Snowstorm, roads closed 3 days. Serious snowblowing equipment on site when we arrived Thursday morning.
A ray of sunshine
Typar on the outside, prepping the window openings
Traffic moving on the County Road in bright sunshine
First window installed in the addition
Second window
Snow everywhere but very pretty
Third window
Fourth window – all these face east
Fifth window – southeast corner
6 & 7 – awning windows
Typar moisture barrier on the exterior
Work truck at hand
8 & 9 installed – southwest corner
Windows 10 & 11
Window 12 – opened up the entrance doorway to clean out the interior of the additon
6 mil poly doorway (for now)
Starting to take shape
Cut off the old roof overhang
We’ll cut it up in movable pieces
Ryan cutting it into pieces
Soffit vents installed, Roxul insulation plugs the holes
The vents are stapled to the roof sheathing
Oscar staring down Ryan’s lunch
One of the boys created this sign
Hurricane clips installed to hold the trusses – new ceiling joists in the entrance