Preparing for the CD-2 Review Elton Smith Hall D Collaboration Meeting October 12-14, 2006.

Slides:



Advertisements
Similar presentations
Learner-Centered Education Course Redesign Initiative Builds upon work of prior LCE grants Will award grants of $40,000 - $50,000, with the option.
Advertisements

NANPA Oversight Working Group Status Report to the NANC March 20, 2001 Chair Pat Caldwell.
Formulation, planning, budget information provided by Department of Planning & Evaluation Analysis and Preparation of Funding Resolution Approval of the.
BigBite Wire-Chamber Status Report Brandon Craver University of Virginia Hall A Collaboration Meeting June 23, 2005.
Overview of the GlueX Tagger and Photon Beamline..
PAC Nuclear Physics, 1-2 April, 2004 Construction of the IREN source (the theme /2004). Status&perspectives-proposal on the extension W.I.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
Downstream PID Review Alan Bross MICE CM 16 October 8, 2006.
Upstream PID Review Alan Bross MICE CM 16 October 12, 2006.
Elton S. Smith University of Virginia October 25, Overview Bremsstrahlung Tagging Spectrometer and Photon Beam Review Elton S. Smith Jefferson Lab.
The Tagger Microscope Richard Jones, University of Connecticut Hall D Tagger - Photon Beamline ReviewJan , 2005, Newport News presented by GlueX.
Brenna Flaugher Oct. 31 th CDF Meeting1 RunIIb Silicon Project Successful Lehman Review Sept Workshop at LBL 10/23-10/25: Wednesday-Thursday  hybrids.
Tagging spectrometer and photon beamline Review January 23-24, Response to Questions Bremsstrahlung Tagging Spectrometer and Photon Beam Review.
NuMI Offaxis Costs and Whither Next Stanley Wojcicki Stanford University Cambridge Offaxis workshop January 12, 2004.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
23 July, 2003Curtis A. Meyer1 Milestones and Manpower Curtis A. Meyer.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
Fermilab Implementation of DOE Critical Decision Process FRA Project Management System Presentation by L Edward Temple Jr Head, Office of Project Management.
1. 2 Outline Contract Status  Q.A. plan  construction plan Preparations for construction  populating the construction space Microscope electronics.
20 October, 2004GlueX Detector Review 1 The GlueX Detector Curtis A. Meyer This talk Next talk.
Integration GlueX Detector Integration Mission: To ensure systems meet or exceed physics driven goals To ensure that detectors are designed in a sensible.
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
Mu2e Mu2e Status Andy Hocker, Technical Division All-Experimenters Meeting 8-JUN-2015.
WP1.2 – Photon Detectors Stephan Eisenhardt University of Edinburgh  Budget  Milestones  Progress Report  Partners: International Collaborating Groups.
Status of the Beamline Simulation A.Somov Jefferson Lab Collaboration Meeting, May 11, 2010.
Thomas Jefferson National Accelerator Facility Page 1 IPR October 18-20, 2011 John J. LeRose Independent Project Review of 12 GeV Upgrade Jefferson Lab.
The GlueX Detector 5/29/091CIPANP The GlueX Detector -- David Lawrence (JLab) David Lawrence (JLab) Electron beam accelerator continuous-wave (1497MHz,
Project Overview How to get here…. Half Way to the Test Run October 18, 2012HPS Project Overview2 …starting from here? John Jaros HPS Collaboration Meeting.
May Status of FCAL Issues to be addressed at the detector review.
JLab preparations for upgrade, FY05 budget Elton Smith Hall D Collaboration Meeting May 20-22, 2004.
12 GeV Upgrade Project Status Allison Lung Hall C Users Meeting Jefferson Lab January 18, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
Electromagnetic Calorimeter for the CLAS12 Forward Detector S. Stepanyan (JLAB) Collaborating institutions: Yerevan Physics Institute (Armenia) James Madison.
U.S. Muon Accelerator Program: MICE Milestones & Resource-Loaded Schedule M. A. Palmer, Director October 31, 2012.
Hall D Design Status GlueX Collaboration Meeting JLab, December 11-13, 2003 Ravi Anumagalla.
Hall D Electronics Review (July 23-24) Elton Smith Hall D Collaboration Meeting August 4-6.
Opening Remarks Alex Dzierba GlueX/Hall D Collaboration meeting - Jlab - Dec 11-13, 2003.
1 Collaboration Meeting JLAB January 2008 Project Status Update E.C. Aschenauer.
CBM RICH working group GSI, Germany Bergische Universität Wuppertal (BUW), Germany Hochschule Esslingen (HSE), Germany PNPI Gatchina, St. Petersburg, Russia.
Latifa Elouadrhiri Jefferson Lab Hall B 12 GeV Upgrade Drift Chamber Review Jefferson Lab March 6- 8, 2007 CLAS12 Drift Chambers Simulation and Event Reconstruction.
10/25/2007GlueX Collaboration Meeting1 October 25-27, 2007 Jefferson Lab This is approximately our 20’th such meeting.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
MICE CMPB Alain Blondel 1 Highlights on MICE.
Budget Status and FY03 Requests Elton Smith Hall D Collaboration Meeting Sep 12-14, 2002.
1 Participation of the Joint Institute for Nuclear Research (Dubna) in PANDA experiment at Future GSI Facility Nuclear Structure Physics Physics with Antiprotons.
The GlueX Detector in Hall-D at Jefferson Lab February 16, 2010 David Lawrence, Jefferson Lab (for Curtis A. Meyer, Carnegie Mellon University) July 7,
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
Working group on photon vetoes Meeting on June 7 th : 1.Status of Geant4 simulations 2.Discussion on LAV structure 3.Discussion on readout 4.News on Spaghetti.
Forward Tagger Simulations Implementation in GEMC Moller Shield Tracking Studies R. De Vita INFN –Genova Forward Tagger Meeting, CLAS12 Workshop, June.
Budget Status and FY04 Requests Elton Smith Hall D Collaboration Meeting Dec 11-13, 2003.
Tagger microscope beam test results and readiness for construction what we learned from construction of the prototype and the parasitic beam tests in Hall.
960 fadc tdc 2500 fadc 3240 fadc 168 fadc tdc 192 fadc tdc 2900 tdc fadc 40 fadc start 40 fadc tdc upv 21 fadc 5 Kbytes/event x 200 KHz level 1 =
Head, Office of Project Management Oversight (OPMO)
Project Management W. J. Foyt
MICE CM31 Schedule summary
HCAL M&O-B Budget CMS Finance Board
Overview of CLAS12 Calibration
Preparations for a Lehman Review
Status, Misc Elton Smith Feb 21, 2003.
Preparation of the CLAS12 First Experiment Status and Time-Line
CLAS12 Timing Calibration
Tagger Microscope Detector & Electronics Status
Polarized Source: Recent Activities
Ciprian Plostinar Workshop on Testing and Commissioning
A High Intensity Neutrino Oscillation Facility in Europe
Imaging & Engineering STAP Meeting 12th-13th of April 2018
Presentation transcript:

Preparing for the CD-2 Review Elton Smith Hall D Collaboration Meeting October 12-14, 2006

Internal FY06 Project Milestones  Hall D Tagging Spectrometer and Photon Beamline Review (23-Jan-06) Report on barrel calorimeter fiber tests (30-Jun-06) Report on tagger prototyping (30-Jun-06) Report on Cerenkov readout and optics studies (31-Jul-06) Report on UPV prototyping (31-Jul-06) Report on FADC prototyping (31-Aug-06) Report on auxiliary electronics prototyping (31-Aug-06) Report on full-scale prototypes of FDCs and CDCs (30-Sep-06)  Recommendation #27 IPR Sec 2.5 (30-Jun-07)

Outcome of the Upgrade Status Review (June 2006) The main recommendation was to schedule a “Mini-Review” to assess CD-2 readiness at mid-year Pre-briefing material due Dec 1 Main emphasis is on “resource-loaded schedule” TJSO-led review Dec Lehman/DOE-NP review results late Jan

Resource-loaded schedule schedule For “Mini-review” match schedule to Cost Book Cost book is unchanged since 2005 except for minor changes in fy07 Schedule will be updated next spring with realistic updated costs and plans in preparation for CD-2

Outcome of the Upgrade Status Review (June 2006) Final report: 19 recommendations For Detector Systems: Continue development of full detector simulation and reconstruction studies with the goal of validating that detector designs meet physics performance requirements for Halls B and D. Conduct external peer reviews of Hall B and D detector designs and of superconducting magnet designs in time to impact the baseline designs of these subsystems. November Software Workshop to address first bullet

Hall D Milestones for FY07 Decision on readout for barrel calorimeter Drift chamber design requirements finalized (Rec #27)

Safety list for each subsystem Safety issues that might arise during preparations and construction List of ways to mitigate those issues Specific safety reviews that might be needed Send them to me by the end of this meeting

FY07 R&D Reports WBSDescription from R&D PlanSpecific Technical DeliverableCompletion Milestone R&D: Hall D Report on barrel calorimeter fiber tests Measure the energy and timing resolution of the prototype barrel calorimeter module. Verify the timing resolution for 600 MeV photons is less than 250 ps [WKB1]. [WKB1] 30-Apr-07 Report on tagger prototypingDetermine suitability of Silicon Photo-Multipliers for the readout of the Hall D Tagger Microscope. Verify that silicon PMTs perform at least as well as conventional PMT’s [WKB2]. [WKB2] 30-Jun-07 Report on Cerenkov readout and optics studies Determine the optimal photomultiplier tube for the Hall D Cerenkov counter. 31-Aug-07 Report on UPV prototypingDetermine the optimal wave-shifting fiber choice and grooving technique for the Hall D Upstream Photon Veto. 31-Jul-07 Report on FADC prototyping energy sums Complete fabrication and testing of prototype v1 of the energy-sum module. Verify that these boards can operate at 2.5 gigabits per second [WKB3]. [WKB3] 28-Feb-07 Report on full-scale prototypes of FDCs and CDCs Develop the fabrication technique for mounting full- scale cathode planes of the Forward Drift Chambers. Verify that a flatness of 200 microns can be achieved [WKB4]. [WKB4] 30-Sep-07

CD-2 Establishes the baseline budget for construction Reviews preliminary design (~35%) Requests construction funding Conducted by DOE-NP and OECM

Deadlines CD-2 is expected next summer. Pre-briefing material needs to be in place by ~April Decisions impacting the review must be made by ~Jan at the latest Decisions at this meeting Plans for the solenoid Cerenkov Detector

Manpower Manpower plan for 6 and 12-GeV is working its way through the system. Manpower has been identified as existing at the lab or requiring external hires Time is needed for new hires even after approval Key Personnel Hall D engineer (note: falling between the cracks) Electronics coordinator Cerenkov detector My proposal Try to re-direct existing manpower for fy07 Start hiring new personnel in coordination with new group leader as soon as practical

Independent Project Review Recommendation Recommendation #27 IPR Sec 2.5 (30-Jun-07) “Develop a plan for readout of GlueX barrel calorimeter based upon conventional photomultiplier tubes. The plan should include fiber routing, end iron configuration, shielding, and cost estimate.” Solenoid fringe fields have been computed. Ravi has developed drawings that show realistic distances and possible locations for conventional pmts in the fringe fields of the solenoid. Budgetary estimates for clear fibers and conventional pmts are under way. PR has been submitted for NKUA to investigate the use of field-resistant pmts with the barrel calorimeter.