Construction Delays & CPM Schedules

Slides:



Advertisements
Similar presentations
Chapter 6 Practical Methods to Reveal CPM Covert Activities
Advertisements

B. Progress Schedule Schedule Costs –2002 C&MS … the cost of preparing and updating the schedule is incidental to all contract items. –2005 C&MS.
CARLIN LAW GROUP, APC Grounds for Additional Time and/or Compensation A.Express Changes B.Constructive Changes C.Differing Site Conditions D.Express Suspension.
Presentation by: Tshewang Gyeltshen. The SBD is prepared in line with the PRR 2009 & SBD Large Works General principals of procurement to be applied prescribed.
CARLIN LAW GROUP, APC Dispute Resolution Procedures Contract Claims Requirements Public Contract Code § (schools) Public Contract Code §20104 Government.
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
CP Chapter 4 Schedule Planning.
Management Information Systems [MOIS470]
International Accounting Standard 37
ATLANTA | CINCINNATI | CLEVELAND | COLUMBUS | DAYTON | NEW YORK | WASHINGTON, D.C. Lawrence M. Prosen, Esquire Partner, Thompson Hine, Washington, D.C.
1 Counting the Chickens While They Hatch and the Double Edged Sword of Tracking Project Claims and Delays Plenary Session 4 ABA Forum on the Construction.
Having Fun with Gantt PERT &.
Contract Time and Claims Construction Engineering 380.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
Darren R. Krattli Eisenhower Carlson PLLC Mechanics’ and Materialmen’s Liens: Start to Finish RCW Main: (253) Direct: (253)
Texas Real Estate Contracts 4 th Edition © 2015 OnCourse Learning.
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
CE 405 – SCHEDULING CRITICAL PATH In order to be an effective Scheduler/ Project Manager – and realizing that you will have too many things demanding your.
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 2 Key CPM Scheduling Terms.
Importance of Project Schedules
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
Delay Claims from the Owner and Contractor’s Perspectives
Construction Engineering 380 Contract Changes. Types of changes –Cardinal change- drastic change, either single direction or accumulated change in scope.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 3 Requirements of a realistic CPM schedule.
HIT241 - TIME MANAGEMENT Introduction
Construction: Legal Issues. Legal Issues In the Bidding Process Timing of various activities has legal implications. During the bidding process: –A bid.
Amin Salari, CCM, PMP, LEED AP – Lundgren Management
Mark Kelly McKinnon Secondary College Gantt PERT Having Fun with &
Facilities Institute July , 2012 Houston, Texas CONSTRUCTION AND RENOVATION WARRANTY/GUARANTEE What Do You Get And When Does It.
CONTROLLING TIME. ”Remember that time is money” Benjamin Franklin 1748.
NOTICE OF CLAIM – HOW TO AVOID THE TRAP© LAW OFFICES OF MICKEY BEISMAN
Compensation events and claims Presented by Prof. Khem Dallakoti.
~ pertemuan 6 ~ Oleh: Ir. Abdul Hayat, MTI 03-Apr-2009 [Abdul Hayat, Project Time Management, Semester Genap 2008/2009] 1 PROJECT TIME MANAGEMENT.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
© Construction Management Association of America. Do Not Duplicate or Reproduce. Standards of Practice Course CPM Scheduling Lab.
Chapter 15 Construction Scheduling. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify.
King Fahd University of Petroleum & Minerals
General Condition THE EMPLOYER Construction Law Supervised By : Dr. Kamalain Shaath Prepared By : Eng. Fawzy El.farra.
LECTURE 4 FORMULATION & PRESENTATION OF MONETARY CLAIMS  Recovery of Loss / Expenses / Damages  Notice of intention to claim  Particular and further.
DISASTER PLANNING LESSONS LEARNED September 16, 2014 Carol Musumeci, Risk Manager, Brookfield Properties Jim Boccher, VP Commercial Disaster Restoration,
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
Project Closeout Module #14 Prepared by Dr. Randy R. Rapp July 2005.
Project Schedules The Cabinets New Categories of Scheduling.
Copyright © 2003 Primavera Systems, Inc Primavera User Conference Schedule Bingo presented by Mike Stone w/Professional Project Management Services.
Introducing Project Management Update December 2011.
CHANGE WORK ORDER A change work order may be issued by implementing official any increase or decrease in quantities of original work items in the contract.
Project Management.
Improved Project Control Through CPM Scheduling What Owners, PM’s and CM’s Need to Know t H E T I B U R O N T I B U R O N G R O U P, L L C G R O U P, L.
Project Time Management
Measurement and Payment
CLAIMS MANAGEMENT. PRESENTATION OUTLINE INTRODUCTION TYPICAL CLAIMS AGAINST OWNER TYPICAL CLAIMS AGAINST CONTRACTOR CRITICAL PATH METHODS UTILIZATION.
University of Calgary Continuing Education Construction Contract Law and Documents Week 12 Changes Delays Claims Contract Documentation.
Dr. Hany Abd Elshakour 2/18/ :27 PM 1. Dr. Hany Abd Elshakour 2/18/ :27 PM 2 Time Planning and Control Activity on Arrow (Arrow Diagramming.
CVE 4070 Construction Engineering Changes & Extra Work Prof. Ralph V. Locurcio, PE.
Unit 2 Time Management Prepared by: Prof. Seemaah Keddar.
Managing Schedule Slack/Float PMI Scheduling Forum January 6, 2015 January 6, 2015 Presented by: Ric Albani, PMP, PMI-SP, PMI-RMP, MCTS.
Helen S. Henningsen Department of Veterans Affairs Office of General Counsel.
Christopher Jozwiak Baillon Thome Jozwiak & Wanta LLP Penelope Phillips February 19, 2016 Termination & Retaliation 1.
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
CE 366 PROJECT MANAGEMENT AND ECONOMICS Robert G. Batson, Ph.D., P.E. Professor of Construction Engineering The University of Alabama
Establishing and Managing a Schedule Baseline
Extension of time and how it is granted to a contractor (Referencing JCT 2005)
ENGINEERING MANAGEMENT (GE 404)
CHAPTER 6 PROJECT TIME MANAGEMENT
How to perform Time Impact Analysis / Window Analysis in Primavera P6
Project Scheduling Basics Activity on Node Precedence Diagrams
5th Annual Construction Berkeley Research Group
Contract Changes Construction contracts are unique because owner can make unilateral changes to contract (with consideration)
CHAPTER 6 PROJECT TIME MANAGEMENT
Presentation transcript:

Construction Delays & CPM Schedules Recognize different types of delays Understand how to use P3 to measure and quantify the delay incurred Document the delay Request additional time

Types of Delays Non-Excusable Excusable but Non-compensable Excusable and Compensable

Non-Excusable Contractor did it to himself Poor Performance Missed the Estimate Wrong Resources Employed

Non-Excusable (cont.) Contractor gets NO additional TIME Contractor gets NO additional MONEY

Excusable but Non-compensable Delay Event Not controlled by the Owner Not controlled by the Contractor

Excusable but Non-compensable (cont.) Depends on contract, but typically: Force Majeure Issues Acts of God National Strikes War

Excusable but Non-compensable (cont.) Granted Additional Time NO Additional MONEY

Excusable but Non-compensable (cont.) Owner Caused the Delay Defective design Slow return of shop drawings Change orders Defective Owner-supplied equipment

For Recovery of Time and Money First test a delay must pass… Excusable Compensable Second test a delay must pass… Critical Delay - or - Non-critical Delay

Critical vs. Non-critical Delays Critical Delay – must impact project completion Non-critical Delay – does not impact project completion

Importance of Longest Path No additional days unless project is delayed Critical Delays must be on the Longest / Critical Path Delayed activities that do not impact project completion merely consume float and are Non-critical Delays (Float belongs to the project, unless otherwise noted in the contract)

Ownership of Float Generally accepted principal that float belongs to the project First person who needs it can use float Can not hoard, squander, or waste float Contract may state unequivocally that float is owned jointly or belongs to one party or the other – in that case the contract rules

Schedule Must be a Real CPM Activities must resemble the work to be performed Logic must be based upon the physical constraints of constructing the project All of the Activities must be driven by valid and realistic logic

Schedule Must Be a Real CPM (cont.) All activities must have a predecessor and a successor (except start and completion) There has to be a critical path from the data date through completion Avoid frivolous use of constraints Avoid lags (absolutely no negative lags)

Schedule Must Be a Real CPM (cont.) Try to use Finish – Start as the primary logic tie Accurately reflects actual progress (real actual starts and finishes – don’t just plug 100%) Correct logic busts or changes in the plan as they occur

The Longest Path is the Critical Path Any Delay on this path would impact project completion – Critical Delay

Schedules Must be Reliable CPM schedules are the best way to demonstrate a delay if used properly… The schedule must be reliable Delays must be shown properly (Results should be repeatable by others)

Delay Between Events Insert delay event into the schedule Don’t change the logic of the schedule – add logic instead

Critical vs. Compensable Just because a delay is Critical does not mean that it is Compensable The Contractor MUST demonstrate the cause not only impacts the critical path but also that the owner is the cause of the delay event

For an Activity Delayed in Progress, Break Delayed Activity into Two Portions First activity is the portion not delayed Add activities for Delay Event Unimpeded Portion of the Original Activity

Activity Delayed In Progress Break the activity into two portions Unimpeded & impeded portion Total duration should be the same as the original Insert the delay event between the two portions

A Lesser Used or Claimed Delay Excusable and Compensable but not Critical Activity delayed, additional cost incurred, but project completion not impacted Very common but rarely claimed

Delays and Float

Delay Event ? Compensable?

Delay Event ? Compensable? (cont.) Yes. It is a delay event… It may be compensable if it was caused by the owner or under the owner’s control & increased the contractor’s cost The project completion is not impacted, therefore it is not a CRITICAL DELAY No time extension is warranted

Delay Event Changes Critical Path

Non-critical Delay Becomes Critical Delay event consumes all available float Original chain of two activities had a duration of 4 days with 7 days of float Now chain of three activities has a total duration of 11 days with Zero Float

Delay was 7 days May or may not be Excusable May or may not be Compensable It is definitely critical

If the Delay was Excusable, the Contractor would receive a time extension of ONE (1) additional day (doesn’t matter if it is compensable of non-compensable)

Documenting Your Delay MUST follow the contract provisions Preparation of the schedule Notice of Delays (must be timely) Proper backup documents, correspondence, change orders, meeting minutes, etc. Demonstrate the delay using contemporaneously prepared schedules

Typical Contract Language “No contract adjustment will be allowed unless the Contractor has submitted the request for an adjustment within the time prescribed.” “Not filing a protest by the end of the next estimate period for any time statement will indicated the Contractor’s approval of the time charges as shown on that time statement and future consideration of that statement will not be permitted.” TxDOT

Typical Contract Language “Claims by either party must be initiated within 21 days after occurrence of the event giving rise to such Claim or within 21 days after the claimant first recognizes the condition giving rise to the Claim, whichever is later. Claims must be initiated by written notice to Architect…” AIA Documents

Typical Contract Language Requires Timely notice - extremely important Must connect cause to the delay Accurately document start and end of delay Demonstrate impact of delay event

Evaluation and Presentation of Delay Different names for the same thing Time Impact Analysis Statement Time Impact Evaluation Form Schedule Analysis Delay Analysis

Examples of Time Impact Evaluation Forms Borrowed from “CPM in Construction” by James J. O’Brien

Create & Use A TIA Form No hard rules on what it looks like, but it must: Connect delays to cause of delay Connect delays to activities in the schedule Measure the delay

Example TIA Form Tell a compelling story of what happened and why it is not your fault Connect cause of the delay with activities in the schedule Measure the impact of the delay event DOCUMENT THE DELAY EVENT FOR THE RECORD

Issue of Concurrent Delays: Not a Problem if… Schedules are maintained as accurately as possible Contemporaneous schedules are used to measure delays Delays are measured one at a time, in chronological order, as they occur

Ten Commandments of the Schedule Expert Thou shall not rely on a schedule that was not followed during the project Thou shall consider actual performance Thou shall avoid “As-planned plus Impacts Analyses” Thou shall establish a correlation between the plan, changes, actual performance, and contemporaneous records Thou shall consider “Your Own Delays” in a delay analysis

Ten Commandments of the Schedule Expert (cont.) Thou shall keep schedules current and reflect delays as they occur Thou shall involve the right people in the delay analysis Thou shall be objective and avoid adversarial interests that damage credibility Thou shall recognize the right to finish early Thou shall recognize reasonable resource leveling Borrowed from “Construction Law Handbook” by Robert Cushman & James Myers

Questions? Open P3 and demo the Restrictions dialog box. Access rights: Access rights defined at the project group and project level You can give users different access rights at the project group vs the project level, i.e. maybe you want them to be able to schedule their own project, but not other people’s projects. Restrictions: Filter activities Allow users to only view a specific set of activities based on a filter setup within the project. For example, maybe you want users to enter actuals into only their own activities – create a filter based on that resource’s ID. Limit functionality Set up project office administrators with the rights to change dictionary information (activity codes, resources, etc), but not activities/relationships. Set up project managers to modify activities/relationships, run global changes, and schedule – but not change dictionary information that could adversely affect other project managers within the same project group. PROJAC2.P3 file: Now available via ODBC Great time saver for an organization that has many users. Create a restriction setting for a specific type of user, such as a project manager. Use ODBC to access the database tables directly and then copy and paste the access rights settings to other users.