culverts Bridges Buildings 20 November 2018.
Manned Boat ADCP Deployment
Bridge Planning Why - Purpose Who - Bridge Planner
Bridge Planning Case Studies
Chapter 15 Site Plan Layout.
Site Plan Requirements
Level 2 BIM - RPW Scour Survey Level 2 BIM RPW Inspection Case Study
Bridge Planning Layout Tools
CROSS-SECTION OF A MEANDER
PSC 121 Prince George's Community College
Shaver Creek Permitting
Presentation transcript:

2008 Bridge Planning Seminar Design Data Drawing Layout

Bridge Planning Drawings Generally prepared for major bridge structures Referred to as Design Data or DD Drawings Used to consolidate survey, hydrotechnical, highway design and geotechnical information Documents bridge planning design Can be used to present design alternatives Generally 2 two 3 drawings. Additional drawings may be required to show unique details. DD Drawings not used for construction. Drawing information used by structural designers to produce detailed design/ construction drawings.

Design Data Sheets Generally 1 or 2 sheets. First DD Sheet: Site Map, Notes and Bridge Section Notes: Survey By, Benchmarks, Hydrotechnical Summary, General Notes Site Plan view: Crossing location, skew, approach fills, headslope protection works, river training Elevation view: Existing ground lines / sods, design gradeline, channel bedwidth, headslopes, bridge out to out opening, design highwater/ ice elev, min bottom girder /flange elev, headslope protection, test holes DD Drawings can also be used for major bridge culvert structures, grade separations, railway crossings

Boyer River Bridge - Design Data Sheet

Smoky River Bridge - Design Data Sheet 1

Smoky River Bridge - Design Data Sheet 2

Mosaic Profile Airphoto Mosiac: Details parcel mapping, land titles, bridge location Streambed Profile: Surveyed profile of channel bed and water / ice level, average channel slope Road / Highway Profile: Details existing centerline ground / sod profiles, new design gradeline, bridge opening, highwater

Boyer River Bridge - Mosaic Profile

Smoky River Bridge – Mosaic Profile

Issues DD Drawings are required on as need basis based on discussion with structural designers and client. Detailed sketches may be adequate. Interaction with structural designers during bridge planning process. Determine possible span arrangements, structural depths, pier locations, etc. Grid –To – Ground Survey, Combined scale factor, Design Bulletin 34 Test holes: Several ways to show on drawing. Ensure holes are surveyed correctly.

Issues Airphoto for mosaic profile: Several programs available for correcting image. Determine if mosaic just for presentation to determine effort in processing image. Ortho-corrected airphotos are available. Highway/ Road Profile: Centerline finished crown or subgrade Showing new construction tying into existing fills Stationing bridges on curve on divided highway Other Issues…. Open for discussion.