How to apply a TXV kit to an evaporator coil – Initial installation

Slides:



Advertisements
Similar presentations
RP4A 2½ – 6. Modification Overview Production of the RP4A series began in Production of the RP4A series began in A Lead free version (4ALF)
Advertisements

RP4AN 21/2 – 6. Modification Overview Production of the RP4AN series began in Production of the RP4AN series began in The 4AN indicates an.
#30 Ignition/Starter Switch #54 To Radio Fuse 1 Instrument Power Ignition Coil Red wire with bullet Long black wire with bullet. Wire was.
Conscious (gag reflex)
A/C Design Verification Tests A/C Performance: –Conducted at 43 C (110F) –Vehicle is soaked till average interior temperature reaches 140 F and then tested.
Corning Cabelcon 1. 2 To begin with – we need some tools… Cable cutter Cabelcon Rotary Stripper Mounting tool Compression tool Please read the instructions.
SWEDISH EMERGENCY DISASTER EQUIPMENT PREPARATION & DONNING PPE.
Charging. Charging Step 1 Should the lineset length of an installation exceed the charge supplied with the outdoor unit, additional charge will be required.
CHARGING BY SUPERHEAT.
HORIZONTAL CONVERSION KIT 4PXC*U Upflow to Horizontal Left
July 2014 Tuesday’s Tech Talk or “3T Meeting”. A fallen tree knocked over a homeowner’s Trane condenser in Kansas. The condenser looks like a goner. It’s.
© 2012 Delmar, Cengage Learning Automotive Plumbing: Tubing and Pipe Chapter 24.
1 HVACR316 – Piping Tubing and Piping. 2 Purposes of Tubing and Piping Provides a path for refrigerant to take Provides a means to return oil to the compressor.
Metering Pump Spare Parts Replacement. Pump Components (Metering Pump) Pumps are supplied with a 120VAC or 240VAC power cord. Use care to ensure pump.
AS100 Installation Air Tight Solutions The only solution AS100 Valve Stem Adapter Small O-ringLarge O-ring Standard Brass Valve Stem If you purchased your.
Left Side Discharge Pressure Regulator
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
Installation. Indoor Unit Installation Typical Installation.
RPDA 4A 2½” – 6”. Modification Overview  Production of the RPDA 4A series began in  The RPDA 4A can utilize either a Type I or Type II bypass.
HORIZONTAL CONVERSION KIT 4PXC*D Downflow to Horizontal Right
TUBING AND PIPING.
COMMERCIAL REFRIGERATION
Refrigeration Components
SWEEP CHARGE PROCEDURE Page SWEEP CHARGE EQUIPMENT & SAFETY TANK OF LIQUID REFRIGERANT DO NOT: Drop or handle tank roughly Tamper with the safety.
HVACR312 - Refrigeration Metering Devices.
EXPANSION VALVE SYSTEM
1 Hose and Lines. 2 High side / low side System with an expansion valve High SideLow Side Condenser Evaporator Receiver/Drier Compressor Expansion valve.
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
New Mexico FFA Agricultural Mechanics Career Development Event Plumbing.
LHCb-VELO evaporator CoBra Calculation and feed through ideas. 18 February 2015 Bart Verlaat 1.
Installation. Indoor Unit Installation Typical Installation.
CARBURETED FUEL SYSTEM
Start an Intravenous Infusion 081-T Administering Intravenous Fluids Through a Saline Lock 081-T
Refrigerant Piping A Trane Air Conditioning Clinic Air Conditioning Clinic TRG-TRC006-EN © American Standard Inc
Air Conditioning Metering Devices.
Installation. Indoor Unit Installation Typical Installation.
March 19, ” Leg Valve Changeout. Required Tools and Materials 3” Wrench 9/16” Wrench 11/16 Wrench Seal Pick Clean hydraulic fluid.
350, 350A 2½”-12”. Modification Overview  Production of the 2½ - 10” sizes began in  Production of the “A” models began in This Indicates.
Plumbing Theory. DWV System The DWV Drain-waste- vent system in plumbing a system that removes sewage and greywater from the house/building and it also.
Grapple Housing Top Sub Grapple Collet Seal Housing Bottom Sub Seal Housing Metal Seal Ring.
SP05 SP04 SP03 SP02 SP01 SP11 SP10 SP09 SP06 SP07 SP08 BRAZING JOINT DETAILS Brazing joint no Joint Name /Description SP01Suction to valve joint SP02.
XR621 Drive Hose Update Kit. Removal Turn off Battery dis Drain hydraulic tank Remove both rubber lines under chassis and discard. Remove and discard.
5000CIV 21/2”-10” 5000CIV 21/2”-10”. Modification Overview  Production of the 5000CIV (Watts 909RPDA) began in 1998 and is current.  The 5000CIV utilizes.
450 4”-10”. Modification Overview  Production of the 4” - 10” sizes began in  The lead free version (XL) was introduced in 2011.
7 A/C System Components, Operation, and Service.
EBS-1 # COOLANT FLUID EXCHANGE QUICK REFERENCE ATTENTION: Using the Coolant Fluid Exchange requires the FILL and VAC Valves on the SERVICE.
Gauge Installation and Removal Procedures By: Inmer Amaya.
Fixing a Leaky Sink Copyright © Texas Education Agency, All rights reserved.
Fixed Orifice Tube Cycling Clutch System (FOTCC)
Air Pak Drying Systems Presented By: Dry Air Systems, Inc. Innovator of Unique Regenerative Desiccant Air Dryers For Compressed Air & Fluid Power Controls,
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
All Models of KMDSI Helmets SIDE BLOCK / DEMAND REGULATOR
RPDA 4AN 21/2” – 6”.
DCDA4A 21/2” – 6”.
DCDA4AN 2½” – 6”.
Valve Manifold Assembly/Disassembly
3000CIV 21/2”-10”.
450 2½”- 3”.
DC-500 ½”- 1”.
350, 350XL ¾”- 1”.
DC4A 21/2” – 6”.
709DCDA 2½ ”-10”.
2000CIV 2½ ”-10”.
4000CIV 21/2”-10”.
DC4AN 2½” – 6”.
Thank You For Purchasing Coeur Designs 11” Shower Extension
Servo Pilot SFP-150 to 1500.
709 2½ ”-10”.
 R2 Four Basic Components of a Refrigeration System #4 Metering Devices.
Presentation transcript:

How to apply a TXV kit to an evaporator coil – Initial installation TXV Kits How to apply a TXV kit to an evaporator coil – Initial installation

Coil Preparation Relieve the pressure from the coil by loosening the 13/16 nut 1 turn only. Remove the nut and discard the black seal

Coil Preparation Remove the check piston and discard

Coil Preparation Use a tube cutter to remove the spin closure on the suction line

Coil Preparation Remove the tailpiece clamped to the exterior

Suction Line Connection Slide back the suction line grommet before brazing Insert the TXV equalizer line with flare nut into the grommet Then insert the suction line tubing (line set)

Suction Line Connection Braze suction line tubing (line set) to the suction line field connection on coil

Expansion Valve Connection Connect expansion valve outlet to flowrator body. Make sure Teflon seal is in place

Expansion Valve Connection Slide the 13/16 nut into position. Braze tailpiece to the liquid tube (line set)

Expansion Valve Connection AFTER THE TAILPIECE HAS COOLED, position the white Teflon seal and hand tighten the nut

Expansion Valve Connection Torque the 13/16 nut to 10-30 ft/lb

Expansion Valve Connection Connect equalizer tube with 1/4 flare nut to suction line fitting on the suction manifold (internal to the case)

Expansion Valve Connection Torque to 8-10 ft/lb Dress the tube to avoid rubbing and replace the grommet

Expansion Valve Connection Secure expansion valve bulb to suction line (exterior to the case) with banding straps provided at the 10 o’clock or 2 o’clock position IMPORTANT: Insulate the bulb and adjacent area

Wrap Up Finally – Check for leaks

Thank You!